HMI01207

HMI/AIA Joint Science Operations Center (JSOC) Design

Phil Scherrer, Stanford University Jim Aloise, Stanford University Jerry Drake, LMSAL SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 1

Overview of HMI –AIA Joint Science Operations Center (JSOC)

Philip Scherrer

[email protected]

650-723-1504 • • •

HMI & AIA Institutional Roles Scope of JSOC Parts of JSOC, SU & LMSAL

JOC

– Joint Operations Center •

SDP

– Science Data Processing

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 2

HMI & AIA Institutional Roles

LWS Science SDO Science AIA Team HMI Team AIA Science Analysis E/PO HMI Science Analysis HMI & AIA JSOC AIA Instrument SAO LMSAL

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005

HMI Instrument Stanford

JSOC Design 10- 3

JSOC Scope

• • • •

The HMI/AIA Joint SOC consists of two parts:

– Science Data Processing (

SDP

) – at Stanford and LMSAL – Joint Operations Center (

JOC

) – at LMSAL

JSOC JOC includes:

– HMI and AIA Commanding and Health Monitoring – HMI and AIA Engineering support as needed

JSOC SDP includes:

– HMI and AIA Telemetry Data capture (from DDS) and archive – HMI and AIA Level-0 processing and archive – HMI processing through to level-2 with archiving of end products – AIA processing through level-1a with online archive at

Stanford

– AIA level-2 processing at

LMSAL

– Data export of the above and other HMI and AIA products as needed

JSOC does not include tasks such as:

– Science analysis beyond level-2 products – HMI and AIA EPO – HMI & AIA Co-I science support

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 4

HMI & AIA JSOC Architecture

White Sands DDS Redundant Data Capture System GSFC MOC Stanford JSOC Pipeline Processing System HMI/AIA

Level-0, 1, HMI-level2

30-Day Archive Primary Archive Catalog High-Level Data Import Offsite Archiv e Offline Archiv e

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005

Data Export & Web Service LMSAL HMI & AIA Operations Quicklook Viewing House keeping Database Local Archive AIA Analysis System World Science Team Forecast Centers EPO Public

JSOC Design 10- 5

HMI/AIA Joint Science Operations Center (JSOC) Science Data Processing (SDP)

Jim Aloise, Stanford University SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 6

JSOC SDP Agenda

Significant Level 4 requirements

SDP Architecture

SDP Network Design & Security

Test approach

Implementation plan

Configuration Management and Control

Trade Studies and Prototyping Efforts since PDR

Risks & Mitigations SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 7

DMR – JSOC SDP Requirements

8000.2.4 Science Data Processing, Archiving and Distribution

Each SOC shall provide the necessary facility, software, hardware and staff to receive, process, archive and distribute the science data generated by its instruments.

My Documents\DMR_SOC_Req.ppt

JSOC Design 10- 8 SDO Ground System Critical Design Review (CDR) – May 11-12, 2005

SDP

JSOC (Stanford Science Data Processing) Configuration

DDS CISCOS YSTE MS Switch Datacapture System Switch ethernet CISC OS YSTEMS Pipeine Processing File Server Data Base Server Analysis Cluster Active Server heartbeat Passive Server Fibre Channel Switch Disk arrays [etc.] ID C Disks Tape Robot Pipeline Processor LAN Tape Robot jim\My Documents\hardware_config3.vsd

JSOC Design 10- 9 SDO Ground System Critical Design Review (CDR) – May 11-12, 2005

Telemetry Data Archive

• • • • • • • •

Telemetry data is archived twice The Data Capture System archives tlm files for offsite storage Archive tapes are shipped to the offsite location and verified for reading A feedback mechanism will be established to ack the SDP that a tape is verified or that another copy needs to be sent The Data Capture System copies tlm files to the Pipeline Processing System The Pipeline Processing System archives tlm data for local storage and acks the SDP when it is successful Only when the SDP has received positive acks on both archive copies does it inform the Data Capture System to include the tlm file in the .arc file to the DDS, who is now free to remove the file from its tracking logic The lev0 data on the Pipeline Processing System is also archived SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 10

DDS

JSOC Data Capture System Components

lev0 “module” Operator FTP Disks GUI

Data Capture Interface Utility Libraries Record Cache

Processing History Log DRMS

Data Record Management System

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 Database Server Primary Storage Disks SUMS

Storage Unit Management System

Tape Drive JSOC Design 10- 11

JSOC Pipeline Processing System Components

Pipeline Operato r PUI

Pipeline User Interface

Pipeline processing plan Processing script, “mapfile”

List of pipeline modules with needed datasets for input, output

Pipeline Program, “module”

JSOC Science Libraries Utility Libraries Record Manage ment DRMS Library Keyword Access Link Manage ment Data Access Record Cache

SUMS Disks SUMS

Storage Unit Management System

Processing History Log DRMS

Data Record Management System

SUMS Tape Farm Database Server SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 12

Storage Unit Management System (SUMS) API

• • • • • • •

SUM *SUM_open(char *dbname) Start a session with the SUMS int SUM_close(SUM *sum) End a session with the SUMS int SUM_alloc(SUM *sum) Allocate a storage unit on the disks int SUM_get(SUM *sum) Get the requested storage units int SUM_put(SUM *sum) Put a previously allocated storage unit int SUM_poll(SUM *sum) Check if a previous request is complete int SUM_wait(SUM *sum) Wait until previous request is complete SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 13

Data Record Management System (DRMS) Logical Data Organization

JSOC Data Series

hmi_lev0_cam1_fg aia_lev0_cont1700 hmi_lev1_fd_M hmi_lev1_fd_V aia_lev0_FE171

Data records for series hmi_fd_V

hmi_lev1_fd_V

#

12345 hmi_lev1_fd_V

#

12346 hmi_lev1_fd_V

#

12347 hmi_lev1_fd_V

#

12348 hmi_lev1_fd_V

#

12349 hmi_lev1_fd_V

#

12350 hmi_lev1_fd_V

#

12351 hmi_lev1_fd_V

#

12352 hmi_lev1_fd_V

#

12353

Storage Unit = Directory Single

hmi_fd_V data

record

Keywords

:

RECORDNUM = 12345 # Unique serial number SERIESNUM = 5531704 # Slots since epoch.

T_OBS = ‘2009.01.05_23:22:40_TAI’ DATAMIN = -2.537730543544E+03 DATAMAX = 1.935749511719E+03 ...

P_ANGLE = LINK:ORBIT,KEYWORD:SOLAR_P …

Links:

ORBIT = hmi_lev0_orbit, SERIESNUM = 221268160 CALTABLE = hmi_lev0_dopcal, RECORDNUM = 7 L1 = hmi_lev0_cam1_fg, RECORDNUM = 42345232 R1 = hmi_lev0_cam1_fg, RECORDNUM = 42345233 …

Data Segments:

Velocity =

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 14

S/W Configuration Items

• • • • • • • • • •

Storage Unit Management System (SUMS) Data Record Management System (DRMS) Pipeline User Interface (PUI) Event Manager Science Libs Pipeline Utility Libs Lev0 Module Lev1 Module Standard Products Modules Export Support SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 15

H/W Configuration

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 16

H/W Configuration (cont)

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 17

JSOC Data Export System

Researcher B Space Weather Script Access Researcher A General Public VSO – Virtual Solar Observatory DRMS – Data Record Mgmt Sys

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005

Grid VSO CoSEC Grid Adaptor VSO Adaptor CoSEC Adaptor API Keywords Range Overview New/Avail Statistics Selecte d Data Records Format Custom Keywords Utilities DRMS

JSOC Design 10- 18

Performance Analysis

AIA/HMI combined data volume

– read + write – quick look + final – one reprocessing – 25% duty cycle • •

NFS over gigabit ethernet (50-100MB/s/channel)

– 4 – 8 channels per server, 5 servers (today)

SAIT-1 native transfer rate (25-30 MB/s/drive)

– 10 SAIT-1 drives per library, 2 libraries (today)

2 PB/yr = 60 MB/s

x 2 x 2 x 2 x 4

2 GB/s (disk) 0.5 GB/s (tape) 1 – 4 GB/s 0.5 – 0.6 GB/s SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 19

Heritage

MDI ground system design and implementation

MDI production processing for 9+ years

MDI sustaining engineering for h/w and s/w upgrades

MDI “lessons learned” folded into JSOC SDP design SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 20

DDS

Stanford/Lockheed Connections

Stanford

MOC

Front End Firewall LMSAL CMD Display Pipeline JSOC Disk array Router Firewall 1 Gb Private line Sci W/S Router Firewall JSOC Disk array

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005

Router Firewall NASA AMES Router Pipeline LMSAL W/S Router “White” Net Firewall

JSOC Design 10- 21

World

Test Approach

Telemetry data is simulated with MDI data packaged in SDO VCDUs

Various telemetry pathologies can be created to validate telemetry processing

The DDS is simulated by packaging the VCDUs into files and injecting them into the SOC front end using the DDS/SOC protocol

The lev0 processing is validated by comparing input and output images

Timing analysis and throughput studies will be performed to evaluate h/w and s/w tradeoffs

Instrument sunlight tests will be used to validate the lev1 processing

Each s/w library and subsystem has a regression test suite that is run to verify each new CM release

Full end to end testing is accomplished via the mission I&T plan SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 22

Development & Test Plans and Procurement Schedule

• • • • • • • •

HMI and AIA Data EGSE installed

– Prototype for I/F testing with GS – Version 2 to support flight inst.

Mar, 2005 onward June 2005

JSOC Capture System

– Purchase computers – Support DDS testing – Final system installed Summer 2006 Fall 2006 Spring 2007

JSOC SDP Infrastructure, SUMS, DRMS, PUI

– Prototype testing of core system – Fully functional June 2005 Dec, 2005

Purchase computers for JSOC Infrastructure Operational Integration with DDS Data Product Modules

Jan, 2007 March, 2007 March-June , 2007 Jan, 2008

During Phase-E

- Add media and disk farm capacity in staged plan, half-year or yearly increments - First two years of mission continue Co-I pipeline testing support

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 23

Configuration Management & Control

• • • • •

Capture System

– Managed by JSOC CCB – Controlled in CVS

SUMS, DRMS, PUI, etc. Infrastructure

– Managed by JSOC CCB after launch – Controlled in CVS

PUI Processing Tables

– Managed by HMI and/or AIA Instrument Scientist – Controlled in CVS

Level 0,1 Pipeline Modules

– Managed by HMI and/or AIA Instrument Scientist – Controlled in CVS

Science Analysis Pipeline Modules

– Managed by program author – Controlled in CVS

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 24

CM with CVS

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 25

Prototype/Trade Studies Since PDR

“MDI Heritage” software for EGSE Science W/S (currently running)

Study to separate keywords from image data in a keyword Database

MDI database optimization study

MDI internal data set representation study

Storage management trade study (commercial HSM vs. MDI heritage)

Archive media study to replace MDI Ampex robotic units

Storage Area Network (SAN) / Network Attached Storage (NAS) trade study

Location of offsite media storage SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 26

Risks and Mitigations

Physical location of JSOC Tracking through Stanford Management - Rent space off-campus

Cost risk in assumed rate of computer technology development - Advances already made

Database Performance - Prototyping underway - Design alternatives - Higher performance equipment SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 27

HMI/AIA Joint Science Operations Center (JSOC) Joint Operations Center (JOC) Jerry Drake, LMSAL

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 28

Joint Operations Center (JOC) Agenda

• • • • • • • • • • • •

Significant Level 4 Requirements HMI & AIA JOC Architecture

– Hardware Configuration Items (HWCIs) – Software Configuration Items (SWCIs) – Heritage

Network Design and Security Test Approach Implementation Plan/Sustaining Support Configuration Management (CM) Trade Studies and Prototyping Efforts since PDR Risks & Mitigations Procurement Status Integrated Schedule Risks & Mitigations Issues & Concerns SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 29

JOC Requirements Sources

• • • • • • • • • •

464-GS-REQ-0005, Detailed Mission Requirements (DMR) for SDO Mission 464-SYS-REQ-0004, Mission Requirements Document 464-GS-ICD-0001, MOC-SOC ICD 464-HMI-ICD-0002, Spacecraft to HMI Interface Control Document464-AIA-ICD-0011, Spacecraft to AIA Interface Control Document NPR 2810, NASA Security Procedures and Guidelines 464-GS-PLAN-0041, SDO Flight Operations Plan (FOP) 464-GS-PLAN-0042, SDO Database Format Control Document 464-GS-LEGL-0040, Operations Agreement (OA) between the SDO MOC and the HMI SOC 464-GS-LEGL-0041, Operations Agreement (OA) between the SDO MOC and the AIA SOC 464-GS-PLAN-0010, Operations Concept Document SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 30

Significant Level 4 Requirements

• • • • • • •

The following significant level 4 requirements are from 464-GS-REQ-0005, Detailed Mission Requirements (DMR) for SDO Mission 8000.2.1, Instrument Nominal Operations

– Each SOC shall provide the necessary facility, software, hardware and staff to operate their instruments and ensure their health and safety.

8000.3, Security

– Each SOC shall comply with NASA security requirements commensurate with a science operations facility as documented under NPG 2810.1 and its successors. This includes information technology (IT) security for communications with the MOC and DDS, as well as physical security at the SOC facilities.

8100, SOC Instrument Operations

– Each SOC shall operate their respective instruments and be responsible for health and safety monitoring, science planning, and command generation.

8101, Health and Safety Monitoring

– Each SOC shall monitor the health and safety of their instruments and be responsive to anomaly conditions 24 hours a day, 7 days a week.

8103.5, Flight Software Maintenance

– Each SOC is responsible for maintaining the flight software resident on their instrument’s on-board processor. Instrument flight software updates shall be coordinated with the MOC and the other instrument teams.

8200, SOC Interface Requirements

– Each SOC shall have two interfaces with the rest of the SDO ground system: the MOC at GSFC, documented in the

MOC-to-SOC ICD

, and the DDS at WSC, documented in the

DDS-to-SOC ICD

.

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 31

White Sands DDS

JSOC Architecture

GSFC MOC Stanford JSOC Pipeline Processing System HMI/AIA

Level-0, 1, HMI-level2

Redundant Data Capture System 30-Day Archive Primary Archive Catalog Offsite Archiv e Offline Archiv e

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005

Data Export & Web Service High-Level Data Import HMI & AIA Operations Quicklook Viewing House keeping Database Local Archive LMSAL AIA Analysis System World Science Team Forecast Centers EPO Public

JSOC Design 10- 32

Operations HW Architecture

Dedicated T1/FT1 Lines (redundant pair) LMSAL (Room in B. 252

)

HMIOPS1 (Sun) HMIOPS2 (Sun)

HMI LMSAL EGSE SPARE EGSE

AIAOPS1 (Sun) AIAOPS2 (Sun)

AIA LMSAL EGSE HMIQL QL image display Planning Analysis DDS OC3 Lines

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005

HMI & AIA Web Server (PC or Sun) AIAQL QL image display Planning Analysis External network Cmd logs Tlm RT HK PBK HK Stanford University SDP QL image production

HMIOPS3 LMSAL EGSE AIAOPS3 LMSAL EGSE JSOC Design 10- 33

LMSAL EGSE Configuration LMSAL EGSE

SunFire Workstation HMIOPS1 SW

Core EIP Database STOL procedures

Utilities Analysis

LMSAL EGSE

SunFire Workstation HMIOPS2 SW Core EIP Database STOL procedures

Utilities Analysis

SDO Spacecraft Dedicated T1 Communications Line (redundant pair) SDO Ground System Critical Design Review (CDR) – May 11-12, 2005

MOC

JSOC Design 10- 34

FSW Maintenance HW Configuration

HMI AIA A B Instr Side HMI SW Development System Software test backplane S/C I/F bd (1553) HMI EDU processor UART bus coupler 1553 Etherlite Lab power supplies Ethernet SW Development (UART port) Sun – hmifsw1

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005

1553 Bus Monitor (PC/w 1553 bd) hmipc

SSIM (from NASA )

ASIST (PC) NTGSE (PC) HSB (PC) Ethernet LMSAL/Stanford EGSE Cmds Tlm Images STOL Archives

JSOC Design 10- 35

Hardware Configuration Items

• •

Operations Hardware

– LMSAL EGSE composed of sets of two Sun workstations running Solaris • • Three sets at LMSAL (HMIOPS, AIAOPS and SPAREOPS) One set at Stanford (HMIOPS3 and AIAOPS3) • One set at MOC (GSFC) – Both connect through sockets to the MOC • Socket interface implemented – – LMSAL EGSE Spacecraft Simulator (SSIM) provided by NASA SDO Project – – One Sun workstation (primary) used for commanding and real-time telemetry The other Sun workstation is used for • • • Playback and Level-0 24 hour telemetry from MOC Backup for the primary MOC command and real-time telemetry connection Quick-look analysis of housekeeping data – Two Suns (for Quick Look image display) and one PC (for web server)

Flight Software (FSW) Maintenance Hardware

– – – Software development Sun workstation LMSAL EGSE Sun workstation Spacecraft Simulator (SSIM) provided by NASA – – – Software development backplane (containing EDU processor and PCI/Bridge board) Power supplies for backplane 1553 bus monitor PC

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 36

LMSAL EGSE Software

• •

Core code

– Command processor – Telemetry processor • Screen displays – Event handling • • Logging Screen displays – Limit checking – STOL processor • STOL (Special Test and Operations Language)

Experiment Interface Program (EIP)

– Unique to each program at LMSAL – Contains socket communications protocol – Instrument-specific command information from database used here – Will add functionality to contact (by page or phone) personnel in case of a limit exceedance (from the Limit Check module) or certain events as identifed by the Event module • • Tiered calling protocol Everyone on list called soon (within 30 minutes) if no response to pages or phone call drags out

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 37

Software Configuration Items (1 of 2)

• •

LMSAL EGSE

– Core code • • • • • Command processor Telemetry processor Event handling Limit checking STOL processor – Experiment Interface Program (EIP) • • • • Unique to each program at LMSAL Instrument-specific command information from database used here Contains MOC socket communications protocol Automatic Notification System contained in EIP

Flight Software

– SUROM – KERNEL (OS plus basic cmd & tlm architecture) – HMI FSW – AIA FSW – Tornado (WindRiver development system) – Green Hills Multi development environment

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 38

Software Configuration Items (2 of 2)

• • • • • • •

Spacecraft Simulator (SSIM)

– NTGSE (HSB and 1553 communications) – ASIST

Command & Telemetry Database

– Database Tools (programs) – Database Files

STOL Procedures (run on LMSAL EGSE) Ground Utility Tools

– Binary load generation tools convert object modules or tables into binary upload format – Database tools control command and telemetry database

Analysis Tools

– IDL programs – Trending programs

Planning Tools Software Simulator

– Needed to check out observing sequences before use on-orbit

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 39

Process Management

PROC _MGR Daemon, always running

Core EIP

EGSE

Supervisor

Spawn once and manage, watchdog on unexpected process exit CMD_ CON STOL_ COMP STOL_ EXEC Spawn (and respawn if needed) and manage, watchdog on unexpected process exit EVENT _MGR SDO_OPS_TM SDO_OPS_TC TM_MGR LIMIT_MON Spawn once and manage, watchdog on unexpected process exit SCREEN Multiple copies started by user SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 40

Run-time Database Creation

ASCII Database File EGSE parameters, Telemetry Decomutation Table, Analog Polynomial Conversion Table Digital to String Conversion Table Limit Set Definition Table Telecommand Definition Table Read Create PROC_MGR

Core EIP

Run-time Database Read Only Attachment Each process shall be attached with either read only or read/write access as appropriate for the process User starts the proc_mgr daemon SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 Read/Write Attachment JSOC Design 10- 41

Telemetry Subsystem Data Flow

Event_mgr Shared Memory Partition

Core

Telemetry Decomutation Table, Analog Polynomial Conversion Table Digital to String Conversion Table Limit Set Definition Table

EIP

Snapshot File Limit Events Snapshot Command EGSE Events Screen (GUI) Raw/Engr.

TM Data, Limit Status TM_MGR Engr. Conv. & Limit Checking CCSDS Telemetry Packets SDO_OPS_TM Raw Telemetry Files SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 S/C SIM (NTGSE) CCSDS Telemetry Packets JSOC Design 10- 42

Command Subsystem Data Flow

EGSE Console GUI EVENT_MGR

Core EIP

Shared Memory Partition STOL and Instrument Commands Command Execution Events Telecommand Definition Table Single Cmd STOL_COMP STOL_EXEC File Cmds STOL source Cmd File Write STOL Executable Cmd File SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 Instrument Commands Instrument Command Ack.

SDO_OPS_TC EGSE Events Instrument Commands ASIST Instrument Command Ack.

JSOC Design 10- 43

Heritage

• • • • •

Initially used on MDI and still in use for orbital operations Adopted for TRACE and still in use for orbital operations

– Suggest visit to SOHO and TRACE EOFs at GSFC (Bldg. 14)

Upgraded version currently used on Solar-B FPP and SXI

– FPP is in instrument I&T; SXI is at Observatory I&T

Will be used on both HMI & AIA with the following differences due to command and telemetry mnemonics

– Databases – STOL procedures – Displays

Software has evolved over more than a a decade as an LMSAL resource SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 44

Code Reuse

Name of code EIP Core Percent reuse 95 90 Percent complete 99 95* * Automatic Notification System yet to be added SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 45

Network Design and Security

• • • • • • • •

Computers used for commanding (2, one for HMI and one for AIA)

– – Only one socket per instrument for commanding Only network connection is to dedicated line with MOC (“air-gapped”)

Operations equipment in room in B. 252

– – B. 252 is card-key controlled Room containing SDO Operations cypher-lock controlled (if necessary)

Each user must have an individual account Operations computers must be:

– – – Access controlled (proper password length) Logging Assigned System Administrators

Requirements on all personnel using systems connected to the SDO network for commanding

– National Agency Check (NAC) Takes 7 – 12 months to complete

Requirements on all personnel using systems connected to the NASA networks

– Annual NASA security training required (1 –2 hours)

Requirements currently under review NASA security to visit LMSAL and Stanford in the next few months to review the HMI and AIA security SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 46

Test Approach

• • • •

Test Approach

– Run LMSAL EGSE Acceptance Test procedure – Update Acceptance Test Procedure if new functionality added or additional unknown problems discovered and fixed – Run with Spacecraft Simulator (SSIM) provided by SDO Project – Run with spacecraft I&T system (interfaces are to be identical to the maximum extent practical)

Tests in I&T and with MOC as called for in SDO Ground System schedule

– Details in Integrated Schedule

LMSAL EGSE in use

– Used during instrument development for both hardware and software • • • • Brassboard instruments Flight instruments Spacecraft I&T On-orbit operation – LMSAL EGSE same for HMI & AIA except: • • Command and telemetry database files (different mnemonics) Instrument specific display pages

Flight Software Development system

– Currently in use for flight software development – Five copies will exist (3 currently): 2 for brassboard, 2 for flight, 1 for software development

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 47

Implementation Plan/Sustaining Support

• •

Implementation plan

– Purchase pairs of Sun workstations at the appropriate times in the future (start process of screening 2.5 months before need date) – Install current version of LMSAL EGSE and databases – Acceptance Test LMSAL EGSE

Sustaining Support

– Organizations Providing Support • • LMSAL Department ADBS All software maintenance support provided by LMSAL personnel • Flight software and ground tools – Documented – Developers available for maintenance if necessary – Types of Support • Software – LMSAL EGSE • LMSAL EGSE is maintained long-term due to multi-mission usage – Flight Software • Hardware – LMSAL EGSE • Hardware support under warranty or contract – Flight Software development system

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 48

Deliverables – HW/SW/Documentation

• • •

Hardware

– LMSAL EGSE (Sun computers) – PC

Software

– LMSAL EGSE

Documentation

– LMSAL EGSE User’s Guide – LMSAL EGSE SDO Experiment Interface User’s Guide – HMI Flight Software User’s Guide – AIA Flight Software User’s Guide – User’s Guide for each ground tool DEP0304 HMI01131 2H00782 2T00175

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 49

Configuration Management (CM)

• • • • •

Flight Software

– Managed by HMI and/or AIA CCB respectively – Controlled in CVS (Concurrent Version System)

LMSAL EGSE

– Managed by HMI and/or AIA CCB and LMSAL departmental CCB respectively – Controlled in SCCS (Source Code Control System)

Ground Tools

– Managed by HMI and/or AIA CCB respectively – Controlled in CVS

Database

– Managed by HMI and/or AIA CCB respectively – Controlled in CVS – Version number in telemetry

Tables

– Managed by HMI and/or AIA CCB respectively – Controlled in CVS – Keep track of flight software configuration – Directory dumps of RAM and EEPROM provide verification of currently loaded software

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 50

Trade Studies & Prototyping Efforts Since PDR

• • • •

No trade studies related to JOC Prototyping consists of deploying operational LMSAL EGSE and flight software systems Previous presentations (reviews)

– Mission Operations Peer Review 2004-02-05 – SDO Ground Systems PDR • • Instrument Operations Concept Telemetry & Control Design 2004-04-21 2004-04-22 – HMI/AIA SOC Design Walkthrough 2004-09-09 • • EGSE Limit Checking Automated Notification System – HMI CDR 2004-11-15 – AIA CDR – JSOC Peer Review 2005-02-16, 17 2005-03-17 HMI00560 HMI00643 HMI00644 AIA01037 HMI00928 HMI01086

No changes to report (other than continued lower-level detailed development) SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 51

Procurement Status

Procurement Schedule

– Purchase Suns for flight LMSAL EGSE systems – Purchase Suns for MOC testing (SPAREOPS1 & 2) – Purchase Sun workstations for flight • • HMIOPS1 & 2 AIAOPS1 & 2 – Purchase Suns & PC for Quick Look/web page in JOC June 2005 July 2006 October 2006 October 2006 October 2006

SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 52

Integrated Schedule

• • • • • •

Spacecraft Simulators (SSIM)

– – – HMI & AIA SSIMs #1 delivered HMI SSIM #2 – July 2005 AIA SSIM #2 – August 2005

Develop Automatic Notification System Real-Time Low-Rate Data Line installation HMI

– October 2006 • HK Telemetry & Telemetry Database – November 2006 • • • • HMI Commanding & Command Database HMI FDS Products HMI Mission Support Products HMI Special Procedures (Definition)

AIA

– – November 2006 • HK Telemetry & Telemetry Database December 2006 • • • • HMI Commanding & Command Database HMI FDS Products HMI Mission Support Products HMI Special Procedures (Definition)

Combined SOC-MOC Test (all SOCs) SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 November 2005 December 2005 January 2007 JSOC Design 10- 53

Risks and Mitigations/Issues & Concerns

• •

No known risks No issues or concerns SDO Ground System Critical Design Review (CDR) – May 11-12, 2005 JSOC Design 10- 54