ZONE 18 CRYOGENICS
M. Sanmarti
On behalf of AT-ACR-OP section
Outline
• What is the Cryo in Zone 18
• Who is the Cryo in Zone 18
• Cryo Zone 18 and TCR links
• Recovery and performances
• Conclusions
What is the Cryo in Zone 18
• Production:
– Refrigerators
• 18 kW @ 4.5K Air Liquide (PM18)
• 6 kW @ 4.5K Linde (SM18)
– Infrastructure: recovery and purification
• Clients:
– “Cryo” clients:
•
•
•
•
LHC Magnets test benches (ACR-MT section)
LHC Cold compressors units BA7 (ACR-PI section)
String2
High Temperature Current Leads (ACR-IC section)
– “Non-Cryo” clients: RF modules & cavities, GreC
• Utilities
– Electricity, Cooling Water, Compressed Air, Controls
What is the Cryo in Zone 18
CP
precooling
WPU2
String
Test
station
HTS
RECOVERY LINE
Warm
returns
Heater
CP's Recup
3x100m³/h
WPU1
Magnets
Warm
returns
6kW Linde
Ballons
Magnets
test
bench
Clients
STRING
POL
18g/s
RF
Cryostat
Module
25.000 l
Dewar
Valve Box
HP Purificator
2x200m³/h
6kW
Helium
Tanks
Heater
18kW Air
Liquide
18kW
Helium
Tanks
Test Bench
CCU, CB
1.8 K
Refrigerators
PM18-Air Liquide 18 kW @
4.5K
• Compressor station
– 5 He compressors (1600 g/s, 4.2
MW)
– Oil system (5 oil pumps)
– Cleaning helium system
• Cold Box
– Vacuum vessel
– 8 Turbines, heat exchangers
– 1 Nitrogen Precooler (80K)
• Controls(ABB):1100 I/O
• Connected to the Dewar
SM18-Linde 6 kW @ 4.5K
• Compressor station
– 3 He compressors (350 g/s, 1.5
MW)
– Cleaning helium system
• Cold Box
– Vacuum vessel
– 6 Turbines, heat exchangers
– 1 Nitrogen Precooler (80K)
• Controls (ABB): 800 I/O
• String2/back up
Infrastructure
(750 Input/Output)
Helium storage
LN2 supply
•
•
•
•
•
9 helium tanks of 80 m3 each, dedicated to the
6kW Linde cryoplant for GHe storage
12 helium tanks of 250m3 each, dedicated to the
18 kW Air Liquide cryoplant, for GHe storage
A 25000 liters dewar for LHe storage
A mobile 10000 liters dewar for LHe storage
•
•
1 dewar of 50000 liters dedicated to the 6kW
Linde cryoplant and the HP purification system
(+ infrastructure SM18)
1 dewar of 50000 liters dedicated to the magnet
test benches
2 dewars of 50000 liters dedicated to the 18kW
Air Liquide cryoplant and BA7.
• All warm return gases (pure) can be sent either to the 18kW Air Liquide plant or to the 6kW Linde
plant.
• The return gases are analysed for impurities (air/humidity) and can be sent to the balloons if
necessary (not all return gases – flow too high)
HP Purification system:
• 5 balloons of 80 Nm3, total capacity of 400 Nm3
• 3 Burckhart compressors with 100 Nm3/h at 200 bar each
• 2 HP purificators of 200 Nm3/h at 200 bar each
LP Purification system:
18 g/s on-line purification system (freeze-out) at the outlet of the warm pumping unit
Clients




The magnet test benches (Dewar-PM18)
The RF-cavities and modules (Dewar-PM18)
The 1.8K Cold Compressor Unit – test facility at BA7 (PM18)
STRING2 (a full-size model of a regular cell of an LHC arc)
(Linde)
 A test station for testing High Temperature current leads 600A and
13kA (Dewar-PM18)
 The GREC experiment, Grands Reynolds Cryogéniques (Linde)
The clients take Liquid Helium from the 25000 liters dewar at 4.5K and send back
pure gaseous helium - cold or warm - to the low pressure side of the compressors of the cryoplant
(18kW/6kW)
or impure to the balloons.
The client can decrease the temperature to 1.8K by pumping on the helium bath.
A refrigeration capacity of 360W @ 1.8K is available via a warm pumping group in series with a onestage Cold Compressor Unit.
The outlet of the pumping group passes an « on line low pressure purification system » and is sent back
to the low pressure side of the compressors.
Utilities needed for Cryogenics
• Electricity:
–
–
–
–
3.3kV
400V
24V
24V
Powering of main compressors
Powering of heaters, pumps,...
Instrumentation (relays, 500 mA)
Control System & monitoring (4 –20 mA)
• Water:
– Cooling of compressor station (motors, helium, oil), turbines, vacuum pumps...
• Compressed Air:
– Valves actuators
• Controls :
– Networks
– fieldbuses, PLC, SCADA
Courtesy L. Tavian
Utilities for Cryogenics in SM18
 Electric power
 Cooling and ventilation
about 7 MW
Water Cooling towers
About 11,5 MW (1000 m³/h)
 Helium and nitrogen
Compressed air
- LN2: 2/4 trucks per week (2003)
nominal 2/3) trucks per day
- LHe: ~60000 liters per years (02-07)
 Controls:
CRYO
Networks, fieldbuses,
PLC, SCADA
Who is the Cryo in Zone 18
CERN OPERATION ACR
ACR/OP - L. SERIO
ACR/PI
S. CLAUDET
ACR/MT
B. VULLIERME
ALLS OPERATIONS ACR
H. BERG
ZONE 18
W3
LHC POINTS
W6
CCU / BA7
W4
CRYOMAGNETS
W5
ZONE 18
W3
LHC POINTS
W6
CCU / BA7
W4
CRYOMAGNETS
W5
C. CALZAS
D. CHANAT
G. FERLIN
J. AXENSALVA
M. CHARVIN
B. BARRIA
Pt 6
G. VINCENT
C. ROBIN
L. HERBLIN
JC. DE SOUSA
S. MASSON
Pt 8
Y. COLLOMBET
S. KNOOPS
JP. LAMBOY
S. AMOMO
A. EYCHENNE
F. ANTONIOTTI
M. SANMARTI
A. TOVAR
E.MILLET
N. BALIN
N. NAVIONMAILLOT
V.SOUTOGOMES
R. BECK
G. EVRARD
G. FISCHER
V. LAVELLE
L. MOURIER
N. QAZI
J.C. ROGEL
N. ZELKO
Who is the Cryo in Zone 18
ACR-OP
L. Serio
ACR-PI
S. Claudet
CCU tests
S. Claudet
G. Ferlin
WP 4
JR
zone 18
18 kW, infra, cavities
Operation Team
ALLS
cryoplants zone 18
ACR-MT
B. Vullierme
zone 18
6 kW, String 2
LHC points
LHC Cryo systems
Commissioning
Operation Team
ALLS
cryoplants zone 18
Operation Team
ALLS/CERN
Cryoplants LHC
Test Bench SM18
Operation
Team ALLS
Test Benches
Who is the Cryo in Zone 18
MAINTENANCE
F. BARACCO
OPERATIONS ACR
H. BERG
VIDE
MECANIQUE
ELEC. & INSTRUM.
SUPPORT
TECHNIQUE
ZONE 18
W3
LHC POINTS
W6
CCU / BA7
W4
CRYOMAGNETS
W5
J. MORENO
J. BOUTTAZ
J. KASPRZYCKI
D. JOUVE
M. CHARVIN
B. BARRIA
Pt 6
G. VINCENT
C. ROBIN
G. CLERC
S. CALLEJA
C. MIZRAHI
JC. DE SOUSA
S. MASSON
Pt 8
L. MURAT
B. DEFINOD
S. AMOMO
A. EYCHENNE
F. ANTONIOTTI
E.MILLET
N. BALIN
N. NAVIONMAILLOT
V.SOUTOGOMES
R. BECK
G. EVRARD
G. FISCHER
V. LAVELLE
L. MOURIER
N. QAZI
J.C. ROGEL
N. ZELKO
Who is the Cryo in Zone 18
• ACR-OP: production, infrastructures and String2
– CERN: C. Calzas, D. Chanat, Y. Collombet, S. Knoops, M.
Sanmarti and L. Serio**
– ALLS: H. Berg**, M. Charvin, A. Eychenne, E. Millet*,
N. Navion-Maillot, JC de Sousa*, V. Souto-Gomes.
Normal operation and piquet service (CERN/ALLS)
• ACR-MT: LHC magnets tests bench
– CERN: J. Axensalva, L. Herblin, JP Lamboy, A. Tovar, B.
Vuillerme**
– ALLS: 3x8 shifts (1 STL, 3 TL, 8 operators)
24 hours operation from control room (ALLS)
Cryo and TCR links
OPERATION
OPERATION
OPERATION
OPERATION
SM 18-LHC-REFRIG
SM18 - LHC - STRING
SM18 - LHC - HTS
SM18- LHC - AIMANTS
CRYO_COLDBOX_ 6KW
CRYO REFRIGERATEUR
CRYO_STRING_LHC
TEST_HTS_LHC
CRYO_GENERAL_PRE
(CRYO-7)
(LHC 4.5K_Refrig. )
(CRYO14)
(CRYO)
(TEST_LHC_MAGNET)
not in service
|
Responsable
L. Serio
Responsable
Responsable
Natel : 160130
Natel :
TEST_LHC_AIMANTS
B. Vullierme 75477
Natel : 160775
|
|
|
|
Responsables technique
Responsables technique
Piquet CERN
Natel : 16 47 60
Natel :
|
|
Salle de contrôle cryo
B. 2173 SM18
Tel.78016/78210/78211
|
|
Salle de contrôle String
B. 2173 SM18
Tel.79557/79558/79559
Salle de contrôle
|
|
|
not in service
Voir les consignes
classeur piquet
|
|
|
GSM 0-079 201 0125
at CERN 16 0125
Voir consignes classeur piquet
Natel : 16 03 54
Cryo and TCR links
Defaut Liste Cryogénie SM18 CRYO
SUBSYS
MEMBER
MNEM
BUILDING
DESCRIPTION
CRYO_COLDBOX_6KW
CRYO-7
SM18
2173
DEFAUT CRYO BF 6KW
ANS, APRES 15 MIN. SANS CONFIRMATION
GSM 0-79 201 01 25
at CERN 16 01 25
Si non reponse ingenieur support ALLS (voir planning)
Si non reponse piquet CERN (GSM 16 47 60)
Salle de contrôle
B. 2173 SM18
Tel.78016
voir consigne classeur piquet
Piquet :
Default CRYO REFRIGERATEUR 4.5K PM18
SUBSYS
MEMBER
MNEM
CRYO REFRIG
LHC 4.5K_REFRIG
SD18
BUILDING
DESCRIPTION
DEFAUT CRYO REFRIG.R 4.5 K PM18
ANS, APRES 15 MIN. SANS CONFIRMATION
GSM 0-79 201 0125
at CERN 16 01 25
Si non reponse ingenieur support ALLS (voir planning)
Si non reponse piquet CERN (GSM 16 47 60)
Salle de contrôle STRING
B. 2173 SM18
Tel.79557
voir consigne classeur piquet
Piquet :
Defaut Liste SM18-LHC-STRING
SUBSYS
MEMBER
MNEM
BUILDING
DESCRIPTION
CRYO_STRING_LHC
CRYO-14
SM18
2173
DEFAUT CRYO STRING LHC
ANS, APRES 15 MIN. SANS CONFIRMATION
GSM 0-79 201 0125
at CERN 16 01 25
Si non reponse ingenieur support ALLS (voir planning)
Si non reponse piquet CERN (GSM 16 47 60)
Salle de contrôle STRING
B. 2173 SM18
Tel.79557
voir consigne classeur piquet
Piquet :
Defaut Liste Cryogénie SM18-LHC HTS
SUBSYS
MEMBER
MNEM
BUILDING
TEST_HTS_LHC
CRYO
SM18
2173
********NOT IN SERVICE*******
DESCRIPTION
DEFAUT CRYO HTS
Not in service
Piquet :
Defaut Liste Cryogénie SM18-LHC-AIMANTS
SUBSYS
MEMBER
MNEM
BUILDING
DESCRIPTION
CRYO_GENERAL_PRE
TEST_LHC_AIMANTS
SM18
2173
DEFAUT CRYO AIMANTS LHC
ANS, APRES 15 MIN. SANS CONFIRMATION
voir consigne classeur piquet
Piquet :
GSM 0-79 201 03 54
at CERN 16 03 54
Planning ZONE18 Cryo operation 2003
ALLS
CERN
Date debut
Week
piquet
24-01-03
31-01-03
07-02-03
14-02-03
21-02-03
28-02-03
07-03-03
SK
DC
LS
MS
CC
NNM
BB
7
5
SM
VSG MCh
7
7
6
AEY
7
7
7
7
7
8
7
9
7
v
7
7
10
11
7
7
7
Téléphones:
Opérateurs ALLS:
nom
init.
tel.
De Sousa
JCdS
78469
Millet
EM
78211
Barria
BB
78205
0450414477
Charvin
MCh
78211
0613137336
Masson
SM
78211
Eychenne
AE
Navion-Maillot NNM
78211
78469
Souto-Gomez
VSG
78211
init.
tel.
GSM
163673
dom icile
0450389398
En cas de non-reponse de l'operateur
après 15 min. il faut contacter:
0450409048
0620635608
0603169416
0450565774
Appeler Operateur ALLS
Si non-joignable:
160125
appeler Ingénieur de soutien ALLS
160683
Si non-joignable:
appeler piquet CERN
164760
Soutien CERN:
nom
CC
DC
Knoops
SK
Sanmarti
MS
Serio
5 Juin 2003 LS
GSM
dom icile
Calzas
74098
164464
022/ 3407930
Chanat
75676
160777
0450283722
76296
160721
0450418178
74058
163835
0450991676
74669
160130
022/ 7869772
Ing. ALLS SM18:
nom
Berg Hilmar
init.
HB
dom icile
022/7822949
File on webpage of our section:
http://lhc-div-acr-op.web.cern.ch/lhc-div-acr-op/
16
Link: Piquet
Performance in 2002
PM18
Total hours of liquid helium production in 2002
Performance in %
6470
Linde
5150
98.94%
String at 1.9K
4170
97.38%
92.63%
Utilities-stop (electricity, water, compressed air)
For String: coldbox stop = utiliy-stop (watercut –
impurities)
29h30
0.46%
33h36
0.65%
25h48
174h21
0.62%
4.18%
Cryogenic operation failures – tuning of new cryoplant
For String: problems with pumpinggroup
36h30
0.56%
33h18
0.65%
6h05
59h15
0.15%
1.42%
2h38
0.04%
1h25
0.03%
30h45
11h15
0.74%
0.27%
411h50
30h50
9.8%
0.74%
Automate/program – failures
For String: other causes (HTS – Kickertests)
Quench-recuperation
Total hours of recuperation (<24h)
Total hours >24h recuperation
0h
0h
Accumulation of impurities - big quantities of impurities:
total regeneration of cold box
- Without redundancy Linde
- With redundancy Linde
0h
66h30
Liquid helium deliveries (4 deliveries of maximum 8
hours) (If reduction LHe distribution)
0h
0h
1.29%
0h
For PM18: only taken into account distribution to clients in SM18 for 2002, with buffer of 25000 litres dewar. For 2003,
also taking into account BA7, without buffer … if level in phaseseparator of cryoplant decreases below 30%, productionstop for BA7.
Non Conformity Report ALLS - summary
Coldbox 6kW Linde:
STRING:
20 Beeps:
5 utility-cuts resulting in production-stop
18 Beeps:
12 for HTS OFF
6 due to problems STRING (e.g. errors in control)
-> none of them in Bonus-Malus-file as they were
not resulting in a production-fault for STRING
For example: powercut with as consequence
blow-up of several balloons
1 cryogenic problem resulting in a production-stop
4 cryogenic problems in planified period (cooling
down or warming up of STRING)
4 due to cold coming from STRING (turbines
stopped)
2 due to pure gas storage (MP) too high
1 due to pure gas storage (MP) too low
3 due to stop of CP2 only (no production stop)
Bonus-Malus-file:
5 utility-cuts;
1 cryogenic problem with beep
5 cryogenic problems without beep (during
working hours)
For example: Turbine 4 broken
Bonus-Malus -file:
Total number of quenches provoked: 17
Total number of stops: 13
utility: 9
controls STRING: 1
Test Kickers: 2
HTS off without BEEP: 1
Helium Zone 18 - 2002
Total LHe livré au SM18:
9655 kg
8000
Perte moyenne par jour
au SM18: 20 kg
(0.4% sur stock moyenne; 20*30d*9m=5400kg)
Stock moyenne au SM18: 4719 kg
03.04.02
Livraison de 2200Kg
05.06.02
Livraison de 3700 Kg
10.07.02
Livraison de 2325Kg
200
03.09.02
Livraison de 2950Kg
180
7000
10000 l envoyé au cryolab
+ 200 kg au ZN
6000
Envoi de 300 kg
au cryolab + perte
de 50 kg (arret P18)
Perte moyenne de
50 kg/jour
170 kg envoyé au ZN
100
700 kg envoyé au cryolab
80
3000
Perte moyenne de
40 kg/jour
140
120
250 kg envoyé
au zone nord
4000
Perte moyenne de
25 kg/jour
60
2000
Perte de 300 kg:
Test HTS (CFB)
1000
40
20
Livraison de 1000 kg
venant du cryolab
Quantité d'Helium total
Perte moyenne par jour (kg)
Purification Helium (kg/jour)
05
.1
2.
02
07
.1
1.
02
12
.1
0.
02
14
.0
9.
02
19
.0
8.
02
19
.0
7.
02
21
.0
6.
02
23
.0
5.
02
0
23
.0
4.
02
0
13
.0
3.
02
Kg
5000
160
Conclusions (??)
• http://lhc-div-acr-op.web.cern.ch/lhc-divacr-op/default.htm
Salle des machines
Boite froide
Boite froide
General layout of the zone 18
SH18
CP's 6kW
Linde
WPU1
CP's
Recup
SW18
Ballons
Infra
Helium
Tanks
18kW
Helium
Tanks
6kW
WPU2
Frigos
BA7
CP
Preccoling
Test Bench
CCU, CB
1.8K
SM18
STRING
SD18
CCU1
CCU2
Test Station
Current Leads
Magnets test bench
CB
[email protected]
AL
SHM18
CB 6kW Linde
CP
[email protected] AL
HP
Purificator
25000 l
Dewar
Warm part of
CB 1.8K
10000 l
Dewar
POL
Cryostats
LN2
Dewars
Modules
LN2
Some figures of zone 18
- Magnets:
LHe: 60 g/s (120 g/s)
GHe: 35 g/s (120 g/s)
- Cryostats/Modules:
10-15 g/s intermittent
- BA7:
40-45 g/s equiv. liq.
(130 g/s)
- String:
Lhe: 6-10 g/s norm. op
30 g/s transients
WPU2
String
Test
station
HTS
POL
18g/s
RF
Cryostat
Module
Magnets
test
bench
Warm
returns
Heater
CP's Recup
3x100m³/h
WPU1
Magnets
Warm
returns
6kW Linde
Ballons
CP
precooling
Clients
STRING
RECOVERY LINE
- Available LHe:
6 kW Linde: 16-30 g/s
18kW AL: 150-250 g/s
(SM18 + BA7)
-Transfer Line SD-SM:
LHe: 60 g/s (120 g/s)
GHe: 60 g/s @ 80K
(90 g/s @ 50K)
- Consumption:
Cryogenic fluids-consumption:
•2/4 trucks per week and
later on 2/3 trucks per day of LN2
•About 60000 litres of LHe per year
During the coming 5 years
25.000 l
Dewar
Valve Box
HP Purificator
2x200m³/h
6kW
Helium
Tanks
Heater
18kW Air
Liquide
18kW
Helium
Tanks
Test Bench
CCU, CB
1.8 K
Dewar and connections to clients
Dewar and connections to clients