ASHRAE SP-102 Advanced Energy Design Guide: Small Office
Download
Report
Transcript ASHRAE SP-102 Advanced Energy Design Guide: Small Office
What’s in the New Advanced Energy
Design Guide for Small Office
Buildings, and How Did We Get There?
Ronald E. Jarnagin
SP-102 Chairman
Pacific Northwest National Laboratory
[email protected]
What’s In the New AEDG?
Document Outline
Climate Zones
Format of Recommendation Tables
Fenestration Recommendations
Lighting Recommendations
HVAC Equipment and System
Recommendations
Example Building Designs
How-To Guidance
February 7, 2005
ASHRAE Winter Meeting, Orlando,
Fla.
2
AEDG Document Outline
Introduction
Integrated design process to achieve
energy savings
Recommendations by climate zone
including example building designs
How-to guidance for implementing
recommendations
February 7, 2005
ASHRAE Winter Meeting, Orlando,
Fla.
3
New Code Climate Zone Map Used
New Code Climate Map Used
February 7, 2005
ASHRAE Winter Meeting, Orlando,
Fla.
4
Recommendations by Climate Zone
Energy-saving
recommendations for
each climate zone
contained on single page
Helps achieve energy
savings without costly
calculations or analysis
Addresses building
envelope, lighting, HVAC
equipment, systems and
service water heating
February 7, 2005
ASHRAE Winter Meeting, Orlando,
Fla.
5
Format of Recommendations
Climate Zone 1 Recommendation Table for Opaque Envelope
Component
Recommendation
Notes and Details
Item
Roof
Insulation Entirely Above Deck
R-15 ci
EN1-2, 17, 20-21
Metal Building
R-19
EN1, 3, 17, 20-21
Attic and Other
R-30
EN4, 17-18, 20-21
Single Rafter
R-30
EN5, 17, 20-21
Surface reflectance/emittance
Walls
Mass
Slabs
EN6, 17, 20-21
Metal Building
R-13
EN7, 17, 20-21
Steel Framed
R-13
EN8, 17, 20-21
Wood Framed and Other
R-13
EN9, 17, 20-21
No recommendation
EN10, 17, 20-21
R-4.2 ci
EN11, 17, 20-21
Steel Framed
R-19
EN12, 17, 20-21
Wood Framed and Other
R-19
EN12, 17, 20-21
No recommendation
EN13, 17, 19-21
R-7.5 for 12 in.
EN14, 17, 19-21
Mass
Unheated
Heated
Doors
February 7, 2005
EN1
No recommendation
Below Grade Walls
Floors
0.65 initial/0.86
Swinging
U-0.70
EN15, 20-21
Non-Swinging
U-1.45
EN16, 20-21
ASHRAE Winter Meeting, Orlando,
Fla.
6
AEDG Recommendations for
Fenestration
Window-to-wall ratio (WWR) limited
to 40%
Recommendations on window
orientation
Exterior sun control
Maximum skylight area of 3%
February 7, 2005
ASHRAE Winter Meeting, Orlando,
Fla.
7
AEDG Recommendations for
Lighting
Lighting power density of 0.9 W/ft2
Source efficiency of 90 mean
lumens/watt
Electronic ballasts
Daylight controls for WWR >25%
within 12 feet of N/S window wall, 8
feet of skylight edge
Occupancy sensors
Minimum surface reflectances
February 7, 2005
ASHRAE Winter Meeting, Orlando,
Fla.
8
AEDG Recommendations for HVAC
Equipment and Systems
Higher efficiency unitary equipment –
varies with climate zone
Motorized outside air damper control
Economizers needed down to 4.5 tons
Demand Controled Ventilation
Lower duct friction rate
No exterior ductwork
February 7, 2005
ASHRAE Winter Meeting, Orlando,
Fla.
9
Example Building Designs
Features examples of
advanced building
energy designs
Demonstrates
flexibility offered in
achieving advanced
energy savings levels
Selected from award
winning designs by
architects
February 7, 2005
ASHRAE Winter Meeting, Orlando,
Fla.
10
“How-to” Guidance - Envelope
Figure EN-2
February 7, 2005
Figure EN-3
ASHRAE Winter Meeting, Orlando,
Fla.
11
“How-to” Guidance - Lighting
Figure EN-4
February 7, 2005
ASHRAE Winter Meeting, Orlando,
Fla.
12
How Did We Get There?
Meeting Schedule
Phases of the Project
Peer Reviews
Development Challenges/Issues
The Results
February 7, 2005
ASHRAE Winter Meeting, Orlando,
Fla.
13
SP-102 Meeting Schedule
Chairman given a year to complete
project
11 Meetings/conference calls
First organizational meeting October
1, 2003
Last conference call to approve
document May ,2004
February 7, 2005
ASHRAE Winter Meeting, Orlando,
Fla.
14
Phases of SP-102 Project
Groping and sniffing (Toy Store
Exercise)
Scoping study to assess potential
Bonding
Initial drafting and layout
Refinement of technical
recommendations
Final document preparation and
assessment
February 7, 2005
ASHRAE Winter Meeting, Orlando,
Fla.
15
Peer Reviews
Peer reviews provided primarily by
committees/individuals from
participating organizations
Around 100 reviewers actively
participated
Concept review stage (50%)
Technical refinement review stage
(80%)
Final review stage (100%)
February 7, 2005
ASHRAE Winter Meeting, Orlando,
Fla.
16
Committee Chairman’s Sidebar on
Schedules
Make sure you really understand what
the timeline is for your project (get it
down in writing)
Ask for a definition of the key terms,
like “what does a year mean?”
Learn to appreciate the wisdom of
President Clinton’s famous question in
the middle of the Lewinsky affair,
“define sex?”
February 7, 2005
ASHRAE Winter Meeting, Orlando,
Fla.
17
Development Challenges/Issues
Keeping everyone focused through 11
meetings during the year
Plug loads – in or out?
Keeping criteria on single page
Keeping document within page limit
Keeping this “simple”
Possible problems reaching 30% savings
consistently in all locations
Trying to work with very different styles
Keeping all constituencies informed
February 7, 2005
ASHRAE Winter Meeting, Orlando,
Fla.
18
Did We Do It? You Bet!
Next up in the 30% series
are retail and highway
lodging
Working on plans for 50%
and 70% series guides
Expanded ASHRAE
involvement in LEED
programs is underway
Guide on sale at 2005
Winter Meeting in Orlando
February 7, 2005
ASHRAE Winter Meeting, Orlando,
Fla.
19
Why Should You Care About This?
Concerns over energy
and sustainability will
drive future building
decisions.
As an HVAC&R
professional you will
need the tools to
remain competitive
and help your clients
make informed, cost
effective decisions.
This Guide will be one
of those tools.
February 7, 2005
ASHRAE Winter Meeting, Orlando,
Fla.
20
Now, Surely You Must Have a
Question or Two…..
February 7, 2005
ASHRAE Winter Meeting, Orlando,
Fla.
21