Transcript Slide 1
GRS Global Reliability System Refining Congress - Argentina D.E. Fitzgerald 1 EXXONMOBIL GLOBAL RELIABILITY SYSTEM GRS Agenda • System Overview • Q&A Objectives –Review ExxonMobil’s Global Reliability System in sufficient detail to provide an understanding of how the system achieves •Improved facility reliability •Improved maintenance effectiveness 2 GRS - BACKGROUND GRS GRS supersedes and replaces earlier ExxonMobil systems which date from the mid 90’s GRS is a Global Common System, a common framework for Reliability Improvement • Facilitates Identification and Accelerated Application of Global Best Practices The System has requirements, supported by practices; benefits are obtained from the Practices, the “how to’s” 3 Global Refinery Maintenance Costs 1996 - 2002 4 GRS GRS Reliability & Maintenance Results 5 GRS – Intranet Web-based Manual Contents GRS Table of Contents Introduction Element 1 Element 2 Element 3 Element 4 Element 5 Element 6 6A 6B 6C 6D 6E 6F 6G 6H 6I 6J Element 7 Element 8 Element 9 Element 10 Element 11 Appendix 1 Global Reliability System ELEMENT Management Leadership, Commitment & Accountability Risk Assessment & Management Facilities Design& Construction Process & Facilities Information and Documentation Personnel and Training Operations and Maintenance Site Plans and Objectives Operating Envelope Equipment Strategy Work Selection Routine Work Planning, Scheduling and Execution Turnaround/Shutdown Work Planning, Scheduling, and Execution Loss Monitoring and Response Operator Care Abnormal & Non-Routine Operations Performance Improvement Management of Change Third Party Services Incident Investigation & Analysis Community Awareness and Emergency Response Global Reliability System Assessment and Improvement Glossary Purpose Expected Results Requirements Key Measurements Linkages Inputs & Outputs Practices and Examples Overview (Optional) Practices White Papers Process Summaries Detailed Examples 6 System Simplified Flow Plan 6H Operator Care 6B Operating Envelope Objectives and Strategies 6A Site Plans & Objectives 3 Facilities Design and Construction 7 Management of Change 6C Equipment Strategy 6E Routine Work Planning, Scheduling & Execution 11 GRS Assessment and Improvement 6J Performance Improvement 4 Process & Facilities Info & Documentation 5 Personnel and Training 8 Third Party Services 6G Loss Monitoring and Response 6I Abnormal andEffective Non-Routine Operations Planning, Scheduling and Execution 6D Work Selection Improve OIMS and Supporting Elements Execute 2 Risk Assessment and Management 1 Proactive Management Leadership Leadership, Plans, GRS 10 Community Awareness 7 6F TA/Shutdown Planning, Scheduling & Execution Analyze 9 Reactive Incident Investigation and Analysis Denotes Out of Program Work GRS OVERVIEW GRS GRS drives the following key concepts . . . PROACTIVELY DEFINE CAPABILITY and NEEDS of the process and equipment based upon criticality ANALYZE LOSSES to drive continuous improvement OPERATE WITHIN CAPABILITY of process and equipment Stable Unit Reliable Equipment Design it Right Operate it Right • Operate within defined • Equipment envelopes design supports • Structured rounds to high reliability monitor & care for • Changes managed equipment • Equipment maintenance • Planned response to needs and operating unit upset or nonenvelopes defined routine operation • Training and procedures • Monitor losses daily provided to Operations against set targets, and Maintenance identify cause, take corrective action • EFFICIENTLY and EFFECTIVELY PROVIDE NEEDS of Fix it equipment and Right process Complete 100% of Annual Plan • All work planned and scheduled • Job Packs developed and used • Correct spare parts and tools available • Repairs completed right first time and on schedule • Repairs documented RELIABILITY MINDSET SKILLED WORKFORCE EFFECTIVE LEADERSHIP 8 GRS OVERVIEW GRS In order to achieve this RELIABILITY, DEFINE the CAPABILITY of the process and equipment Operating Envelopes (6B) Equipment Strategies (6C) Ensure that we OPERATE WITHIN THAT CAPABILITY Operator Care (6H) Abnormal and Non-Routine Operation (6I) To be COMPETITIVE, OPTIMIZE support effort consistent with the potential loss and probability of that loss Work Selection (6D) Annual Planning (6A) Planning, Scheduling and Execution (6E/F) 9 GRS ELEMENT 1 - LEADERSHIP Expected Results: Sustainable reliability, availability and manufacturing (maintenance and operations) cost performance that is consistent with Business objectives An organization that understands and is working to achieve the site's reliability, availability, and manufacturing cost objectives Leadership and commitment that is demonstrated through management behavior and visible actions 10 GRS Key Linkages (6C) 6C Equipment Strategies PM scope & frequency Critical Operating Scenarios Monitoring tasks based on criticality Critical Equipment 6B Operating Envelopes Operating Envelopes for Process Critical Parameters 6H Operator Care Effective/efficient field rounds & console monitoring 6A Site Plans and Objectives Breakdown / Discretionary Work 6D Work Selection 1 Year Plan Latest Acceptable Completion 6I Abnormal & Nonroutine Operations Effective response to minimize loss 11 6E Routine Work P/S/E 6F Turnaround P/S/E Effective, efficient unit maintenance GRS OVERVIEW GRS Element 6C - Key Requirements • Equipment Strategy practices defined for each equipment type: - fixed equipment - instruments - machinery - analyzers - electrical -infrastructure • Strategy defines the interventions necessary to protect the reliability of the equipment • predictive and preventive maintenance • operator monitoring tasks • design improvements • job packs and spare parts • Strategies are living documents - continuously improved and updated with • changes in operating context • learnings from repairs and failures 12 GRS Key Linkages (6B) 6C Equipment Strategies PM scope & frequency Critical Operating Scenarios Monitoring tasks based on criticality Critical Equipment 6B Operating Envelopes Operating Envelopes for Process Critical Parameters 6H Operator Care Effective/efficient field rounds & console monitoring 6A Site Plans and Objectives Breakdown / Discretionary Work 6D Work Selection 1 Year Plan Latest Acceptable Completion Date based SDD’s 6I Abnormal & Nonroutine Operations 6E Routine Work P/S/E 6F Turnaround P/S/E Effective response to minimize loss 13 Effective, efficient unit maintenance GRS OPERATING ENVELOPES “Integrated Operating Envelope” If an operating parameter has multiple limits, the “Integrated Operating Envelope” is the result of the most restrictive of these limits Tier I Tier 2 Tier 3 Limits Limits Limits Predominantly SHE and higher impact Reliability related Envelopes High impact Reliability Envelopes 14 Integrated Operating Envelope Many Optimisation and lower impact Reliability related Envelopes GRS Key Linkages (start & end 6D, 6E & 6F) 6C Equipment Strategies PM scope & frequency Critical Operating Scenarios Monitoring tasks based on criticality Critical Equipment 6B Operating Envelopes Operating Envelopes for Process Critical Parameters 6H Operator Care Effective/efficient field rounds & console monitoring 6A Site Plans and Objectives Breakdown / Discretionary Work 6D Work Selection 1 Year Plan Latest Acceptable Completion Date based SDD’s 6I Abnormal & Nonroutine Operations 6E Routine Work P/S/E 6F Turnaround P/S/E Effective response to minimize loss 15 Effective, efficient unit maintenance GRS WORK SELECTION - Work Flow All Work REJECT (Not met criteria) Screener Out-of-Program In-Program (future) TA Program Annual Program Discretionary NonCRIT 6E/6F PS&E Plan & Schedule (based on resource + material availability) Standard Repair Timeframe by Equipment Class 16 Breakdown (Functional Failure) VCRIT Break-in to Schedule WORK SELECTION – Discretionary Items GRS Benefit to Cost • A target benefit-to-cost ratio is defined by Site Management as the hurdle for task screening. • Basis is short term, both for benefit and cost. ACCEPTED REJECTED All items that clear the hurdle are selected All items that do not clear the hurdle are rejected. 17 GRS OVERVIEW GRS Element 6E - Routine Work PS&E Multi-Month Maintenance Outlook (3 month) Planning Job Pack Critical few jobs - affecting many people - significant impact on production Updated monthly Consistent with process three month outlook Detailed activity plan Library of these kept on file Job preparation activities Must be value added (criteria defined) Small jobs don't need Job Pack Short-term Updated weekly Maintenance Weeks 2-4 may have unresolved issues (evolving) Week 1 has no unresolved issues, shows Schedule - when jobs will be done (4 week) - who will do the jobs - and what resources they need - represents the 5 daily schedules for Week 1 Consistent with Process 4-Week Schedule 18 GRS OVERVIEW GRS Element 6E - Improved State 5% for Break-ins Crit Equip/Events with job packs and spares 10% requested discretionary work screened/approved “out-of-program” with higher hurdle 25% for scheduled Breakdown Mtce to repair failures 60% of annual work ($$) is predefined and risk screened in an approved Annual Program 95% Compliance to schedule Operations justify move to weeks 2/3/4 and define if any planned work slips Contingency Contingency Contingency Repairs Repairs Repairs Repairs Repairs Repairs Repairs PM’s PM’s PM’s PM’s PM’s PM’s PM’s Improve Work Improve Work Improve Work Improve Work Week 1 Week 2 Week 3 Week 4 Contingency Zero Program Slippage 19 Usually Week 4+ (ex small repairs) to allow good planning and scheduling Only schedule when ready to execute (inc matls) GRS OVERVIEW GRS Element 6F - Turnaround PS&E Site long range plans developed to identify timing for SD/TA’s and long term milestones Provide Steering Committee and organizational structure to manage TA Establish the TA strategies, objectives, basis, and key constraints Utilize a milestone plan based on SD/TA complexity covering all major activities Integrate Maintenance, Operations, Inspection & Projects plans & schedules including pre and post work activities Identification of critical and near-critical path work; includes risk assessing potential discoverables and impact on SD/TA objectives Schedule key reviews throughout Planning & Scheduling, Execution and Closeout to steward progress, cost & performance 20 GRS OVERVIEW GRS PROACTIVELY DEFINE CAPABILITY and NEEDS of the process and equipment ANALYZE LOSSES to drive continuous improvement OPERATE WITHIN process and equipment CAPABILITY Stable Unit Reliable Equipment Design it Right Operate it Right Fix it Right • Operate within defined • Equipment envelopes design supports • Structured rounds to high reliability monitor & care for • Changes managed equipment • Equipment maintenance • Planned response to needs and operating unit upset or nonenvelopes defined routine operation • Training and procedures • Monitor losses daily provided to Operations against set targets, and Maintenance identify cause, take corrective action Provide equipment and process needs EFFICIENTLY and EFFECTIVELY • Complete 100% of Annual Plan • All work planned and scheduled • Job Packs developed and used • Correct spare parts and tools available • Repairs completed right first time and on schedule • Repairs documented RELIABILITY MINDSET SKILLED WORKFORCE EFFECTIVE LEADERSHIP 21 GRS OVERVIEW GRS Element 6G/9 linkage to 6J/6A Operations & Maintenance Activities Incident 6J - Analyze 80 MTBR (months) 6E - Equipment Data 6F - Equipment Data 6G - Loss Data 6H - Observations 60 40 20 0 0 9 - Incident Investigation 500 1000 1500 2000 2500 3000 Total Cost Per Installed Pump (TCPI) (US $) 9 - Incident Data 6A Plan 1 ~~~~~ 2 ~~~~~ 3 ~~~~~ 4 ~~~~~ Estimated Opportunity by Equipment Class New Technology and 22 20 10 PRV Atm. Tanks Instruments Pumps 0 Heat Ex. External Benchmark $ 30 Analyzer M$/yr 40 Information for: Equipment Strategies 6C Operating Envelope 6B GRS OVERVIEW GRS Element 9 - Incident Investigation & Analysis Event Loss >50K$? Enter into Near Miss or Greater Potential? Database (Actual x Potential x Barriers) Actions for tracking and follow-up HLVI’s for sharing per GMOP 9.1 Categorize Per RCFA STD (+ GRS 9 considerations) Tool CFWT (Causal Factor Why Tree) Link RCFA Factors to GRS Elements High Medium Low 5 - WHY 23 Site only GRS OVERVIEW GRS GRS drives the following key concepts . . . PROACTIVELY DEFINE CAPABILITY and NEEDS of the process and equipment based upon criticality ANALYZE LOSSES to drive continuous improvement OPERATE WITHIN CAPABILITY of process and equipment Stable Unit Reliable Equipment Design it Right Operate it Right • Operate within defined • Equipment envelopes design supports • Structured rounds to high reliability monitor & care for • Changes managed equipment • Equipment maintenance • Planned response to needs and operating unit upset or nonenvelopes defined routine operation • Training and procedures • Monitor losses daily provided to Operations against set targets, and Maintenance identify cause, take corrective action • EFFICIENTLY and EFFECTIVELY PROVIDE NEEDS of Fix it equipment and Right process Complete 100% of Annual Plan • All work planned and scheduled • Job Packs developed and used • Correct spare parts and tools available • Repairs completed right first time and on schedule • Repairs documented RELIABILITY MINDSET SKILLED WORKFORCE EFFECTIVE LEADERSHIP 24