Presentation to investor –Lube
crude oil Re refining
Divyang shah (BE Chem.)
MD Aksharconsultant
&
M.syed.
Sharia exports
7/16/2015
1
Project Goals
Ultimate goal of project
 Re-refing of used oil by environment
sound technology
 Process ,machinery requirements
 Relationship to other projects
 High-level timing goals

7/16/2015
2
Ultimate Goal
Sources of Used oil in terms of
market potential
 Selection of process
 Products markets
 Value added from projects
 Its viability
 How to forwards steps in projects

7/16/2015
3
Sources of used oil
Lubricants (engine, turbine,gear)
 Hydraulic oil –fluid
 Metal fluid –cutting,rolling,quenching
 Insulating fluid –transformer,switch
 Thermic fluid

FOR MORE INFO...
List location or contact for specification (or other related
documents) here
7/16/2015
4
Selection of process
Vacuum distillation with clay
 Vacuum distillation with hydro
treating
 Thin film evaporation process
 Any other technology approved by
ministry of environments & forest

FOR MORE INFO...
List location or contact for specification (or other related
documents) here
7/16/2015
5
Why Thin film process among all





Factors for evaluation
Lube yield- fairly high
Utilities consumption-Low
Energy consumption-low
Process –continuous
 Hazardous chemical- None
 Waste strems
 Acid sludge –None
 Spent coagulant clay –none
 Spent alumina clay- 3%
 Process water - Low
7/16/2015
6
Where Vacuum distillation prefer for
Clay and hydro treating

process is recommended For huge capacity
for oil processing
 Weaknesses of the process is Cost of
processing and yield factor is crucial for Low
capacity
 Investments is high compared to Thin film
 Quality is inferior as longtime expose to
FOR MORE INFO...
Temperature
@ low vacuum
7/16/2015
List location or contact for competitive analysis (or other
7
Technology for Used oil/waste oil

New technology being used
– Environmentally Sound in manner that solid,
liquid and gas all effluents are with in desired
limits

Specification for used oil suitable for rerefinning as per schedule -5
– Benefits

Specification for waste oil suitable for
recycle as per schedule -6
7/16/2015
8
Specification for Used oil Nomeschedule-5













Colour- 8 hazen
Water-15%
Density-0.85 to 0.95
Kinetic viscosity at 100 deg c in Cst 1-32
Diultents -15% vol
Neutralization No- 3.5Mg K0H/g
Saponification value-18 mg K0H/g
Total halogens -4000ppm
Polychlorinated biphenyls (PCBS)
Lead- 100ppm
Arsenic - 5 ppm
Cadmium +chromium+nikle- 500ppm
Poly aromatic Hydro carbon – 6%
7/16/2015
9
Specification for waste oil –
schedule -6
Sediment- 5 % max
 Heavy metal- 605 ppm max
 Polyaromatics hydro carbon (PAH)6%MAX
 Total halogens -4000 ppm max
 Polychlorinated biphenyls-below
detection limit

7/16/2015
10
Process steps To Used oil
Pretreatments Of Oil
 Thin film evaporation
 Bleaching of Oil

FOR MORE INFO...
List location or contact for procedures document (or other
related documents) here
7/16/2015
11
Process steps to waste oil
Pretreatments of oil
 Dehydration
 Density –gravity adjustmenst

FOR MORE INFO...
List location or contact for procedures document (or other
related documents) here
7/16/2015
12
Machinery used in Projects
Reactor – and cooing vessel along
with vacuum system
 Thin film evaporator
 Bleacher and filter press
 Cooling tower, Thermic fluid system
 High vacuum system, air compressor
FOR MORE INFO...

separator
centrifuge
ListMechanical
location or contact
for proceduresi.e.
document
(or other

related documents) here
7/16/2015
13
Other Factor also role in projects

State assumptions about resources
allocated to this project
– People
– Equipment- Maintenance and repair
– Locations As Transportion
– Support & outside services
– Manufacturing
– Sales
7/16/2015
14
Projects capacity and Investments
3600 Kl /annum Projects fresh
investments with out land 175 lack
 Time to break even in current sine
Rio looking to optimum gainmaximum 2 and half year
 Return marked By refiner is Rs 2.5
Min/lit
oil process
FOR MOREof
INFO...

List location or contact for procedures document (or other
related documents) here
7/16/2015
15
Relation to Other Projects
Waste oil to process
 Grease production

FOR MORE INFO...
List location or contact for procedures document (or other
related documents) here
7/16/2015
16
Schedule

Review high-level schedule
milestones here
NOC
Ordering
erection
Jan
Feb
Mar
Apr
May
Jun
July
Sep
Oct
Nov
Dec
FOR MORE INFO...
List location or contact for detailed schedule (or other related
documents) here
7/16/2015
17
Current Status Of State Vise
Capacity granted to refiners In India
A.P. 58210 Kl Usedoil, 45320Kl wasteoil
 Assam 2100 usedoil,1720kl waste oil
 Bihar 1155Klusedoil, 2310kl waste oil
 Chitod 9200kl usedoil, 23100Kl
wasteoil
 Goa 11000Kl waste oil
 Gujarat 60036kl used oil, 73060kl
waste oil

7/16/2015
18
Current Status conti







hariyana 44690 Kl Usedoil, 9000Kl wasteoil
Zarkand 16650 usedoil, 1400kl waste oil
Kranataka 28560 klusedoil, 1500kl waste oil
Kerala 17700kl usedoil, 12000Kl wasteoil
M.P 26900 Klusedoil,5000 waste oil
Maharasta 90935 kl used oil,134010kl waste
oil
Pondichary 24000 used oil
7/16/2015
19
Current Status conti
Panjab 15020 Kl Usedoil
 Rajastan 50800 usedoil,52440kl waste
oil
 Tamilnadu 22850klusedoil,15060kl
waste oil
 U.P 80808 Klusedoil,33300 waste oil
 West bengal 10760kl used oil,1500kl
waste oil

7/16/2015
20
India Total used oil Refinecrs and
waste oil recyclers

Used oil Total available for refining in india per
year 5,71,374 Kl

Maximum permissible total capacity per state for
used oil is Mharastra ,U.P.,Gujarat,A.P.Rajastan

Waste oil total available for recycling in india per
year 3,89,930 kl

Maximum permissible total capacity per statefor
waste oil is Mharastra ,Gujarat.,Rajastan ,A.P.
7/16/2015
21
Risk factor involved
Purchasing Power for Raw material
Used oil
 Crude price – Volatility
 Imports of used oil Ban currently if
that vanish then time bounded
Inventory Loss to bare

7/16/2015
22
Conclution

For Small and middle scale investor its cash
market business its best choice for new
entrepreneur as well as Old may have to change
to stand in new global warming senerio
 Never ended products refining and recycling
 Advantage In this projects is inventory
investments is less.
 RM working is engage for month as All RM will
come through auctioned. i.e. 50 % of project cost
7/16/2015
23
Our clients List for used oil/waste oil









M/s Alicid organics industries Ltd Gujarat
M/s Gujarat mobile ,Gujarat
M/s Jain lubricants,Nasik
M/s Tannupetro – A.P.
M/s mahalaxmi oil –Vijaywada,A.P
M/s C.J.Lubricant –Kochin
M/s Divya refinary-M.P.
M/s sampath refinary at –Banglore karnataka
M/s Bashir dost Ahemod. Jeddha
7/16/2015
24
Thank
you