UPS 1 - CSF ELEKTRO sro

Download Report

Transcript UPS 1 - CSF ELEKTRO sro

Power Quality
Product Overview
GE Consumer & Industrial
1/
GE /E. Timm
July 2006
Content
• Introduction
• UPS Products
• Static Transfer Switches
• GE’s unique technologies
2/
GE /
July 2006
Energy is the Key
The actual power grid was built to supply the 3 main
inventions of the last Century:
the light bulb
the electric motor
the refrigerator
Utilities provide a reliability of 99,9%
= 8 hours out of tolerance/year
„good enough“ for this type of application
To produce, store, transfer and restore
we „burn“ the energy equivalent of
4 MB of data
1 Kilo of coal
3/
GE /
July 2006
Utility not meeting business
requirements
Fact: 99.9%
ELECTRICAL POWER
=
Process
Need: 99,9999999..%
„DIGITAL WORLD“
CRITICAL RAW MATERIAL OF THE 21ST CENTURY:
QUANTITY & QUALITY & RELIABILITY OF ELECTRONS
4/
GE /
July 2006
Power Quality Cluster
Quality &
Reliability
Utility
Feed/
Sub
station
Quantity &
Availability
TVSS
Protective
Relays
UPS
Active
Filter
Switch
Gear
PDU
STS
ATS
Line
Cond.
DC
48 /120 V
PLC
Drives
customized premium power solutions
Local Generation
Ride-through
Energy Storage
Diesel
Genset
Energy
Rental
Battery
Battery
Monitoring
Fuel
Cell
Turbine
Fly
wheel
Super
Cap
5/
GE /
July 2006
Key Products – GE C&I
UPS Uninterruptible Power
Supply
Active Filters
Static Transfer Switches
Protecting equipment and
processes against
disturbances in the utility
Eliminating higher harmonic
currents, mains cleaning
Automatic switches to
increase reliability of supply
to loads
6/
GE /
July 2006
UPS – Product Range
0.35 – 3 KVA
3 to 30 KVA
Single or Redundant
20 – 120 KVA
Single or Redundant
– 4’000 KVA
Redundant
Commercial
Telecom - Wireless
Telecom - Wireline
Small Enterprise – Data Centre
Medium Enterprise – Data Centre
Large Enterprise – Data Centre
External Data Centre
Semiconductor Fab
Process Industry
BioTech, Pharmaceuticals, Hospitals
7/
GE /
July 2006
Single Phase output UPS
ML Series
350 - 1000VA (Sourced)
• Entry level product range
• Line interactive pluggable
Match
500 - 3000VA
• Mid level line interactive pluggable
Typical Application
• Single PC
• EPOS
• CCTV cameras
• Small server
• Hubs, routers
• High reliability and performance
NetPro
600 - 4000VA
• Double conversion pluggable
• Mature technology, replacement 2006
• Servers and PCs
• Small IT networks
• Telecom networks
• Process control
LP Series
3 - 10kVA LP11/31T
8 - 20kVA LP31
• Double conversion installable
• Unique RPA
• Mid-range IT networks
• Healthcare equipment
• Process control
• Large telecom networks
8/
GE /
July 2006
Three Phase output UPS
LP33 Series
Typical Application
10 - 120kVA
•Transformerless; Clean Input Tech
• Healthcare equipment
• IT infrastructure
• Telecom networks
•Small footprint, front access
SitePro
10 - 60kVA ; 250 - 500kVA
•Transformer base design
•Configurable according to installation
requirements
• Process control
• Transportation infrastructure
• Telecom networks
• Healthcare equipment
SG Series
80 - 200kVA
•Best in class in output performance
• IT networks
• Industrial applications
• Broadcasting systems
•EMC solution for critical applications
9/
GE /
July 2006
Static Transfer Switches
PRIMARY
SOURCE
SECONDARY
SOURCE
K4
normally ON
K5
normally ON
O1
• Electronic switch that ensures
uninterruptible switching between a
preferred source and an alternate
source. (primary or secondary)
O2
L1
L2
U1
U2
O3
CT1
K1
normally OFF
K3
normally ON
STS
OUTPUT
STS Static Transfer Switch
K2
normally OFF
• Automatic operation – in case the
preferred source is out of limits (fails) the
load is automatically transferred to the
healthy alternate source.
• This transfer is seamless in case both
sources are synchronized
10 /
GE /
July 2006
Static Transfer Switches
• Redundant power supplies
• Redundant cooling
• Over voltage protection
• Front access for service
• Manual bypass
• Alarm contact interface
• User friendly control panel
3 phase STS: 25 – 630 A 400V 3&4 pole
1 phase STS: 25 – 400 A 230V 1&2 pole
• Neutral dimensioned for 200%
• Unique conductivity detection
11 /
GE /
July 2006
GE‘s unique technologies
RPA Redundant Parallel Architecture
High reliability UPS cluster with no single point of failure
SEM Super ECO Mode
Saving energy whilst maintaining high protection level
IEM Intelligent Energy Management
Award winning concept for energy savings
12 /
GE /
July 2006
Redundant Parallel Architecture
utility supply
to critical load
• Up to 8 units in parallel
• Any UPS able to be the logic
leader
• Decentralized bypass
• Redundant Communication
Bus
• Transparent failover and
recovery process
• True redundancy with no
single point of failure
13 /
GE /
July 2006
Super ECO Mode
SS
DC
AC
DC
AC
VFI concept
2 Conversion Processes:
Balance:
+ optimal protection for
mission critical applications
- increased energy losses
For less critical loads run UPS on
bypass continuously
In case mains is out of limits
transfer the load to inverter
Super ECO Mode: not only is the load supplied on bypass, but the
inverter is also switched off, increasing energy savings
14 /
GE /
July 2006
Super ECO Mode
Output voltage
Bypass on/off
< 2ms
Inverter current
Inverter control
Super ECO mode
• Efficiency : 98%
• to Inverter in case Bypass is out of limits
• Fast error detection
• Extremely short transfer times (<2 ms)
• User definable scheduling
• Available for 10 – 500 kVA
Fast Transfer to Inverter
15 /
GE /
July 2006
Intelligent Energy Management
UPS: Cost of Ownership
• Purchasing Cost & Installation Cost
• Direct Operating Cost
Efficiency = Energy Losses = Heat
• Indirect Operating Cost
Heat = air conditioning / Ventilation
• Maintenance Cost
16 /
GE /
July 2006
Intelligent Energy Management
Load
100%
Typical Load
Situation
20%
20%
Time
70%
30%
Full load: 5 x 10 = 50 hours
Partial load: 5 x 14 + 2 x 24 = 188 hours
17 /
GE /
July 2006
Intelligent Energy Management
Full-Load Condition
75 %
UPS 1 - 100 kVA
LOAD = 100 %
Load
Time
UPS 2 - 100 kVA
75 %
8.00
18.00
LOAD 300 kVA
UPS 3 - 100 kVA
UPS 4 - 100 kVA
75 %
75 %
Efficiency
4 UPS
Load%
18 /
GE /
July 2006
Intelligent Energy Management
Partial Load Condition
15 %
UPS 1 - 100 kVA
Load
LOAD = 20 %
UPS 2 - 100 kVA
18.00
15 %
Time
8.00
LOAD 60 kVA
UPS 3 - 100 kVA
UPS 4 - 100 kVA
15 %
15 %
Efficiency
4 UPS
Load%
19 /
GE /
July 2006
Intelligent Energy Management
Partial Load Condition with IEM (redundancy)
Load
UPS 1 - 100 kVA
LOAD = 20 %
18.00
8.00 Time
UPS 2 - 100 kVA
LOAD 60 kVA
UPS 3 - 100 kVA
UPS 4 - 100 kVA
30 %
Efficiency
2 UPS
30 %
Load%
20 /
GE /
July 2006
Intelligent Energy Management
Partial Load with IEM (mains redundancy)
UPS 1 - 100 kVA
Load
LOAD = 20 %
18.00
UPS 2 - 100 kVA
Time
8.00
LOAD 60 kVA
Efficiency
1 UPS
UPS 3 - 100 kVA
UPS 4 - 100 kVA
60 %
Load%
21 /
GE /
July 2006
Intelligent Energy Management
Number of UPS
Full load condition
Partial Load Condition
Losses
Cost per kWh
Hours at full load
Hours at partial load
:4
: 75%
: 10%
: efficiency of UPS*
: 0.11 $
: 50h / week
: 118 / week
*: Load
75%
50%
30%
15%
Efficiency
94%
93%
87.5%
79%
US$
35000
IEM Savings with Utility redundancy
IEM Savings with UPS redundancy
30000
25000
20000
15000
10000
5000
0
500 400 330
UPS
250 200 160
120 100 80
60 40 30
POWER (kVA)
20 15 10
22 /
GE /
July 2006
23 /
GE /
July 2006