KUWAIT NATIONAL PETROLEUM COMPANY 1 Commercial Department Speaker : Naser Al-Thaqeb Position : Team Leader, Commercial Support - PD 2 Kuwait Oil Company (KOC) Kuwait Gulf Oil Company (KGOC) Petrochemical Industries Company (PIC) Kuwait Petroleum International (Q 8) Kuwait Foreign Petroleum Exploration Company (KFPEC) Kuwait Oil Tankers Company (KOTC) Kuwait Aviation Fuelling Company (KAFCO) Kuwait National Petroleum Company (KNPC) 3 KNPC Core Business Producing & Distributing High quality Refined Oil Products to Local & International Markets. 4 Production and Location Refining Capacity: 465,000 bpd MAA Refining Capacity: 195,000 bpd SHU Refining Capacity: 270,000 bpd MAB Expected Refining Capacity: 615,000 bpd NRP 5 Aim at providing clean fuel to power plants. Approved Korean Vendors and Contractors Indexes at KNPC.com (products/(VEC/CEC) 12 Contractors. 114 Manufactures. 6 Mandatory Requirements Vendor Contractor Minimum three years market experience (that material supplied to Oil and Petrochemical industries). Minimum three years experience (that contracts executed in Oil and Petrochemical industries). CTC card for Civil Works, Road & Dyke works , HVAC and Low Tension Cable laying work. ISO 9001 Certificate Registered as a Manufacturer. ISO 9001/14000 Type of work clarified. 3 years financial reports along with auditor statement. 3 years financial reports. Company License from Ministry of Commerce & Industry. CTC card for the current year. KCC registration for the year. Application fee KD 25/- for each product class: Application fee KD 25/- for each type of work: Account Name: Kuwait National Petroleum Company Bank Name: National Bank of Kuwait, Branch: Head Office. A/C No. 000 324523 01 01 Swift Code: NBOKKWKW Account Name: Kuwait National Petroleum Company Bank Name: National Bank of Kuwait, Branch: Head Office. A/C No. 000 324523 01 01 Swift Code: NBOKKWKW 7 COMMON 1 GENERAL FINANCIAL STRUCTURE OF QUESTIONNAIRES FOR C. & V. E SHEMS (M) ANNEXES TECHNICAL 2 ANNEXES 8 General Section 1 M Structure and Organization Scope of Services 2 3 M References Resources Personnel 4 GENERAL QUESTIONNAIRE 5 M/P Resources Equipmt. & Facilities 6 Procurement & Contracting 7 Project Management Systems 9 PQ Process (overall cycle time 1 Month) PQ application available in KNPC web site Company submit application to VEC/CEC office VEC/CEC to ensure all mandatory documents are attached No Inform to the applicant Return to the applicant to attach necessary documents for review Yes Prepare necessary approvals/ not recommended faxes Register in VEC/CEC Records Send the documents to the Pool of Experts for review ( CEC files < 1 million Categories) Clarfication required > 1 Million Categories Files Yes Review by Special Committee Obtain required information from the applicant Yes VEC/CEC Committee approval No No Review by Pool of Expert No VEC/CEC to arrange/ submit necessary details Additional information required Yes Recommended/ Not Recommended 10 Vendor/Contractor Registration Mandatory Information/Documentation: Application/Annexures/Catalogues. ISO Certificate (manufacturing facility/Contractors) Track reference (experience with oil industry) 3 yrs Financial Reports. Certificates and attestations. Others. 11 12 13 14 15 Commercial Web Page ( CWP) E-tendering (http://www.knpc.com/commercial/ ) Web page enables bidders to submit the tenders online. The web page is integrated with Company’s business process application (Maximo). 16 E-tendering CTC tenders: for information. Limited tenders: CWP generates invitation emails to bidders. Also: reminding emails, announcements and extension of closing date. Bidder corresponds online (clarifications / query). View only is possible W/O logging in. 17 Registration ONLINE Temporary ID for viewing. V/CEC registration (ID) is adequate. Separate ID can be collected from CWP help desk. Bidder would be requested to be present to verify the attachments. Password collected personally. [email protected]: Temporary code/ask permanent code/attach article of morarandum ()عقد التأسيس/ company liscence/CTC registration card/KCC registration card/K.manpower %/Registrars of companies/ISO 9001. Non V/CEC Temporary code Registration (3 steps). 18 19 20 21 Bidding ONLINE 22 ‘Click’ here 23 PRINT this page for your Records. 24 END. Note: You can Resubmit or Withdraw your BID until Closing Date. 25 KNPC New Refinery Project 26 NEW REFINERY PROJECT (NRP) World’s Largest Grass-Roots Refinery Project: 7.5 Million M2 site located at Al-Zour 615 KBPSD crude processing capacity Processes Kuwait’s export, medium and heavy grade crude‘s Project Objectives: Improves the environmental condition of the country Produces 225 KBPSD low sulfur fuel oil for meeting the growing demand of LSFO needed for power generation Economical and Strategic outlet for a good portion of Kuwaiti Heavy Crude's Provides 340 KBPSD of export products. (ULS diesel, ULS kerosene, petrochemical naphtha and LPG) Fully operational March 2012 27 NRP will significantly reduce Emissions from Power Plants in Kuwait 28 MAIN NRP UNITS Atmospheric Crude Distillation Unit Atmospheric Residue Desulfuriztion Unit Diesel Hydrotreater Unit (CDU) 3 x (205,000 BPSD) (ARDS) 3 x (110,000 BPSD) (DHT) 3 x (62,000 BPSD) Naphtha Hydrotreater Unit (NHTU) 2 x (18,200 BPSD) Kerosene Hydrotreater Unit (KHTU) 2 x (53,000 BPSD) (SGU) 2 x (10,000 BPSD) (TGTU/SRU) 3 x (1,000 MTPD) Saturated Gas Unit Sulfur Recovery Hydrogen Production Units (HPU) Amine Regeneration Unit (ARU) 3 x (1300 M3/Hr)) (SWSU) 3 x (450 M3/Hr)) Sour Water Stripper Utilities & Offsites / Tank Farm 4 x (145MM SCFD) 90 TANKS Marine Terminal SOLIDS & LIQUIDS EXPORT 29 EQUIPMENT Equipment No. Reactors 75 Towers 99 Vessels 516 Storage Tanks 90 S/T Heat Exchangers 644 Breechlock Type Heat Exchangers 52 Air cooled Exchangers 468 Heaters 27 Boilers 6 Flares 5 30 EQUIPMENT Equipment No. Pumps 797 Compressors 60 Cooling Tower 1 Electrical Substations 39 HMI Stations 15 FAR & Rack Rooms 38 Process Analyzer Houses 35 CEMS Analyzer Houses 18 31 NRP- Major challenges World’s largest single refinery being located close to desalination plant & recreational area requiring adoption of highest safety / health & environment standards Very high sulfur Crude’s (4 -5 %) considered for processing Large numbers of high pressure reactors and vessels required for the project Very busy situation for Engineering & Construction Companies Size of the project in terms of scope of work and value of the project being very large, necessitated dividing the project scope among multiple EPC contractors Successful interface management between all EPC Contractors 32 CLEAN FUEL PROJECT 2020 33 Description & Objectives To remain competitive in the hydrocarbon industry Value addition, Efficiency, Reliability To produce high quality products while maintaining safe and environment friendly operations To meet social responsibilities 34 Introduction - CFP Site Location MAA SHU MAB 35 Description & Objectives Description Current Crude Capacity (PBSD) Delta Capacity (BPSD) 466,000 CFP New Crude Capacity (PBSD) 346,000 MAA Refinery MAB Refinery 270,000 454,000 184,000 SHU Refinery 200,000 0 200,000 Total 936,000 800,000 136,000 36 120,000 Equipment Equipment No. Package Equipment 216 Columns 73 Heat Exchangers 460 Fired Heater 40 Compressor / Fans 64 Steam Turbine 17 Desuperheater 29 Ejector 17 37 Equipment Equipment No. Pumps 501 Reactor 66 Tanks 84 Vessels 405 Mixers 37 Electrical Substations 48 FAR 43 38 CFP Major Challenges One of the world’s largest refinery expansion / modernization project. Work in close coordination within existing Refinery premises. Large numbers of high pressure reactors and vessels required for the project. High demand on EPC contractors Large Size of the project in terms of scope of work and value of the project necessitated dividing the project scope into three packages. Successful interface management between all EPC Contractors and Refineries. 39 40