Transcript PowerPoint

THE USE OF 3D GEOLOGICAL
INFORMATION IN A LARGE MANAGED
AQUIFER RECHARGE PROJECT
Aki Artimo and Sami Saraperä
Turku Region Water Ltd., Finland
[email protected]
Three-Dimensional Mapping Workshop, Oct. 8th 2011, Minneapolis, MN
INTRODUCTION
Artificially infiltrated groundwater will be
produced for 300,000 inhabitants living in
the Turku area at the end of this year.
The infiltration water is obtained from the
River Kokemäenjoki, 90 km north of
Turku.
Artificial infiltration takes place in the
Virttaankangas Quaternary esker aquifer,
60 km north of Turku.
The length of feeder pipelines (DN=1200
mm) is about 100 km.
The cost of the project is 176,000,000
euros.
BACKGROUND
Precise control of the infiltrated water (i.e. flow paths and residence time in
the aquifer) is important in the operation of the managed aquifer recharge
(MAR) plant.
The aquifer is not used merely to store the infiltrated river water, but also
to enhance the quality of the water.
The natural purification of the infiltrated water during the flow within the
saturated zone of the aquifer is a crucial process for those artificial
recharge plants operating in the Nordic countries.
After its completion, the Virttaankangas managed aquifer recharge project
will significantly increase the number of consumers using artificially
recharged groundwater in Finland.
BACKGROUND
The main factors affecting the quality change of the artificially infiltrated
groundwater are the composition of the soil material, hydraulic
conductivity distribution within the esker aquifer and residence time of the
infiltrated water.
Even though the water quality change occurs beyond the MAR plant’s
facilities, the operation can be controlled with the help of:
- Measurements of hydraulic head changes
- Water quality monitoring data
- 3D hydrogeological model
- Groundwater flow model
- Tracers (natural isotopes, organic carbon and artificial tracers)
TOOLS FOR THE PROJECT EXECUTION
The 3D geological information database has been available during the
construction of the MAR plant.
Automated updating of the 3D hydrogeological and groundwater flow
models has enabled the immediate use of the newest research
information in the construction of the plant.
In addition to basic sedimentological and hydrogeological information, the
Virttaankangas 3D hydrogeological model has seen the introduction of
geochemical, isotopic, and geophysical data into the 3D modeling
workflow.
Furthermore, the 3D hydrogeological model works as a structural basis for
the 60-layer groundwater flow model.
TOOLS FOR THE PROJECT EXECUTION
Quantitative
understanding
GW flow models
Hydrostratigraphical models
Geological models
Database development
Simplified basin analysis approach. Modified from Sharpe et al. 2002
TOOLS FOR THE PROJECT EXECUTION
Quantitative understanding
(Aquifer management)
Hydrogeochemical data
Geophysical data
Isotope data
Drill hole data
GW level
measurements
Tracer tests
3D Groundwater
Flow Model
3D Geological information system
(including time related data)
Infiltrations and
pumpings
Sedimentological
interpretations
Integrated approach with constantly evolving and updating 3D models
provides versatile tools for managed aquifer recharge.
THE USE OF 3D GEOLOGICAL INFORMATION
Geological information and 3D models have been used to solve, for
example, legislative, constructional, and land-use related issues during
the execution of the MAR project.
Modeling tools were used to design the optimal layout and configuration
of the infiltration pond and production well areas of the MAR plant.
For example, locations of five previously planned infiltration areas were
rejected due to discovery of morphologically undetectable kettle hole
system underlying the infiltration areas restricting the flow of infiltrated
water.
Exact locations of the production wells were decided after a thorough
examination of available sedimentological and hydrogeological data,
which resulted in extremely high yields of the new production wells. As
compared with the pre-3D plans for pumping well locations, the amount
of wells needed for full scale production was almost reduced in half.
Avg. pumping rate per well
Previously built wells
New wells
6,700 m3/d
5,000 m3/d
8,500 m3/d
(Maximum yields of the new wells
are higher than the used pumping rates.)
Coarsest part of the esker
THE USE OF 3D GEOLOGICAL INFORMATION
Geological information system with the modeling tools provided the
means to design and control the infiltrations and pumpings related to the
one-year testing phase required in the environmental permits.
According to those permits, the full scale production is only allowed to
start after the results of the testing phase provide enough information of
the controlled execution of full scale infiltration and pumping.
During the one year testing phase the observed flow paths and
residence times of the infiltrated water coincided extremely well with the
groundwater flow simulations conducted prior to the testing phase.
This was not the case when the earlier pre-3D plans for infiltration and
pumping were simulated with the same flow model. Those plans would
have resulted in a failure in the operation of the MAR plant.
THE USE OF 3D GEOLOGICAL INFORMATION
The groundwater flow model is the only tool that can be used to decide
the exact infiltration and pumping rates for all the 19 infiltration ponds
and 12 production wells so that the residence time of the infiltrated water
in the aquifer is sufficient throughout the flow field.
The groundwater flow simulations for full scale production will be
conducted later this month.
Modeling tools, tracer tests and the testing phase have shown that the
influence of the artificial infiltration can only be observed in the coarsest
part of the esker (glaciofluvial coarse unit).
The ”glaciofluvial coarse” unit from the 3D hydrogeological model (left) and
the corresponding gw flow model cells depicting the detailed variation of
hydraulic conductivity within that unit (right).
Flow of infiltrated water (5 days)
Flow of infiltrated water (10 days)
Flow of infiltrated water (5 weeks)
Flow of infiltrated water (10 weeks)
Flow of infiltrated water (15 weeks)
Flow of infiltrated water (26 weeks)
CONCLUSIONS
All the investments in research have been less than
5 M€ (less than 3% of the total budget).
The cost of one production well is about 100,000 €.
Average pumping rate of the MAR plant’s production
well is 6,700 m3/d, whereas the avg. yield of other
water producers’ wells within the same esker area is
500 m3/d.
The required one-year testing phase was
successfully completed before the entire
construction work of the project was completed.
The cost of each day of delay in water production
after the construction is completed is about 20,000 €
due to the loan interests.
The required production rates of the artificially
infiltrated groundwater in this 176 M€ project would
not have been achieved without the 3D geological
information system and models.