PROJECT UPDATES
Presented by:
Facilities Services
Management
Vangstad
• Update from the last month:
– Sheetrock is 90% complete in the basement.
– The rain leader on the roof is still hooked up so it is causing
us to get water in the mechanical room. Ron is working with
the contractor to find a solution to this issue.
– Air handler was delivered and has been installed.
– The windows have been delivered and installation will start
this week.
– Completion date was discussed today and the architect will
send out a new schedule soon.
City Flood Protection Project
– Re-routed the 12” water main by the walk
bridge.
– Moved the Century Link line that was in the way.
– Poured the foundation and the walls for the
pump station on the east end of College Street.
– Next week they will be digging the foundation for
the flood wall going west on College Street.
Heat Plant Replacement
– The RFQ for Construction Manager has been
sent out and bid opening will be July 7th. Would
like to interview on July 14th.
– ONE has started working on demo plans for the
Power House.
– We are still working on land buy-outs to see
what we can obtain for the new plant site.
Wellness Center
– There was a ground-breaking on 6/3 at 10am.
– Strata has removed asphalt all the way to the
shop. They will be replacing this with a new road
when the project is completed.
– The force main was installed last week during
the middle of the night. It only take 4-6 hours to
complete.
Other Projects
• President’s House Retaining Wall & McFarland 1st Floor Stabilization
– We have received a bid, hoping to get at least one more before making a
decision on how to move forward.
• Field House Addition
– Continue working with architect, mechanical, and electrical engineers to get
construction plans put together to get the project out to bid.
• SEGS Office Remodel
– Project is underway.
• Student Center Upper Lounge
– We have requested spec drawings from the architect so we can put the project
out to bid.
• McFarland 411
– Watch for emails from Pat concerning updated timeline.
• Graichen Gym Floor
– Project was delayed and began TODAY.
FACILITIES SERVICES
DEPARTMENT MEETING
FS ANCHOR AWARD
PRESENTATION:
JANET GIERKE
Presented by:
Selection Committee
“Janet has and is working very
hard to make significant
improvements to the overall
appearance of the Student
Center. Janet is cooperative
and willing to do what it takes
to make her work area look
great, giving any visitor to the
Student Center a positive first
impression. Janet is ready and
willing to make additional long
lasting improvements this
summer which will only
increase the WOW factor at the
Student Center.”
FACILITIES SERVICES
DEPARTMENT MEETING
VACANCIES/HIRES/DEPARTURES
New Hire: Heat Plant Operator- Dallas Schmidt
New Hire: Building Services (temp. Rhoades)- Daniel Eppen
Transfer: Building Services (Rhoades)- Dave Gazeley
(Previously worked as a Heat Plant Operator)
FACILITIES SERVICES
DEPARTMENT MEETING
IMPORTANT DATES
June 26: New Student Orientation
June 29-July 2: Softball Camp
July 8-9: LOS Camp (Football)
July 16-17: Volleyball Camp
July 20-23: Volleyball Camp
July 25: Volleyball Camp
August 5, 10, 12, 14, 18: Viking Preview
August 6-8: Church Camp
August 21-23: Welcome Weekend
August 24: Fall Semester Begins
FACILITIES SERVICES
DEPARTMENT MEETING
STAFF SENATE:
FACILITIES SERVICES OPENING
FACILITIES SERVICES
DEPARTMENT MEETING
MEMBER TOPICS/QUESTIONS