O’Hare Airfield Configuration
EXISTING
Airfield Configuration
FUTURE
Airfield Configuration
Disclaimer – Any and all information contained herein is subject to change without notice
1
North Airfield Project Layout
MT. PROSPECT RD. /
GUARD POST 1
RELOCATION
R/W 9L-27R
PAVEMENT &
ELECTRICAL
R/W 9L-27R
NAVAIDS
(by Contract)
NEW
PERIMETER
ROAD &
FENCING
R/W 9L-27R SITE
PREPARATION
90" JAWA
WATER MAIN
RELOCATION
(a)
90" JAWA
WATER MAIN
LINE STOP
(“HOT TAP”)
DES PLAINES LAND
ACQUISITION AREAS
ELK GROVE
LAND
ACQUISITION
AREAS
(c)
(b)
NORTH AIRFIELD
ASR-9 (a)
RTR – P (b)
RTR – Q (c)
AMERICAN
AIRLINES
PARKING LOT
RELOCATION
NORTH
AIRPORT
TRAFFIC
CONTROL
TOWER
(NATCT)
AIRFIELD
VAULTS &
ASSOCIATED
DUCT BANKS
(combined
w/South)
NORTH
AIRFIELD
ARFF
SERVICE
ROAD
14L THRESHOLD
DISPLACEMENT
NORTH BASIN
PUMP STATION
LLWAS EXPANSION /
RELOCATION
4 North Airfield
Locations
Contract Awarded
Under Construction
Contract Completed
Disclaimer – Any and all information contained herein is subject to change without notice
2
South Airfield Project Layout
R/W 10L
NAVAIDS
R/W 10L PAVING
& ELECTRICAL
R/W 10L MASS
GRADING
(c)
R/W 10C-28C
CARGO
TUNNEL
EXTENSION
CARGO
TUNNELS &
TAXIWAY
45
(by Contract)
R/W 10L
TAXIWAYS
R/W 10C-28C MASS
GRADING &
CONSTRUCTION
(CENTRAL)
R/W 10C-28C PAVING &
ELECTRICAL (EAST) &
R/W 10C-28C NAVAIDS
R/W 10C-28C PAVING &
ELECTRICAL (WEST)
10C BERMS 5 AND 6
& 10L SITE
PREPARATION
(a)
CARGO
APRON
R/W 10C-28C
MASS
GRADING
(EAST)
(c)
(b)
SOUTH BASIN
SITE
PREPARATION
(d)
BENSENVILLE
LAND
ACQUISITION
AREAS
SOUTH RTR’S
R & S and LLWAS
LLWAS (a)
RTR – R (b)
RTR – S (c)
(b)
ALTERNATE
BENSENVILLE
DITCH
RELOCATION
BENSENVILLE
DITCH
RELOCATION
FEDEX CARGO
BUILDING
RAILROAD RELOCATION (4 Packages)
RAILROAD METRA SOUTH (a)
RAILROAD INTERSECTION SOUTH TO METRA (b)
RAILROAD INTERSECTION NORTH (c)
RAILROAD INTERSECTION GRADE SEPARATION (d)
10C-28C
CARGO AREA
SITE
PREPARATION
UNITED CARGO
BUILDING
INTERIM RAIL
RELOCATION &
CARGO
ACCESS RD
SOUTH
SERVICE
ROADS
FUELING
SYSTEM
REPLACEMENT
AIRFIELD VAULTS &
ASSOCIATED DUCT
BANKS (combined
w/North)
Contract Awarded
(a)
Disclaimer – Any and all information contained herein is subject to change without notice
Under Construction
Contract Completed
3
Work in Progress Photography: 10C Berms 5 & 6 and 10L Site Prep
Berms 5 & 6 facing North.
Berms 5 and 6 facing Northeast.
Irving Park Road berm facing South.
Compacting asphalt grindings for bituminous
paving of proposed service road.
Disclaimer – Any and all information contained herein is subject to change without notice
4
Work in Progress Photography: South Basin Site Prep
Phase 1B - Taxiway ZJ tie in.
Placement of concrete pavement for Taxiway ZJ.
Finishing of concrete pavement for Taxiway ZJ.
Replacement of 66" Stormsewer above
Stormsewer System 1H.
Disclaimer – Any and all information contained herein is subject to change without notice
5
Work in Progress Photography: 10L Mass Grading
Excavating for CED Manholes facing South.
South face of Berm 3.
CED Manholes installed facing Northwest.
Crane at Jacking Location 3.
Disclaimer – Any and all information contained herein is subject to change without notice
6
Work in Progress Photography: 10C-28C Mass Grading
Overall view of existing South Basin.
Preparation of construction ramps.
Stripping topsoil for storm sewer installation.
Embankment of construction ramps for access
to Stormsewer Systems E & F.
Disclaimer – Any and all information contained herein is subject to change without notice
7
Disclaimer – Any and all information contained herein is subject to change without notice
8
Disclaimer – Any and all information contained herein is subject to change without notice
9
Disclaimer – Any and all information contained herein is subject to change without notice
10
Disclaimer – Any and all information contained herein is subject to change without notice
11
Disclaimer – Any and all information contained herein is subject to change without notice
12
Disclaimer – Any and all information contained herein is subject to change without notice
13
Disclaimer – Any and all information contained herein is subject to change without notice
14