Transcript Document

E-Rate Update
Winter 2015
Rex Miller
Introduction
E-Rate 2.0 has arrived
•
Today’s session is focused on the changes enacted by the recent E-Rate
2.0 and 2.1 FCC orders
•
Seek out experienced assistance as you prepare and work through the
next E-Rate season
Q&A
• At the end of the presentation
• ENA is available at your convenience
• Webinar will be available on the ENA website at www.ena.com
ENA Background
Customer service and education focus
•
•
•
K-12 customized service
E-Rate expertise
• E-Rate Program Service Provider since Year 1 (1998)
Experienced E-Rate team
• Rex Miller, April Scott, Kris Vivrette, Madeline Dusenberry, Ward
Chaffin
E-Rate Service Provider Leader
•
•
•
A Top-10 E-Rate Service Provider
Over $500M in E-Rate funded
Over $144M in 2014 E-Rate filings
E-Rate News
Window Opening Date set
•
Opening January 14, 2015
•
Closing March 26, 2015
•
Similar to last year
•
Filing early is strongly encouraged
Eligible Services List issued for ’15-16
•
Streamlined to match the E-Rate 2.0 order
•
Includes overview of items removed from list
New 470 and 471 for ‘15-16
E-Rate Order 2.1 Approved December 11th
•
Order has been released
E-Rate 2.0 Things to Remember
On Dec 11th, the FCC approved the 2nd Order related to E-Rate 2.0
•
•
•
The Main Focus is an increase in E-Rate funds of $1.5 Billion
This Order includes several changes to support fiber deployment including
dark fiber and fiber construction

Many of these changes go into effect 7/1/16, but require actions well in
advance of that date to understand and execute on the changes
The Order also requires a performance management system for USAC to
be developed which appears to focus on both USAC efficiency but also
USAC ability to manage cost effectiveness and provide technical support to
applicants
All of this subject to •
•
WCB/USAC interpretation –
 Where they are tasked to figure things out
PIA Review 2015 –
 Where the things they don’t always tell us will be implemented re: testing
The original order indicated that much of this was a two year test
• The Second Order removed the two year test concept for most items
Stay tuned for more changes and updates
Goals
Per FCC, E-Rate 2.0 has three main goals:
1. Affordable access to high speed broadband
2. Maximizing cost effectiveness
3. Making E-Rate fast, simple and efficient
We will attempt to combine both orders in the
overview
Goal 1 – Affordable Access to High Speed Broadband
• Affordable access to high speed broadband
 Created Category 1 and Category 2
– Category 1 – Broadband – this is funded first
» Discount rates remain same matrix
» Construction cost amortization no longer required
– can receive all construction costs in Year 1
» For 2016 • Certain differences between dark fiber and lit
fiber have been removed
• Applicants can construct their own fiber if most
cost-effective and subject to certain
safeguards to be described in Order 2.1
» Construction for C1 SCC can begin Jan 1st
– Category 2 – Internal Connections
Category 2
Category 2 – Internal Connections
• $1 B target for internal connections
 Order 2.1 guarantees the $1 B target each year
 This not just Wi-Fi
 Shortened list of eligible items
– Routers, Switches, Wi-Fi
– Added caching
– Cloud services OK
– Basic maintenance of eligible items is OK as part of
the per student cap
• ENA – even if districts have Wi-Fi, they still get to spend
$150 on basic maintenance, routers, switches, etc. for LAN
Category 2
• Managed Wi-Fi Eligible –
 Renamed Managed Broadband Internal Connections by
FCC
 Third party service allowed for LAN and WLAN
management
• Eliminated –
 Everything else – including PBXs and Servers
Category 2 Funding
•
90% discount reduced to 85%
 All other discount levels unchanged
•
$150 per student available over 5 years ($2.30 per square foot for libraries)
 Can be received all in year 1
 Ordered by discount rate
 5 year applicant “budget”
 $9,200 funding floor per school/library
 Order 2.1 includes more $ for large urban libraries ($5 per sq ft)
– Libraries should test their status – IMLS codes 11, 12 and 21
•
Current 2 in 5 rule removed
•
Student Counts –
 Can use estimate for new buildings
 Can count students at 2 buildings if attend multiple schools
– Order 2.1 – must prove that part-time students regularly increase
the maximum number of students on school premises at the
same time during the school day
•
Category 2 Installation can begin on April 1st
Category 1 Services
• Phase down support for Voice, VoIP and other legacy
services
 Voice including VoIP and cellular/mobile
– 20% discount rate reduction per year starting 2015
• Items removed 2015 – no phase-down
» Web Hosting
» Voice Mail
» E-Mail
» Paging
» Texting
» Directory Assistance
Category 1 Services
• Items removed 2015 – no phase-down
 Cell Service data plans and Air Cards – unless they can be
cost effective vs. other internal broadband or external
broadband
– Presumption that data plans are not cost effective and
you will have to prove otherwise
 Custom Calling Plans
 Direct Inward Dialing
• Cost allocation of bandwidth related to voice
 Order 2.1 attempted to clarify
 If bandwidth is dedicated to voice, must cost allocate
• ENA – some pieces of currently eligible voice are immediately
ineligible and some are phased out
 Need to watch how PIA treats this as some of these items
are normal components of voice service
Goal 2- Maximizing Cost Effectiveness
• Adopt Cost Transparency to share cost
and connectivity data
 Item 21 Data now public
• Encourage Consortia Purchasing
 Still being determined
• Emphasize Lowest Corresponding Price
Goal 3 – Making E-Rate Fast Simple and Efficient
• Streamline application process?
 SLD goal – all workable applications approved by 9/1
 Tech Plan eliminated
• Simplify discount rates?
 District wide rate – not school by school
 CEP option method available
 Rural/Urban – now using Census Data
– SLD Tool on-line now
• Simplify invoicing/disbursement
 BEAR payments direct to applicants – next year
• Protect against fraud, waste and abuse
 Increase Document Retention to 10 years
New Forms
• Form 470
 Very few changes
 Can use 2014 form until new form is available online
• Form 471
 Redesigned to meet new rules
 New questions regarding network scalability
 Discount Rate changes included
 Separate category for Voice Services
 Item 21 part of 471 – not a separate attachment
 Category 2 Budget Information
 Test this when it is available
Order 2.1
• In addition to $1.5B of added funding, the new Order makes
the following changes to incent rural broadband
 Removes multi-year amortization of one-time charges
 Starting in 2016 –
– Allows applicants to pay one-time in installments
– Equalizes treatment of dark fiber –
» Allows SCC
» Allows modulating equipment
– Permits self construction of fiber
» Requires bid for lit to qualify
– Potential for State Investment Match
– High Cost Program recipients required to bid
 Performance Management Program for USAC/SLD
Things We Think We Know
• Test your discount rate now so that it is not a surprise
 Could have changes due to district wide average/CEP
 Make sure to test all sites in new Urban/Rural Tool
– Correct any invalid addresses ASAP
• Start thinking about your budget
 Can you get $ for new Category 2
– FCC/SLD encourage all to apply?
– Order 2.1 seems to confirm that there will be $1 B
– Will Category 2 get any leftover $
 Impact of Voice and other changes
– 20% Phase Down means 20% of total cost of voice
Things We Think We Know
• Form 471 Likely to Require More Time To Complete
 Item 21 new format
 Category 2 Budget
 Discount rate changes
– Some should be automatic
– Different discount rates for Voice vs. Internet vs C2
– Urban/Rural changes
 Separate category for Voice Services
– Allocation of Cost Allocated Bandwidth $ to Voice?
 Eligible vs Ineligible Items and Cost Allocation
Timing of 2015 Approvals
• 2014 Year has been a great year for approvals – much
improvement
 2014 year had unique circumstances
» No P2 funding for two years leading to significantly
fewer applications to review
» More staffing hired to make sure process was
faster
• 2015 year is much more complex
 New Category 2 funding to be approved
 Integration of significant changes in eligible services
 Up to three different discount rate matrixes to apply
 Additional items requiring changes to forms and practices
• Expect slowdown in approvals – especially if FCC wants to
push Category 2 approvals faster or at equal speed as
Category 1 funding requests
471 Timing
E-Rate Timing Soapbox
E-Rate continues the trend of the later closing of filing window in
March
Strongly encourage applicants who want to get approved before
July 1 to file their 471s as soon as possible
• Target mid-February at the latest
PIA will likely start for you before the 471 filing window is closed, so
be ready
Advantages
• Earlier approval
• No last-minute rush to file
• If you have an error, you can file another 471 before filing deadline
and cancel initial incorrect filing – probably easier than using RAL
process
Resources
Contact ENA
•
•
•
•
•
Rex Miller – [email protected]
April Scott – [email protected]
Kris Vivrette – [email protected]
Ward Chaffin – [email protected]
Madeline Dusenberry – [email protected]
SLD News Brief – make sure your are signed up for these e-mails
•
•
Go to the SLD website’s training section to sign up
Key info provided on changes to the program all year long
Websites
•
SLD – main E-Rate rule site – training/WebEx
 www.universalservice.org/sl/
 Fall training slides will be posted if you cannot attend
 E-Rate Modernization section and webinars
– Specific topic videos posted and to be added
Contact ENA Today
Rex Miller
[email protected] - 615.312.6005
www.ena.com
@ENAconnects ⎜ facebook.com/ENAconnects