SAFETY AND HEALTH
ASSESSMENT SYSTEM
IN CONSTRUCTION
SHASSIC
Ir.M.RAMUSEREN
CIDB
WHAT IS SHASSIC ?
SAFETY AND HEALTH
ASSESSMENT
SYSTEM IN
CONSTRUCTION
THE DEVELOPMENT
PROCESS




SHASSIC was identified by National Technical
Committee who developed the Master Plan for
Occupational Safety and Health in Construction
Industry. This Master Plan was approved by Cabinet
on 2nd August 2006.
Technical Committee for Safety and Health in
Construction ( formed by CIDB) directly involved in
the development of SHASSIC
Members representation from:CIDB, DOSH, JKR, JKT(KPKT), MBAM , PKMM,
PAM, REHDA, IJM, UM, KPPDIP, MOSHA, NIOSH,
SHASSIC STANDARD = CIS 10
SHASSIC OBJECTIVES



To benchmark the level of safety and health
performance of construction industry in
Malaysia
To have a common standard on safety and
health assessment system for contractor (s)
in construction industry
To assess safety and health performance
of contractor based on approved standard
by the industry stakeholders
SHASSIC OBJECTIVES
Continue….


To evaluate the performance of
contractor(s) based on the safety and health
practices; and
To compile data for statistical analysis on
contractor’s safety and health management
and performance at sites
SHASSIC OBJECTIVES ( con..)


To study on which area contractors has failed
or could not score higher points so that
appropriate training can be organized
Part of preparation for OSH management
system in long run
CRITERIA CONSIDERED FOR THE
DEVELOPMENT OF SHASSIC
Compliance to legal requirements
- OHSA 1994, FMA, BOWEC Reg,
Safety,Health & Welfare Reg,etc
 Based on approved Standard & good practice
- OSH MS such as OHSAS 18001 AND MS
1722 etc

COMPONENT OF
ASSESSMENT & WEIGHTAGE

Divided into 3 categories:-

DOCUMENT CHECK
WORKPLACE INSPECTION
EMPLOYEE INTERVIEW


- 40%
- 40%
- 20%
SHASSIC REQUIREMENT





Work Progress has to be within 25% to
75%
WHY ?
Construction at peak
Many activities
Workers at full Strength
Potential accidents
DOCUMENT CHECK



Checking on documents and records - to
determine the compliance of establishment of
OSH program and activities
There are 63 questions/checklists
Weightage is 40% of the total marks of 100
WORKPLACE INSPECTION




This assessment shall provide visual
comparison of evidence on the OSH program
that being implementation, enforced and
practiced at site.
There are 62 questions/checklists
5 (five) high risk areas shall be assessed
within the site ( areas to be decided by
Assessor)
It carries 40% of overall weightage
HOW TO IDENTIFY 5 AREAS?






Talk to Project Manager or SHO at Site to
identity the areas
There must be construction activities going
on
Working at height shall be given preferences
Working in confine area
Working at congested area
Many people working within small area
EMPLOYEES INTERVIEW





Employees shall be randomly selected for
interview purpose
Divided into 3 categories of Employees,
namely, management personal ( 1), safety &
health personals (3) and finally workers(10)
from various trades
The set of questions are different for each
categories
There are 48 questions all together(12, 6, 30)
It carries weightage of 20%
METHOD TO CALCULATE
SCORE FOR ASSESSMENT


Document Check
Total compliance in the checklist / ( 63
minus Number of Not applicable items) X
40% = A ( score for document check )
METHOD TO CALCULATE
SCORE FOR ASSESSMENT


Workplace Inspection
Total compliance in the checklist / (
62X5=310 minus Number of Not applicable
items) X 40% = B ( score for Workplace
Inspection )
METHOD TO CALCULATE
SCORE FOR ASSESSMENT


Employees Interview
Total compliance in the checklist / ( 330
minus Number of Not applicable items) X
20% = C ( score for Employees
Interview )
TOTAL CHECKLISTS




Document Check
Workplace Inspection
Employee Interviews
6(x3)+ 30 (x10)
63
310 ( 62 X 5 )
330 ( 12(x1) +
TOTAL = 63 + 310 + 330  703
/ site
RATING



The total score based on the document
check, workplace inspection and
employees interview ( A + B + C ) shall be
used for rating purpose
The RATING has 1 to 5 stars based on total
marks scored
85 – 100 = 5 stars, 70 – 84 = 4 stars, 55 –
69 = 3 stars , 40 – 54 = 2 stars and 1 star
for 39 and less marks
SCORE
85 - 100
70 - 84
55 - 69
STARS
( RATING )
SCORE
40 - 54
39 and
less
STARS
( RATING )
JUSTIFICATION FOR RANKING
STARS


5 STARS - Potential and significant
workplace high risk/hazards are managed
and documented
4 STARS - Potential and significant
workplace high risk/hazards are managed
and documented but there are few low
risks work activities are neglected
JUSTIFICATION FOR RANKING
STARS ( continue )


3 STARS - Potential and significant
workplace high risk/hazards are managed
and documented but there are few
medium risks work activities are
neglected
2 STARS - Potential and significant
workplace high risk/hazards are managed
and but not documented.
JUSTIFICATION FOR RANKING
STARS ( continue )

1 STAR – workplace potential and
significant risk/hazards poorly managed
and not documented properly
ASSESSOR




Who can be the SHASSIC Assessor (s) ?
A person who has attended one day training and
passed exam and must have 5 years woking
experience in construction industry
Attended and passed Lead Auditor OHSAS
18001/MS 1722 course and with 3 years working
experience in Construction Industry
CSHO with 2 years working experience in
construction industry
HOW TO REGISTER AS SHASSIC
ASSESSOR WITH CIDB




Submit evidence of work experience
A copy of identity card
Certified True Copy of Exam Result / Auditor
Certificate /DOSH Green Book + 5 days
Must be Green Card holder
Condition for Registration



Submit relevant documents to CIDB and copy
of Green Card
CEP = 20 points ( 1 hour = 2 point )- for
renewal
Can attend course/seminar organize by
anyone BUT has to be related to
Construction Safety & Health
CIDB rights to De-Register
Assessor





The Assessor declared bankrupt by Court
Assessor passed away
Assessor became unsound mind
Sentence by court as Criminal
Failed to renew
POTENTIAL USER OF
SHASSIC DOCUMENT





DOSH
JKR
LOCAL GOVERNMENT
CLIENT OR DEVELOPER
CONTRACTORS
WHAT IS EXPECTED FROM
THE USAGE OF SHASSIC ?





Good safety and health management at site
Prevention exercise from incidents and
accidents
Contractor knows where they are in term of
managing safety and health at sites
To improve safety and health management
based on scores
Easier inspection by authorities as procedure
already in place
THANK YOU