Upgrading Bitumen using Molten Sodium

Download Report

Transcript Upgrading Bitumen using Molten Sodium

Upgrading Bitumen using
Molten Sodium
Enabling Cost Effective Upgrading at
Modest Scale
John Gordon
Javier Alvare
Neil Camarta
October 11, 2012
www.fieldupgrading.com
1
Molten Sodium Upgrading
Breakthrough Upgrading
…Significantly Less Complex
…One-Half the Capital Intensity
…Twice the Net Margin
…Less Hydrogen Required
…Greatly Improved Economics
…Lower emissions
October 11, 2012
www.fieldupgrading.com
2
Molten Sodium Upgrading
Reactor
H2 or
CH4
Separato
Na salt r
Na
Ni, V, Fe
Electrolytic regeneration
Make up Na
Electrical Power
Separator
Sulfur
Simple Process
October 11, 2012
www.fieldupgrading.com
3
Diluent loop
Bitumen
production
8 API
Dilbit
Mix
18 API
Sodium
Upgrading
36
API
Sweet
20 API
Low resid
Diluent Stripper
20 API
Market
October 11, 2012
www.fieldupgrading.com
4
Major Equipment Comparison
Molten Sodium
Coking
Reactor
Atmospheric Unit
Solids Separator 1
Vacuum Unit
Condensate Stripper Cokers
Solids Dryer
Coker Fractionator
Solids Separator 2
Gas Recovery Unit
Electrolysis Unit
Hydrogen Plant
Tank Farm
Naphtha Hydrotreater
Utilities
Distillate Hydrotreater
Gasoil Hydrotreater
Amine and SRU
Tank Farm
Utilities
October 11, 2012
www.fieldupgrading.com
5
MSU Treatment Example
Fractions boil at lower temperature
“Resid” fraction is reduced
Simdist Temp ( C )
800
700
600
500
400
Dilbit treated
Dilbit AR
300
200
100
0
0
0.5
1
Fraction Boil off
October 11, 2012
www.fieldupgrading.com
6
Electro Regeneration
October 11, 2012
www.fieldupgrading.com
7
Electrolysis Cells
Cathode
Molten Sodium
NaSICON tube
Anode
Anolyte
+
+
Na2S Solids
Depleted
Na2S
Solution
Molten Sulfur
Na2S Solution
October 11, 2012
Na2S
Depleted
Solids
www.fieldupgrading.com
8
Tubular Commercial Cells
For sodium waste recovery
October 11, 2012
www.fieldupgrading.com
9
Cell Life Tests Very Encouraging
Anolyte Replacement
October 11, 2012
www.fieldupgrading.com
10
Example Metrics & Economics
October 11, 2012
www.fieldupgrading.com
11
Key Crude Valuation Metrics
Athabasca
Bitumen
Feed
MSU
Product
Best Run
MSU
Product
Potential
Delayed
Coking
Sweet
SCO
8.3
27.3
29
34.8
4.9%
<0.1%
<0.1%
0.2%
TAN, mg KOH/g
2.8
<0.1
<0.1
<0.1
Olefins wt%
0%
1.1%
<1.0%
0%
MCRT, wt%
13.2%
0.3%
<0.3%
0%
C5 Asphaltenes
16.6%
<0.3%
<0.3%
0%
289
<1
<1
<1
Property
API Gravity
Sulphur, wt%
Ni+V, wppm
October 11, 2012
www.fieldupgrading.com
12
Key Crude Valuation Metrics
Athabasca
Bitumen
Feed
MSU
Product
Best Run
MSU
Product
Potential
Delayed
Coking
Sweet
SCO
IBP – 350 F
0%
4%
4%
17%
350 – 650 F
14%
34%
36%
58%
650 – 1000 F
35%
43%
45%
25%
1000 F +
51%
19%
15%
0%
N/A
90%
95%
82%
$42.76
$74.52
$75.65
$80.01
Property
Distillation
Yield (LV%)
Edmonton
Price $US/bbl
October 11, 2012
www.fieldupgrading.com
13
Economics - Margin
MSU
Product
Potential
Delayed
Coking Sweet
SCO
Feedstock Price, US$/bbl
$42.76
$42.76
Product Price, US$/bbl
$75.65
$80.01
95%
82%
Gross Margin, US$/bbl
$29.93
$23.67
Operating Cost, US$/bbl
$8.85
$16.30
Net Margin, US$/bbl
$21.08
$7.37
Product Yield, LV%
October 11, 2012
www.fieldupgrading.com
14
Economics – Capital & Return
MSU
Product
Potential
Delayed
Coking Sweet
SCO
Net Margin, US$/bbl
$21.08
$7.37
Capital Cost, US$/bbl
$30,000
$60,000
Capital Cost, US$MM
$750
$1,500
18.4%
1.1%
NPV (10%), US$MM
$602
($835)
Profitability Index
1.80
0.44
IRR, %
October 11, 2012
www.fieldupgrading.com
15
Emissions
45% Lower CO2 Emissions
Zero SO2 Emissions
October 11, 2012
www.fieldupgrading.com
16
Niches
Smaller operations
Diluent scarce
Decentralized
Remote
October 11, 2012
www.fieldupgrading.com
17
Next Steps
Pre-pilot investigation 2012
1st Pilot scale installation and operation 2013 –
2014
October 11, 2012
www.fieldupgrading.com
18