Transcript Document

NAVFAC Atlantic

LEED Conference

LEED and NAVFAC Projects 12 November 2009

5/6/2020

1

2

NAVFAC SW Sustainable Design Team

• •

Don Rashan- PE

Sr. Mechanical Technical Design Coordinator [email protected]

Stephanie Asenbauer- CID, LEED AP

Sustainable Coordinator, In House Design [email protected]

Amy Baquial- LEED AP

• • Sustainable Coordinator, Asset Management [email protected]

Utaw Cuseo-White- LEED AP

Sustainable Coordinator, In House Design [email protected]

Ellis Milano- LEED AP

Sustainable Coordinator, Central IPT [email protected]

David Powell- PE, LEED AP

Sustainable Coordinator, Desert IPT [email protected]

Leeann Wootton- LEED AP

Sustainable Coordinator, Coastal IPT [email protected]

NAVFAC Sustainable Design Program 5/6/2020

Presentation Overview

3

•Navy Sustainable Design Policy •NAVFAC LEED Registered Projects under v2.2

•LEED v3 Implementation •Lessons Learned

NAVFAC Sustainable Design Program 5/6/2020

4

Engineering and Construction Bulletin (ECB) 2008-01

Subject: Energy Policy Act of 2005 Implementation and USGBC LEED Certification Purpose: All FY09 projects and beyond for new buildings and major renovations where the work exceeds 50% of the building’s plant replacement value (PRV) must comply with EPAct 2005, regardless of fund source, building size, location or temporary nature. All projects must be registered and certified by the USGBC to meet LEED Silver-level rating.

Action: Major construction projects have been registered under LEED-NC v2.2 through FY11.

NAVFAC Sustainable Design Program 5/6/2020

Fiscal Year 2009 – MILCON Award Summary

5

FY09 Summary – COMMAND Summary

–TOTAL # OF PROJECTS AWARDED = 61 – TOTAL AWARDED MILCON $$$ = $1.27 B –

Central IPT awarded 42 MILCON projects

• Total value of the FY09 MILCON Program = $1B –

Costal IPT awarded 11 MILCON Projects

• Total value of the FY09 MILCON Program = $170M –

Desert IPT awarded 8 MILCON Projects

• Total value of the FY09 MILCON Program = $100M

LEED Levels of Award:

4 Silver

22 Gold

10 Platinum

2 Sustainable Validation

25 20 15 10 5 0 SILVER GOLD PLATINUM

LEVEL OF LEED

NAVFAC Sustainable Design Program

SUSTAINABLE VALIDATION

5/6/2020

6

Engineering and Construction Bulletin (ECB) 2009-02

Subject: USGBC LEED Project Registration Implementation Purpose: FY09 projects that have been awarded need to be registered under LEED-NC v2.2 by the contractor before 26 June 2009. If not awarded, NAVFAC will register projects in-house. FY10 and FY11 projects will be registered under LEED-NC v2.2 by NAVFAC HQ.

Action : Once awarded, the construction contractor’s LEED AP needs to contact the assigned Sustainable Coordinator to gain access rights to LEED Online. NAVFAC has registered FY09, FY10 and FY11 major construction projects under LEED-NC v2.2

NAVFAC Sustainable Design Program 5/6/2020

USGBC Summary - FY09 MILCON Projects

7

Central IPT:

–40 Projects Registered with USGBC •

Coastal IPT:

–8 Projects Registered with USGBC •

Desert IPT:

–7 Projects Registered with USGBC •

CI Core:

–1 Project Registered with USGBC FY09 Projects Registered w /USGBC 20 15 10 5 0 45 40 35 30 25 Central IPT Central IPT Coastal IPT Desert IPT CI Core Coastal IPT Desert IPT CI Core

NAVFAC Sustainable Design Program 5/6/2020

USGBC Summary - FY10 MILCON Projects

8

Central IPT:

–19 Projects Registered with USGBC •

Coastal IPT:

–1 Projects Registered with USGBC •

Desert IPT:

–3 Projects Registered with USGBC FY10 Projects Registered w /USGBC Central IPT Coastal IPT Desert IPT 20 18 16 14 12 10 8 6 4 2 0 Central IPT Coastal IPT Desert IPT

NAVFAC Sustainable Design Program 5/6/2020

USGBC Summary - FY11 MILCON Projects

9

Central IPT:

–11 Projects Registered with USGBC •

Coastal IPT:

–2 Projects Registered with USGBC •

Desert IPT:

–3 Projects Registered with USGBC FY11 Projects Registered w /USGBC Central IPT Coastal IPT Desert IPT 12 10 8 6 4 2 0 Central IPT Coastal IPT Desert IPT

NAVFAC Sustainable Design Program 5/6/2020

10

MCAS Miramar Clubhouse

• 16,000 SF New Construction • Water efficient landscaping. Reclaimed water used for irrigation except on the putting greens. • Over 20% of materials selected for construction are recycled, reducing the need for new materials to be harvested. • Low emitting materials were used to reduce the indoor air contaminants and therefore improving indoor air quality. • Project Cost $6,617,100

“Gold”

NAVFAC Sustainable Design Program 5/6/2020

11

P608 PHYSICAL FITNESS CENTER, CAMP PENDLETON, CA

• 24,000 SF Fitness Center • Water efficient landscaping. No potable water used. • Storm water design quality control. • On Site renewable energy. Photovoltaic system put in place reducing the energy demand by 2.5%. • Submitted Construction Submittal to USGBC – Anticipated Silver Certification • Project Cost $8,510,000

“Silver”

NAVFAC Sustainable Design Program 5/6/2020

12

C-17 TWO BAY HANGAR 2009 Travis AFB, CA

• 106,006 SF Hangar • 19.7% reduction in energy usage over ASHRAE 90.1

• 38.5% reduction in water usage • Over 75% construction waste diverted from landfill • Construction Cost $46,000,000 • Sust. Cost $100,000 = .2% of Const Cost • “Ribbon Cutting” Ceremony and LEED Silver Certification to be held December 2009.

“Silver”

NAVFAC Sustainable Design Program 5/6/2020

13

MULTI-BATTALION OPERATIONS CENTER FY08 TWENTY-NINE PALMS, CA

• 59,806 SF Educational/Admin Bldg • 31.5% reduction in energy usage over ASHRAE 90.1

• 50% reduction in water usage • Over 75% construction waste diverted from landfill • Construction Cost $20,800,000 • BOD: 10/19/2010

“Gold”

NAVFAC Sustainable Design Program 5/6/2020

14

Interim Technical Guidance CI-09-02

• Subject: Interim Guidance for LEED Sustainable Validation Project • Purpose: Projects that do not fit the definition of the LEED rating system and cannot achieve LEED Silver will not be certified.

• Action: Implement as many sustainable features as possible. The contractor needs to provide a LEED checklist of LEED points obtained and a letter stating why LEED silver cannot be met. The Sustainable Coordinator on the team will forward the information to LANT for record.

NAVFAC Sustainable Design Program 5/6/2020

15

LEED v3 and NAVFAC Projects

•FY09, FY10 and FY11 new buildings and major renovations that were not registered under v2.2 that need to be LEED certified will need to be registered by the construction contractor under v3.

•Current projects registered under v2.2 can be changed to v3 by the construction contractor until the deadline, but any additional cost and time will be at the contractor’s expense.

•FY12 projects will be registered by the construction contractor under v3. NAVFAC Request For Proposals will reflect the change.

5/6/2020 NAVFAC Sustainable Design Program