Click to add title
Download
Report
Transcript Click to add title
NEW CONSTRUCTION TECHNOLOGY
A proposal having opportunity to generate
Rs 2,10,600 Cr. (US $468 Billion) the saving part only for
construction Industry world wide every year
“By Marketing New Construction Technology and issuing
Licenses World Wide” for a technology which reduces the cost
of construction by 36%
(Patent Under Process)
Mail.id ;[email protected]
Innovation by- Suresh Chawla
www.sureshchawla.com
Company
LOGO
INDIA HAD IT ALL
Indian mythology : In Mahabharta, Vishvakrama created “ Dwarika” in one
night for Lord Krishna when he fled Mathura for fear of Jarasandh Raksha to
save brahmins.
When Pandvas were separated from Duryodhana the barren land of
Indraprastha was converted in to their beautiful capital in unbelievable time
frame.
It looked like an epic and dream to me before innovation of my technology, but
having innovated the technology
“when i found out that on third day, 1000s of families can be settled in 1000sof
units of houses made in R.C.C which would last 100 years with electricity,
sanitation and water supply in place.
It looked no surprise to me that technology to create long lasting structures in
no time was in deed prevail ant in olden times in India.
(This technology is reincarnation of same technology)
NO BODY WILL EVER CONSTRUCT A HOUSE OR CARRY OUT ANY KIND OF
R.C.C.CONSTRUCTIONS ON THIS EARTH USING PRESENT CONSTRUCTION
TECHNIQUES, ONCE NEW CONSTRUCTION TECHNOLOGY IS MADE PUBLIC
WHY :
1) When a house owner or a builder who wants to build a house or a
multistory building or a Fly -over will see one floor of his dream
houses/building which is going to last 100 years is ready in one
single day cast in situ ¬ prefabricated that too at 36% lower in cost
2)With all Columns, Beams and Walls including internal tiles/ external
stone – cladding etc complete pending curing & painting only
3) With all doors& window duly painted with all Fittings and Glass in
place in single day
4) With all concealed electric conduits, all fire fighting and heating pipes
in place, with all concealed water supply - pipes, sanitary, plumbing
pipes etc in place and for that matter all concealed items in place .
5) With all concealed electrical, T.V. telephone, fire-fighting, heating, airconditioning and all other kinds of wirings in place in single day.
6) With inside walls ready for POP in 24 hours in one option or left for
curing the interior walls as well as exterior as per the period required
NEW TECHNOLOGY CONVERTS THE
CONSTRUCTION INDUSTRY INTO MOST SIMPLE
PROCESS ON EARTH
7) Not only that but scaffolding out side the building which is required
for entire building & for entire construction period is not required in
this technology and in its place scaffolding for only one floor of
whole multistory building is required at one time
8) Not only that but all ornamental exteriors, domes, chajjas,
recesses, balconies etc can be in place & cost of construction can be
reduced drastically
9) Not only that but the owner does: not require to look for any labor
be it a mason or a plumber or a carpenter, a painter or an electrician
or even a single laborer at his site of construction.
10) Not only that but the technology is so simple that from a villager
constructing a single room to a Contractor constructing Fly-Overs,
Bridges Dams. Drains, Columns for Mass Transportation ,Water
Tanks, Man Hole Covers, and what not will use this technology to save
on cost, enormous time . “The cost over run will be a thing of past”
11) Not only that but the design of the house is by architect and
structure designer and not prefabricated or mass construction
NEW TECHNOLOGY CONVERTS THE
CONSTRUCTION INDUSTRY INTO MOST SIMPLE
PROCESS ON EARTH
12) Not only that but for a pre -designed house which will now be
available on web sites and though albums in workshops round the
corner provided by leading corporate houses who will adopt the
technology as industry, the owners will not require Architects and
Structural Designers and other Consultants also.
.
Why any one on this earth will ever think of making his house or
carry out any kind of civil construction on this earth using
present technologies when one can avail this technology at
much reduced cost i.e. 36% lower than present construction
cost as explained here after and in shortest possible time
required for all kinds of constructions be it:
“Buildings, Bridges, elevated corridors for transport, fly-over's,
roads, drainage, dams, water tanks , man hole covers etc.
SUPER FAST CONSTRUCTION TECHNOLOGY
INVENTOR : SURESH CHAWLA
INNOVATION : NEW PROCESS
APPLICATION: ALL RCC CONSTRUCTIONS
A
: ALL WOODEN CONSTRUCTIONS
PROSPECTS: WORLDWIDE
INVENTOR DESIRES : SALE/ SHARING OF REVENUE
MARKETING: ISSUE OF LICENSE & SELLING TECH
SUPER FAST CONSTRUCTION
A revolution in construction industry is
waiting to happen which will turn all present
construction techniques upside down and
obsolete
DISPLAY OF TECHNOLOGY
DISPLAY OF TECHNOLOGY. IF IT IS OK FOR
ONE UNIT IS OK FOR MULTIPLE UNITS
DISPLAY OF TECHNOLOGY IF IT IS OK FOR
ONE UNIT IT IS SAME FOR MUTIPLE UNITS
EVEN FLOATING R.C.C. CONSTRUCTIONS OF ALL KINDS
CAN BE CREATED IN WATER AS WELL
POSSIBLE TO CREATE FLOATING
R.C.C PLATFORMS AT LEAST COST
POSSIBLE TO CREATE FLOATING R.C.C PORTS AT LEAST
COST WITH OUT REQUIREMENT OF BACK FILLIG
LOW COST HOUSING IN A
SINGLE DAY POSSIBLE
LOW COST HOUSE
CONSTRUCTED IN 8 HOURS
PRACTICAL DEMONSTRATION OF LOW
COST HOUSE IN JUNE 2010 IN ODISH STATE
POSSIBLE TO CONSTRUCT R.C.C.
STORAGE DOMES IN 7 DAYS
DEMOSTRATION OF TECHNOLOGY
CAN ALSO BE MADE ON DEMAND
TECHNOLOGY HAS BEEN PRACTICALLY
DEMONSTERATED BUT CAN BE INSTANTLY
DEMONSTRATED TO WILLING PARTENERS
WHO WANT TO MARKET THE TECHNOLOGY
GLOBALLY WHICH HAS CAPACITY TO
CHANGE THE CONSTRUCTION SECTOR
FOR ALL TIMES TO COME IN TERMS OF
COST AND TIME & AT THE SAME TIME
BRING BILLIONS OF DOLLARS FROM SALE
OF TECHNOLOGY
EXPERIENCE IN
CONSTRUCTION SECTOR
As a builder, Suresh Chawla interfaced mechanical
engineering with civil engineering to complete numerous
projects at fastest speed.
Soon he became most favored class 1 contractor.
Having the surprising energy level and desire to produce
fast results, he identified Exhibition Ground in Delhi
where emergency works were the order of the day and
International and domestic Exhibitions are held on
regular basis. Full profile can be seen by visiting web site
---presentations at right top under head (projects
executed) some of the mentionable projects are provide
here after
EXPERIENCE IN CONSTRUCTION
Civil and interiors of
National Museum Delhi
Civil and interiors of Delhi
High court
Civil and Interiors,
Hotel Vasant continental Delhi
Dome type Cinema Theatre
50 ft high,70ft Dia including interiors
exteriors at APPU GHAR Delhi
(FASTEST BUILDING EVER MADE
ANY WHERE IN THE WORLD)
First Amusement Park of India
in Delhi (APPU GHAR)
90 days
90 days
70 days
6 Days
46 Days
Setting up of 11 amusement parks
in various cities of India in 18 months
Or on an average for each park
45 days each
Bihar Pavilion 3 storey building
of approx. 12,000 sq ft area
right from foundation to exteriors
to interiors etc complete
at Pragati Maidan-Delhi
40 days
UP Pavilion 5 storey building
of approx 20,000 sq ft area
right from foundation to exteriors
To interiors etc complete
at Pragati Maidan-Delhi
90 days
Construction of 12 buildings
in engineering college in Raya
choti (Andhra Pradesh)
180 days
Construction of 5 floor school building
Yamuna nagar(Haryana)
42 days
TECHNOLOGY
Proposed Construction technology is using the
same materials in a different process and IS NOT
A PREFAB. It is cast at site in RCC using all
existing construction codes and structural designs.
APPLICATIONS
THIS TECHNOLOGY MAKES IT POSSIBLE TO CONSTRUCT
PERSONALIZED HOUSES, BUILDINGS
FLY OVERS, BRIDGES, DAMS, HYDEL PROJECTS
FOOTPATHS, DRAINAGES, SEWAGE &
MAN HOLES ETC.
WATER STORAGE TANKS AND TREATMENT PLANTS
NUCLEAR PLANTS
STRUCTURES FOR ELEAVTED MASS TRANSPORT SYSTEMS
ALL KINDS OF RCC CONSTRUCTIONS IN SHORTEST POSSIBLE
TIME AT ALMOST 25% LESS COST
THE TECHNOLOGY MAKES IT POSSIBLE TO CONSTUCT EVEN
WOODEN HOUSES IN SHORTEST POSSIBLE TIME WHILE
FOLLOWING ALL CODES OF CONSTRUCTIONS OF DIFFERENT
REGIONS APPLICABLE AS IN CASE OF USA AND ELSEWHEE IN THE
WOLRD
ADVANTAGES
Your Dream Houses, Multi-Story Buildings, Bridges, Flyovers
and other Civil Structures made as per designs of your
Architects, Structural Designers &Consultants in shortest
possible time frame at lowest cost & with no cost over runs.
Technology offers freedom to construct many floors at one
time.
Don’t need to put up with Carpenters, Masons, Plumbers,
Electricians, Workers and even Supervisors anymore.
More Earthquake resistant, longer life span constructions than
brick work constructions which have 35 years of life where as
R.C.C. Constructions have 100 years of life span at less cost as
compared to present technologies.
No mass construction or similar designs as in prefabricated
buildings.
The word delay for Mega Projects planned by Governments
World wide will become “Past Tense” and cost over runs
because of inflation and increase in cost of basic materials will
become rare and projects planned by Governments will meet
required “Schedules in Cost & Time Frames”
ADVANTAGES OF USING THIS
TECHNOLOGY
Lot of companies will benefit from this technology like Steel &
Cement Manufacturers, Truck Mounted Concrete Pump
Manufacturers, Cement Concrete Mixing Plant Manufacturers,
Batching Plant Manufacturers and Building Material
Manufacturers etc. due to sudden spurt in demand for basic
materials and machinery once technology is made public.
Corporate will latch on to the technology to convert
construction sector in to an industry & provide constructions
on web sites & through their net work of work shops around
the world to provide machine finished constructions & provide
a respect to the sector by providing their trade name to
Constructions. Corporate will not only provide their names to
the trade but Technology will open one more opening for
Architects Structural Designers and Consultants to provide
innovative designs to Corporate who will conduct
competitions to extract best designs and constructions world
wide.
Companies taking long time to construct wooden houses in
USA will benefit in time cost, labor and cost over runs by using
our technology which is suitable for wooden constructions as
well.
OBJECTIVE
To limit time required for
Reinforcement binding
Scaffolding
Door window frames fixing
Concealed Conduits
Electric boxes
GI Pipes
CI Pipes
Rainwater Pipes
Traps
To ZERO
TIME FRAME TECHNOLOGY OFFERS FOR
VARIOUS KINDS OF CONSTRUCTIONS
EXAMPLE 2
Fly- Over
Day zero- Order For fly-Over placed,
upper layer of ground clearing starts
Day -15 Ground prepared, PCC Cast
Day -20 basic work complete, Concrete
casting begins
Day-22 Beams, slabs work starts
Day -30-40 over fly over ready for Traffic
TIME FRAME TECHNOLOGY OFFERS FOR
VARIOUS KINDS OF CONSTRUCTIONS
EXAMPLE 3
Columns for Elevated Transport
Day Zero- Order placed for all Columns
Digging starts
Day -15 - Digging complete, PCC in Position
Day-16 - Concrete casting starts for as
many Columns as, the capacity of
Truck mounted Concreting Pumps
TECHNOLOGY TURNS TABLES
* The advent of this technology will make
present day method of construction
redundant and obsolete
*It converts the most tedious method of
constructions to most simplest act on this
planet.
OPTIONS ON INTERNET
Now multinational companies engaged in
development of software can also sell houses,
buildings and all kinds of constructions online. The
new technology opens one more sector for
multinational companies not only for RCC
constructions but wooden buildings as made in
USA taking long time for each house to all such
constructions world wide.
PRESENT CONSTRUCTION CYCLE DIAGRAM
PRESENT TECHNOLOGY
SHUTTERING
&
SCAFFOLDING
REINFORCEMENT
BOUND AT SITE
DIGGING
WALLS PLASTERED
AGAIN
CONSTRUCTION
METHODS
ELECTRICAL &
PLUMBING WORK
STARTS
FOUNDATION
CAST
REINFORCEMENT
BOUND TO EXTENDED
STEEL MEMBER
SHUTTERING
&
SCAFFOLDING
WALLS
ERrECTED
SUPER FAST CONSTRUCTION
Progress Diagram
STEP 1
•
• Place the order
with workshop who
has license to
undertake this
process of
construction
• Provide
structural,
electrical, plumbing
architectural
drawings
• Start digging at
your site
STEP 2
• Once ready
with
digging,
construction
team will
reach with
basic
infrastructure
, which can
be inspected
by architect,
electrical,
plumbing and
other
inspectors
STEP 3
•Concreting
starts once
clearances from
inspectors is
obtained.
• Basic structure
with doors,
windows, tiles,
stone cladding i/c
concealed water
pipes, electrical
wiring & conduits
etc will be handed
over by next day.
WHERE CONSTRUCTIONS WILL
BE BUILT NOW
NOT ONLY HOUSES BUT ALL KINDS OF
RCC CONSTRUCTIONS FROM NOW ON
WILL BE CARRIED OUT IN SMALL AND BIG
WORK SHOPS WHO WILL GET LICENSES
FROM US OR OUR ASSOCIATE MARKETING
COMPANY TO BUILD ALL KINDS OF
CONSTRUCTIONS , BE IT FLY OVERS,
BRIDGES, STRUCTURES FOR MASS
TRANSPORT, WOODEN HOUSING
SYSTEMS,DAMS, WATER STORAGE
TANKS,NUCLEAR PLANTS ETC IN
SHORTEST POSSIBLE TIME AT LOWEST
COST AND WITH LEAST LABOR FORCE.
COMPARISON OF COST BETWEEN
PRESENT AND PROPOSED TECHNOLOGY
Context : India
ASSUMPTIONS
Basis for rates in market as on 1/05/11
CONSIDERING COSTS 1:2:4 (in INR)
CEMENT CONCRETE/cum
4500
STEEL/ton
40000
Bricks (1000)
3000
Building materials
current prices
Normal building
3 bedroom, 3 stories
Cost comparison
up to basic structure
COMPARISON OF COST BETWEEN
PRESENT AND PROPOSED TECHNOLOGY
PRESENT TECHNOLOGY
NORMAL CONSTRUCTIONS(Basic structure)
A normal construction up to basic structure, 3 stories, involves:
A) Basic Materials
@ Rs 550per sq ft
B) Labor
@ Rs 150 per sq ft
C) Supervision, over heads
@ Rs 50 per sq ft
-------------------------------TOTAL
Rs 750 per sq ft
D) Cost overruns 10-15%
Considering 12 months ( normal time )
COST ESTIMATES
Rs 80 average
-------------------------Rs 830 per sq ft
COMPARISON OF COST BETWEEN
PRESENT AND PROPOSED TECHNOLOGY
PROPOSED TECHNOLOGY
NORMAL COSTRUCTION
A) basic materials
B) labor and supervision
Cost
cost over runs considering
max 20 days required up to
three stories basic structure
COST ESTIMATES
Rs 550
Rs 60
------------------------Rs 610 per sq ft
nil
Rs 610 per sq ft
Saving = Rs 830-Rs 610 =Rs 220/sft or 36%
ANA LYSIS OF SAVINGS FROM PROPOSED
TECHNOLOGY
Following factors result in savings for proposed technology as
compared to present technology
It is only labor , supervision and cost over runs which cause
difference in costs.
The more the time the more labor, supervision and cost over run
The more the activities the more the labor cost
PRESENT TECHNOLOGY
A) Labor
27%
B) supervision ,overheads
10%
C) Cost overrun (average)
11%
-----------------------------------TOTAL
48%
SAVINGS FROM PROPOSED TECHNOLOGY
PROPOSED TECHNOLOGY
A) Labor cost due to less activities
B) Supervision, over head savings
c) Cost overrun due to less time
SAVING 48-12
9%
3%
nil
--------------------TOTAL
12%
36%
THERE WILL BE FURTHER SAVING BECAUSE NO PLASTER IS REQUIRED
ON CONCRETE WALLS
THERE WILL BE MORE SAVING BECAUSE OF LESS THICKNESS REQUIRED
FOR R.C.C. WALLS AS COMPARED TO BRICK WALLS
THESE FACTORS HAVE NOT BEEN CONSIDERED AT THIS STAGE.
COMPARISON OF COST BETWEEN
PRESENT AND PROPOSED TECHNOLOGY
COST SAVINGS
36% SAVING IN OVERALL COST OF
CONSTRUCTIONS RESULTING FROM
^ labor
^ supervision
^ cost overrun
^ no plaster reqd
less thick ness of walls rqd
TIME SAVING
500 %
3-D Pie Chart
Cost overrun saving
11%
Time savings-500%
Supervision
Saving 10%
Labor&
No plaster
Saving 27%
PROJECTED COST SAVINGS FOR THE CONSTRUCTION
INDUSTRY WOLDWIDE (statistics for year 2010)
ASSUMPTIONS:
85 % of cement produced in the world goes for new
constructions
15% goes for repairs
90% of cement used for new constructions is used for
R.C.C.
50% of structural Steel being used at present world wide
as construction material for buildings, bridges and other
civil structures for faster Construction at 30% higher cost
than RCC will shift to RCC ,once our technology is
released ( because of cost and time reduction)
Total consumption of cement for year 2010 is ( 3294
million Tones)
PROJECTED COST SAVINGS FOR THE CONSTRUCTION
INDUSTRY WOLDWIDE
Total consumption of Steel for year 2010 world wide as 1257
million tones
Steel consumption for civil works as 50% of total consumption will
be 628 million tones or say 600 million tones
Considering 120 Million tones of steel used at present as building
materials at 30% higher cost for constructions will shift to RCC
once our technology is made public
Considering cost of cement as 40% of cost of RCC constructions
For mix of 1:2:4 (average mix) @ Rs 4500/cum (US$100 /cum)
Once our technology is made public, the use of brick work, block
&stone work etc will become obsolete (because of cost, time,
labor reduction & no requirement of plaster)
Considering 5% increase in volumes of construction every year till
Year 2020
COST OF CONSTRUCTIONS WORLDWIDE
(using costs in Indian rupee and converting in Dollar Terms)
(Cement prices have increased considerably since 2004)
CEMENT, CONCRETE, COARSE SAND + LABOR
Consumption of cement in year 2010
3294 million tones
say
3200 million tones
or
3200000000000 kg
CONSIDERING 6.4 BAGS or 320kg of cement will produce
1 cu.m of R.C.C. =3200000000000/320
: TOTAL CONCRETE
CU.M
10000000000 cu m
Cost of constructions
10000000000 cu mtr x Rs 4500 per cum Rs 45000000000000
or 4500000 crores
Or
(considering Rs 4500 crores as US$1 Billion
4500000 /4500
=US$1000 Billion
Taking 75% for new constructions
the cost of R.C.C
=US$750 Billion
COST OF CONSTRUCTIONS WORLDWIDE
(using costs in Indian rupee and converting in Dollar Terms)
STEEL CONSUMPTION in RCC work
Steel prices have increase dramatically in last 7 years from Rs 16 per kg to Rs
40 per kg now for plain and twisted bars used in RCC
Any project started five years before and not completed till now has seen
100% increase in steel prices.
Time factor plays a very vital role in construction industry.
Here under we are considering only normal saving while taking consumption of
average steel consumption.
10000000000 cum of RCC @60 Kg Per cum/average= 600000000000 kg
0r 50% of total world consumtion
= 600 million tones
Cost of steel used taking basic
cost at Rs 40000 per tone
+ Rs 2000 per tones as labor
+ Rs 1000 per tone as wastage etc
Cost of steel used
=600000000 tones x Rs 43000/tone=
Rs 25800000000000
or2580000cr/4500cr/billion
Or
US $Billion 573
Say US$570 billion
Taking 75% as new constructions the cost of steel used world wide will be
US$ 427.5 billion or say
US$ 430 Billion (B)
COST OF CONSTRUCTIONS WORLDWIDE
(using costs in Indian rupee and converting in Dollar Terms)
FORM WORK AND OTHER COSTS FOR
RCC
Taking 10% as cost of form work, over
head etc
COST OF FORM WORK OVER HEAD=
750+430 =1180/10 US$ 118 BILLION
Say
US$ 120 BILLION (C)
SAVING FOR PRESENT RCC CONSTRUCTIONS
WORLDWIDE
(using costs in Indian rupee and converting in Dollar Terms)
D) SAVING FOR RCC CONSTRUCTIONS 35%
of (A+B+C+D) or
Of US$ 750 +430+120 = US$ Billion 1300
Saving world wide=
36%of 1300Billion
= US$468 Billion
TOTAL SAVING TILL 2020
WITH 5% INCREASE YEAR AFTER YEAR
SAVING FOR YEAR 10-11
11-12
12-13
13-14
14-15
15-16
16-17
17-18
18-19
19-20
-
US $ Billion 468
US $ Billion 490
US $ Billion 515
US $ Billion 540
US $ Billion 567
US $ Billion 600
US $ Billion 630
US $ Billion 660
US $ Billion 693
US $ Billion 726
MARKETING STRATEGY
SUGGESTED
First of all we target big builders of all countries to sell
the technology as well as to issue licenses to use the
technology to get big chunk of money to begin with.
Second target could be one agency for each city of the
world who could be made sole distributor for each city
who in turn can appoint sub distributors for each locality
to issue licenses to small workshop.
It will be for that distributor to monitor violations as fixed
return can be fixed on each distributor.
For villages, we can fix district wise distributors for them
to take care of each village or town in that district
Marketing Diagram
PROPOSED MARKETING STRATEGY
Purchase/sale
Of technology
Issue of
licenses
Sole
distributorship
Monitor
piracy
BENEFITS TO ASSOCIATING COMPANY
There will be savings in construction cost to
Company associating, if the company is in
construction business
Company Associating with us will issue licenses
for a license fee for the use of this technology
Considering the size of construction business the
associating company can generate Billions by
marketing new construction technology and issuing
licenses
WHAT WE ARE LOOKING FROM YOU
We are looking for association with a company who
is willing to apply and/or carry out marketing of
our new Construction Technology and also give
out licenses world wide on a suitable financial
model
CONTACT
SURESH CHAWLA
B-1/411 JANAK PURI NEW DELHI-110058
91-11-29215758, 25503209
O9350248154,0 9810868151
FAX 91-11-25522933
EMAIL : [email protected]
www.sureshchawla.com