CARBONES SURAMERICANOS S.A. (CSA)
“An emerging Coking Coal Exporter from Colombia”
Present Operation and Expansion Projects
www.csa.com.co
Contents

Who we are

Coking Coal Present Operation

Projects:
- Cartagena Port Expansion
- Greenfield Areas
- Met Coke Project
Who We Are
Privately held independent Colombian co. established in 2004 by experienced coal
industry leaders and run by a management team with a proven track record.
Alvaro Alegria
ex Commercial V. P. Exxon/Cerrejon (+30 years)
Alvaro Boom
ex Administrative V.P. Exxon/Cerrejon (+15 years)
Alvaro Bustamante
Banking & Finance
Alfredo Gonzalez-Rubio
ex President Carbones del Caribe/Argos (largest
Colombian coal producer) (30 years)
David Nassar
Ex Mine Operator ( Contractor) – Carbones del Caribe
(20 Years).
Jose J. Garcia
Ex Carbones Del Caribe/Argos Sales Director 4.5
Mmt/year PCI, Sized & thermal coals (18 years)
Present Coking Coal Mines and Maritime Ports
Barranquilla (Main Office)
Cartagena
Norte Santander
Boyacá
Cundinamarca
Bogotá (Office)
Buenaventura
Snapshot (actual coal operation)

100 employees





Offices





9 administrative
64 mine + 4 mine support
18 at stockyards
5 port supervisors
Barranquilla (Main Office)
Bogotá
Ubate
Underground mine (Cundinamarca)
14 Stockyards



9 Cundinamarca
2 Boyaca
3 Norte Santander
Snapshot II (actual coal operation)

Coal Suppliers
Cundinamarca
 Boyacá
 Norte Santander


2 Quality Control Labs
Cundinamarca
 Boyacá
 Independent internationally recognized at ports


Loading Ports
Cartagena (Atlantic Ocean)
 Buenaventura (Pacific Ocean)

Bella Estancia Mine
•Low, Med and High volatile coking coals
•Two inclines (shafts)
•Production 4,000mt/month
Coking Coal Specification
Medium Volatile
(As per ASTM Standards In Dry Basis except moisture)










Total Moisture
Ash
Volatiles
Fixed Carbon
Sulphur
F. S. I.
Phosphorus
Alkali in Ash(Na2O+K2O)
Maximum Fluidity
Arnu max Dilatation
%
%
%
%
%
8.0
9.5
27.0
63.5
0.9
%
ddpm
%
7.0
0.035
1.8
+ 700
+ 60
CARTAGENA PORT
(Atlantic Ocean)
•Draft 11.2 meters BW
•Draft 2012 12.5 meters BW
•Stock area 40 hectares
•Load rate 9,000/day SHINC
•Load rate 2012 25,000/day
BUENAVENTURA PORT
(Pacific Ocean)
•Draft 10.5 meters
•Loading rate 8,000/day SHINC
Present Coking Coal & Metcoke Operation

All-encompassing operation from mine production to FOB or C&F customer´s port.

End users are major steel mills in Mexico, Brazil, Turkey, Poland, Croatia, China & Ukraine.

Volumes and Revenues continue to grow.
Projects: Cartagena Port Expansion
Cartagena Port Description

Unloading of trucks by hydraulic platforms to conveyor belts.

Discharge of river barges to conveyor belts.

Stacker and portal reclaimer supplied by FAM of Germany.

Capability for unloading trucks or barges and loading vessels
simultaneously.

Automatic sampler and magnet in conveyor system.

Exclusive berth for coal and coke loading.

Operations commence June, 2012.
General Outlay Mamonal Port, Cartagena
Cartagena Port Description

Truck unloading capacity of 12,600 mt/day with 3 platforms;
6 trucks/platform/hour (expandable). Additional platform for coke.

Coal loading rate of min. 25,000 mt/day SHINC for gearless and
panamax vessels.

Coke loading rate of min. 12,000 mt/day SHINC with Cleveland
Cascade soft loading.

Permissible sailing draft of 12.5 meters with projected draft of 14
meters.

Additional sampling of coal and coke at port arrival.
Mechanized Truck Unloading Platforms
Ship Loader and River Barge Discharging
Greenfield Areas / Potential Coal Reserves
Areas Assigned For Exploration
Location
Number of
Areas
Area
(hectares)
BOYACÁ
7
10,180
ANTIOQUIA
2
11,254
TOLIMA
1
696
SANTANDER
4
12,957
TOTAL
14
35,087
Met Coke Project Profile
•Plant Type:
Sole mechanical non recovery.
•Location:
80 km North of Bogotá, Colombia.
•Scope
54 ovens in two batteries
•Production:
175,000mt of coke per year
• Markets: Steel and ferro alloy industries in U.S.A., Mexico, Brazil, Canada,
Argentina, Peru, Europe and Asia.
• Raw Material Source: coking coal from own, associated and third party
mines within 50 km of plant location (Boyacá and Cundinamarca).
• Logistics: Coke to be transported with same trucks and exported through
same ports being used today by the coking coal operation.
Terrain and General Plant Layout
Coal Wash Plant, Crushing and Blending
Coal Crushing and Homogenizing
Coke Oven Coal Feed
Mechanized Sole Coke Batteries
Coke Loading Ready For Export
Coke Project Key Figures
PLANT SIZE
54 ovens in
2 Batteries
Internal Oven dimensions Height
1.61 m (coal)
Length
11.31 m
Width
3.12 m
Construction time
15 months
CAPEX (USD$)
$26 million
Coal requirements per month (mt)
Coke to coal ratio (conservative)
Terrain Size
Environmental & Operation Permits
Annual coke production (mt)
20,854
0.7
17 hectares
Approved
175,000