Incorporating SWS into State Field Standards

Download Report

Transcript Incorporating SWS into State Field Standards

Incorporating SWS into State Field
Standards
NASCSP Annual Training Conference
Phoenix, AZ
September 12, 2013
SWS into State Field Standards
• Does your State have a Field Guide?
• Is it State-specific or Regional?
• Is your Field Guide current?
SWS into State Field Standards
• The SWS is a clear definition of the
expectations of DOE
• Standards are in place. Grantees must
implement these standards
• States must define the inspection process and
the protocols they will implement
• Day One Program Year 2014, all units must
meet SWS specifications
Indiana Experience
• Developed a Field Guide in 2003
• Field Guide was updated in 2005, 2007,
2009, 2011, & 2013
• Wx Technical Committee provides Field Guide
maintenance
• Technical Committee consists of State
Monitor, Trainers, Auditors & Inspectors,
Building & Heating Technicians
Indiana Experience
• Indiana’s Field Guide was designed to
describe the task to be performed, state the
Standard, and then illustrate the Procedure
• All Wx Program forms were inserted in the
Field Guide along with any material &
workmanship specifications
• INCAA Trainers use Field Guide in all courses
• State Monitors reference Field Guide in all
monitoring findings & concerns
Incorporating SWS into Field Guide
• SWS sections include H/S, Air Sealing,
Insulation, Heating/Cooling, Ventilation &
Baseload
• Indiana Field Guide sections are Building
Model, Health/Safety, Heating Systems, Air
Sealing & Insulation
• Crosswalk begins by identifying what
measures Indiana performs
• Crosswalk assignments made by trainer
expertise
Initial Plans
• Start with SWS On-line tool that allows us to
identify measures specific to Indiana’s
program
• Concentrate on the measures & tasks we
perform every day
• Identify the SWS & Indiana Field Guide
inconsistencies
• Technical Committee processes
inconsistencies
Challenges
• When cross-walk is complete, Indiana must
determine the format appropriate for use
• Trainings specific to the Field Guide changes
must occur prior to April 1, 2014 (SATT)
• Starting April 1, 2014, SWS fully integrated in
training, monitoring & field operations
• Identify and remedy Wx network issues before
monitoring begins
Outcomes
• Reasonable fit with the SWS
• Keep it Simple
• QCI Protocol consistent with monitoring
• All QCI certified by April, 2013
• Identify network challenges
• Provide technical assistance accordingly