Slide 1 - Thuslick Inc. - What can Thuslick do for you?

Download Report

Transcript Slide 1 - Thuslick Inc. - What can Thuslick do for you?

www.Thuslick.com
Email – [email protected]
281-477-0611
Houston, Texas
Introduccion



Que es Thuslick?
Quien es Thuslick?
Casos Historicos.
Distribucion Mundial
Tecnologia Patentada
Servicio al Campo
Caracteristicas



Descripcion de Thuslick.
Donde trabaja mejor?
Porque trabaja?
Beneficios
Reporte

Reporte

Reporte

Reporte

Reporte

Reporte

Reporte

100% Ecologico.
Termicamente estable hasta > 600o C.
Minimiza las fuerzas de friccion y la torsion rotativa.
Reduce el filtrado APAT (HTHP).
Reduce la perdida de fluido hacia la formacion.
No afecta la Reologia.
Reduce Costos.
Beneficios Addicionales
Reporte

Reporte

Reporte

Reporte

Efectos en el Filtrado.
Return Permeability.
No es Toxico.
Manual de Thuslick.
Reportes de Laboratorio





IMP Report
Stillmeadow Report
Westport Report
Mud Tech – PEMEX
Oil Tech Particle Sizing
Recomendaciones






MI SWACO - Venezuela
Pride Foramer
The Brief Report
MI - U.S.
Egypt
Phillips
Como Pedir



ITS – Houston – Contrato Marco
PEMEX – Proveedor Registrado
Thuslick Inc. – Oficina de Ventas
[email protected]
(281) 477-0611
FIN
TM
Que es THUSLICK
Plumbego






Area Siliconizada
THUSLICKTM es un Plumbego/Micronizado Siliconizado
en polvo pulverizado hasta + - 24 Micras.
Empaquetado en sacos de 25Kg (55Lb)
THUSLICKTM es completamente inerte en el lodo
Termicamente estable hasta > 650o C
Universalmente compatible con cualquier tipo de fluido.
THUSLICKTM es 100% Ecologico.
Return
Quien Es THUSLICK




TM
THUSLICKTM es un producto fabricado y distribuido por
Thuslick Inc. de Houston Texas a todas partes del mundo,
La materia prima viene de Mexico,
Se recibe el material en Houston y se mezcla con otros
elementos utilizando un proceso patentado,
Ya procesado se empaqueta en sacos de 25Kg (55Lb)
Return
Casos Historicos
USA
Denmark
Argentina
Return
Venezuela
Mexico
Angola
Norway
Mexico
North Mexico Mission Field
Operator was drilling at 2963 meters. The drilling rate
was approximately 3 Mts. an hour with very high torque,
causing the rotary to stall at times. The hole was also very
tight on connections. The well was on day 117 and they
already had four sidetracks. The angle of the sidetrack
was 36.9 degrees. And the flowline temperature was 140
degrees F. hole size was 6" with 1678.66 Mts. Of 7"
casing set.
The operator had decided to abandon the hole when
it was decided as a last resort to add Thuslick™ to the oil
mud system.
The operator added 6 ppb of Thuslick™ to the mud
and torque started to come down as soon as Thuslick™
went around the bit. Drag and torque were reduced and
the drilling rate increased to 10 to 15 Mts. A short trip was
made at 3142 Mts. And no drag was encountered. Lost
circulation was encountered at 3148 Mts. And the mud
weight was reduced from a specific gravity of 1.6 5 to 1.4
Circulation was reestablished and drilling resumed at 3 to
4 mph, increasing to 7 mph. This rate continued to T.D of
3400 Mts. with no further hole problems.
The penetration rate increased over 150% after the
addition of Thuslick™.
North Mexico Argos Field
The operator drilled 6" hole to 4100 Mts. and
began trying to log. Casing was set at 2670 Mts.
and the bottom hole temperature was 175
degrees C. Logs were run to bottom with no
problem but drag was so bad coming out of the
hole that was impossible to log the well.
The Operator added 9 ppb of Thuslick™ to
the open hole volume of the drilling mud, and
spotted it in the open hole. The drag was
eliminated and the well was logged successfully.
Central Mexico
Drilling at a depth of 5751 Mts. with a polydrill mud system well began
experiencing torque running from 460 to 600 amps. This well was being
drilled using 4.5" drill pipe with 6" drill collars, and 8 3/8" hole size a
decision was made to add Thuslick™ in a concentration of 4.5 ppb. The
torque dropped immediately from 450 amps to 200 amps and remained
there. The fluid loss dropped from 11cc’s to 6.0 cc’s, and the penetration
rate increased 27%.
At 18995' the operator decided to core. Coring took place with 450
amps and they cut two and a half meters of core at 18 minutes per meter.
Return
The operator was very happy with the increased drilling rate,
lower fluid loss, and reduced torque and drag.
Well: Mitchell # 2-34
Field: Carter Knox
Date: February 23, 1998
This well was drilled with oil
base mud to the top of the
Anadarko, a thick and very
hard limestone formation.
USA
Location: Grady County, Oklahoma
Rig: Bayard # 46
Marathon Rep. On site: Sam Nabors
BEFORE THUSLICK
AFTER THUSLICK
Pick up weight
325K
Pickup Weight:
300K
Slackoff weight:
190K
Slackoff Weight:
220K
Rotating weight
242k
Rotating weight:
242K
Torque:
75 psi
Torque:
125 psi to 150 psi
Rate of Penetration
Weight on bit
(Metal Cutting in mud)
1 ft/hr
7K to 8K
Weight on bit:
Metal cutting in mud:
Mud Weight:
10.5
Mud Volume:
1800 bbl
Bottoms up:
2 Hrs
Complete Circulation:
7 Hrs
Return
Rate of Penetration
2 to 4 ft/hr
12K – 13K
Nil-Trace
Well: RAIA 3H
Operator: Texaco Panama
Inc.
Date: November 30, 1997
Location: Block 2, Angola
Angola
Subject: Thuslick™ Test
Mud Company: Dowel
Thuslick™ was added
initially at the amount of 4
ppb over one circulation.
After one circulation
measured depth was 8922
ft. and the hole angle was 47
degrees.
The average rate of
penetration BEFORE
Thuslick™ was added was
18 ft / hr and the torque was
450 to 475 amps.
AFTER the addition of
Thuslick™, sliding started at
a rate of 22-23 ft / hr with
450 amps.
Return
Drilling and sliding continue with the angle building to 77 degrees by the time a bit
trip was made at 9919. Ft. During this interval, ROP increased to 43-45 ft/hr with
the torque increasing to 500 amps. Toward the end of this interval, ROP dropped
back into the 20-23 ft/hr range with the torque increasing to 550 amps.
After the trip, when drilling and sliding resumed at 8834 ft MD, ROP started at
23 ft/hr with 500 amps and gradually increased by 10000 ft to 40+ ft/hr with still
500 amps and only 6 to 10 amp fluctuation. At this point the angle was
approximately 80 degrees and building.
Overall the penetration rate was excellent and torque leveled off at around 500
amps. Drilling continued to 10480 where a 7" liner was run with no problem. The
hole angle was 90 degrees at this point.
The 7" liner was drilled out with a 6" bit and 3-1/2" drill pipe. Drilling and
sliding continued over the next 500 ft at an average penetration rate of 17 ft/hr with
440 to 450 amps. Drilling of the horizontal section is continuing at this time at a
depth of 12,700 ft with 470 amps and no problems.
Report written by Jim Saxon - Mud Engineer
WELL: VLG-3857
COMMENTS
Field: CEUTA FIELD
BLOCK VII AREA 8
Comparison with Wells VLG-3854 AND VLG-3844
Due to problems such
as drag, high torque, bit balling
and low ROP in the 12- 1/4" section
in the Ceuta Field Block VII, Area
8, and the elimination of the use of
the VASSA LP-90 Mineral Oil from
the formulation because of
environmental concerns, MI and
Foramer de Venezuela (Pride)
decided to use the product called
Thuslick™ in conjunction with the
liquid lubricants (VEN-LUBE +
LUBE 100) in the 12 1/4 phase of
the VLG-3854 and VLG-3857. All
problems previously exposed were
reduced utilizing a concentration
between 4 and 5 ppb of Thuslick™
and 1.7% to 2.28% (6-8 ppb) of the
liquid lubricants in the system.
Return
Venezuela
Products
Concentration PPB
Barite
143.69
Gel
4.31
Spercene
7.72
Tannathin
3.13
Asphasol
4.45
Pac R
0.54
SP 101
1.40
Dril Kleen
0.60
Lube 100
3.14
CaCo3
2.35
Lube 167
0.70
Mix II
0.10
Ventrol
1.89
XCD
0.09
Lime
0.826
Ven Lube
3.86
Thuslick™
4.00
Caustic Soda
1.65
Drilled 12 1/4" hole from
4500 ft to 6000 ft with ADL
fluid, pumping viscous pills
every 200', we displaced ADL
for Lignosulfonate mud at
6000 ft and drilled from 6000
ft to 14,485 ft. Short trips
were made from 7154 ft to
4480 ft with drag of 30 to 40
Klbs and, from 9981 ft to
6969 ft we did not encounter
any problems. From 11,980 ft
to 10,105 ft with drags of 40
to 60 Klbs, from 13,975 ft to
11,396 ft Pipe was pulled free
with pump and rotation from
13,066 to 11,424 ft. The
concentration of Thuslick™
was increased from 4 to 5
ppb to solve the drag
problem. The 12 1/4" hole
was DT at 14,720 ft. Caliper
log was run to 11,950 ft.
without any problems. 9-5/8
casing was run without
problems.
Denmark
Operator was drilling a horizontal section
in a North Sea development project.
With about 300 meters of horizontal hole drilled, the
operator began to experience severe drag and torque, and metal
shavings appeared in the cuttings. Thuslick™ was added to the
water based mud system at this point. Torque came down
immediately, and stabilized at a figure 15 Kft.lbs. for the rest of
the well. Metal shavings disappeared at once and the cuttings
have remained free of metal shavings since. The well was drilled
to T.D. (and additional 1600 meters) without further problems.
The operator was very pleased with the performance,
and has included Thuslick™ in
future mud programs for the development program.
Return
Argentina
Operator was drilling an
extended reach well
offshore to onshore in Tierra
del Fuego.
The well was drilled to 1800
Mts. where the curve was built
to 90 Degrees. Drilling continue
to 5580 Mts. where 9-5/8"
casing was run and cemented.
The casing shoe was drilled
and Thuslick™ was added to
the mud to relief torque
problems.
The concentration of
Thuslick™ was 4.8 ppb.
Return
BEFORE adding Thuslick™
the operator was sliding at a rate of 5 to 10 Mts. per Hour.
AFTER adding Thuslick™
the sliding rate increased to 18 to 20 Mts. per Hour
with a bit weight of 5 to 18000 pounds.
Rotary drilling resumed, and the Thuslick™
increased to 5.5 ppb. Drilling rates were 66
Mts. Per Hour with a torque 25 to 28
thousand foot pounds. The well was drilled
to T.D. at 6450 Mts. The final angle of this
well was 91 Degrees.
The normal coefficient of friction in the area is .20 to .25
with the addition of Thuslick™, the coefficient of friction was
reduced to .13 to .17.
The operator felt that Thuslick™ was very successful in
this application.
Well: 2/7A-22
Operator: Phillips Petroleum Co.
Date: 10/11/2000
Location: North Sea - Eldfisk Alpha
Norway
It is beyond any doubt, that Thuslick™ was
extremely efficient in this application,
and it may well have been one of the
main contributors in TDing the well as per plan.
Subject: Thuslick™ Test
When drilling 8.5" section on Eldfisk Alpha well no. A-22 excessive drag and torque were experienced. This caused severe
directional problems as steering and sliding became more and more difficult. Thuslick™ was added twice in 50 bbl pills with 4 PPB
concentration, but with little or no improvement in sliding. When pills returned to surface we found that Thuslick™ plugged the
screens. On the VSM 300 shakers we were running 240 as bottom screens to take out the majority of drilled chalk form the mud to
keep mud weight as low as possible. As the pill of Thuslick™ returned screens were plugged and we had to change to 120 mesh
screens to avoid losses. As a total of 400 lbs Thuslick™ was added to a circulation system of 1000 bbl it was not really expected to see
any positive effect from these two Thuslick™ pills. A couple of days later severe losses were encountered and we could not keep up
with mixing mud. As reservoir pressure is extremely low form depletion, an inexpensive mud of drill water with polymer normally
used. Due to severe mud losses, we now changed to seawater only, without any additives. Losses leveled off at 200bbl/hr. while
circulation at a rate of 800 bbl/hr. Now high and erratic torque was experienced, and Thuslick was added to the seawater.
CONCLUSION:
Conclusions drawn from using Thuslick™ when drilling 8.5" chalk reservoir section was very positive and contributed greatly in
completing the section as planned.
Positive findings:
Adding Thuslick™ had an immediate effect on drilling parameters. Torque was significantly reduced an made it possible to
continue drilling to target. The reduced torque also resulted in increased ROP (Rate of Penetration), with less WOB (Weight on
Bit). Even when we stopped adding Thuslick™ for some time, the torque remained low, indicating that Thuslick™ had successfully
added a lasting coating in the well bore and casing.
Return
Descripcion de Thuslick
1. Empieza con un Plumbago de Grafito.
2. Se une con silicon y otros productos
en un proceso Patentado.
3. Ya procesado la mezcla de
particulos trabaja mecanicamente en
el lodo, similar a baleros entre la
tuberia y la formacion.
Return
Donde Trabaja Mejor?
Desvio
Area de HTHP
Return
Porque Trabaja?
Lubrica el poso en el desvio.
Sigue lubricando hasta el fin.
Return
REOLOGIA
Effectos del Thuslick en la Reologia
(Lodo KCL/GYP )
90
80
70
60
Esfuerzo
50
Constante
40
lb/100pie2.
30
Lodo de Campo
+ 4ppb LUBE A
+ 4ppb THUSLICK
20
10
0
3
6
100
200
300
VISCOSIMETRO Fann RPM
Return
600
FILTRADO APAT (HTHP)
EFECTO DEL THUSLICK EN LODO KCL/GYP
30
25
Filtrate (ml)
20
Lodo de campo
15
FM + 4ppb
THUSLICK
10
5
0
H.T.H.P.
Return
API Fil.
Filtercake
TM
Effectos del THUSLICK
en el filtrado APAT
120
filtrado en ml.
100
80
Lodo Base
LB +3ppb Thuslick
60
40
20
0
0 min 1 min 3 min
Return
10
min
20
min
30
min
Westport Technology Center
RETURN PERMIABILITY TEST RESULTS
MUD FILTRATE RETURN PERMEABILITY TEST RESULT
MUD DAMAGE ASSESTMENT
Initial
Pressure Build - Up
MUD Return Perm . m D
Initial After Mud
Ki
Filtrate, Kf
A
374.2
261.8
B
331.1
69.9
C
320.1
170.5
D
352.7
174.6
352.7
72.5
352.7
50.6
352.7
41.3
E
403.6
124.8
403.6
66.6
403.6
60.2
403.6
49.2
F
370.5
270.6
G
368.9
258.7
Perm . At final or Vis.cp
Surface Perm m D During Mud Filtrate Injection
loss
PV
at 79
Tension
Injection
@ PV INJECTED
%
Injected 1/sec dynes/cm Direction,K2
1
2
3
4
5
30.0
2.35
63.6
408.7
2.7
3.6
79.9
5.16
43.9
344.1 7.5 9.7 12.1 12.1 12.9
46.7
2.56
38.3
340.9 2.3
3.2
3.5
50.5
1
6.26
46.6
338.0 2.1
5.4
6.8
79.4
3
85.7
6
88.3
8
69.1
1
3.16
52.5
428.4 3.3
6.2
7.2
83.5
3
85.1
4
87.8
6
27.0
5.31
39.2
391.5 3.6
5.8
6.0
29.9
1.6
58.7
354.0 1.4 1.8
1.9
2.1
4.2
6
4.2
6.5
7.8
8.5
5.9
4.6
OIL BASED MUDS
Syn
521.8
395.7
24.2
2.5
27.0
505.0
1.2 1.4
1.5
1.7
S+TS
430.8
411.6
4.5
3.1
27.0
445.3
2.1 3.4
4.7
5.9
MO
486.0
350.9
27.8
7.2
27.1
475.7
1.1 1.2
1.2
1.3
2.6
2.7
MO+TS
590.7
336.0
43.1
7.84
25.1
593.7
1.2 1.4
1.5
3.2
3.4
3.5
Viscosities and surface tension w ere measured at room temperature
Return
WTCI-96-125, June 1996
3.7
3.9
10.2 11.1
EFICIENCIA del ADITIVO
% Torque Reduction
@80 C en lodos base aceite con
296 psi de carga
40
35
30
3% Lub. Liq.A
5% Lub. Liq. A
3% Lub. Liq.B
5% Lub.Liq.B
1.1% THUSLICK
1.7% THUSLICK
25
20
15
10
5
0
Return
Lubricacion Metal a Roca (Nucleo de Arenisca)
% Reduccion de Torque
COMPARACION EN LUBRICIDAD
Efectos de la Temperatura en los aditivos
% Red. De Torque
60
LODO BASE @20C
LODO BASE @80C
ASFALTINA @20C
ASFALTINA @80C
GILSONITA @20C
GILSONITA @80C
THUSLICK @20C
THUSLICK @80C
50
40
30
20
10
0
Return
Concentration: 6ppb Base Polimerica