Republic of the Philippines DEPARTMENT OF PUBLIC WORKS

Download Report

Transcript Republic of the Philippines DEPARTMENT OF PUBLIC WORKS

Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Republic of the Philippines
San Miguel
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Sta. Barbara
MAMBOG
CREEK-JIBAOAN RIVER
Pavia
CABALUAN
RIVER
Oton
DUNGON
CREEK
CALAJUNAN
CREEK
Iloilo City
ILOILO RIVER
BATIANO RIVER
River Systems
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Forbes Bridge
Quirino Bridge
Jalandoni Bridge
Diversion Bridge
Carpenter’s Bridge
City Proper
Molo
Oton
Lambuyao
Culvert
Sooc Bridge
Mohon Bridge
Arevalo
ILOILO RIVER
ILOILO RIVER ILOILO RIVER ILOILO RIVER ILOILO RIVER ILOILO RIVER ILOILO RIVER ILOILO RIVER ILOILO RIVER
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Brgy.
Molo (downstream
of Batiano
Brgy.Boulevard
Sto Nino Norte
Arevalo (downstream
Brgy.
Brgy.Boulevard
San
Sta
StoCruz
Juan
NinoArevalo
Sur
MoloArevalo
(upstream of Batiano
Brd.)
Brgy.
Brgy.
Brgy.
Brgy.
Sto
Calaparan
Calumpang
San
Alegre
Nino
Nicolas
Sur
Oton
Arevalo
Arevalo
Molo
Oton
JBLMU)
Yulo
Br.)
Upstream
of
Batiano
River(near
Poblacion
Oton
Brd.)
BATIANO RIVER
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Mandurriao
Lapaz
Forbes Br.
Trenas Boulevard
Jalandoni Br.
Carpentr’s Br.
Mohon Br.
Quirino Br.
City Proper
Molo
Sooc BridgeBr.
Oton
Arevalo
9.33 Km
(Dredging and Excavation)
ILOILO RIVER IMPROVEMENT
(Dredging and Excavation)
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION VI – WESTERN VISAYAS
OPERATIONAL COST
SECTION
STATION 1
VOLUME
DREDGING
HAULING
TOTAL
DURATION
TO BE DREDGED BY DREDGE VISAYAS II
STATION 2
51,7600
1.55 M
6.21 M
7.76 M
5 mo.
STATION 3
8,440
0.25 M
1.01 M
1.26 M
1 mo.
STATION 4
111,420
3.34 M
13.37 M
16.71 M
10.5 mo.
STATION 5
43,720
1.31 M
5.25 M
6.56 M
4.2 mo.
STATION 6
76,640
2.30 M
9.20 M
11.50 M
7.3 mo.
TOTAL
291,980
8.75 M
35.04 M
43.79 M
28 mo.
SECTION 2 (QUIRINO
LOPEZ BR. - MUELLE
LONEY BR.)
Length: 1.48 km
Volume : 51,760 m3
SECTION 1(ARROYO TO
QUIRINO LOPEZ BR.)
Length: 0.47 Km
Volume : 100, 000 m3
Length: 2.26
Volume : 76,640 m3
Length: 0.12 km
Volume: 8,440 m3
Length : 0.81
Volume : 89,210 m3
SECTION 4 (FORBES BRIDGE
- JALANDONI BRIDGE)
With exception
Volume : 45,492.5 m3
Length: 1.84 km
Volume : 111,420 m3
IZNART STREET
SECTION 6 (ILOILO BRIDGE CARPENTER BRIDGE)
SECTION 3 (MUELLE LONEY
BR. - FORBES BRIDGE)
SECTION 5 (JALANDONI
BRIDGE - ILOILO BRIDGE)
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Mambug Oton
2.5km
Lambuyao
Culvert
Mohon Bridge
Oton
San Antonio Oton
San Nicolas Oton
CONSTRICTED PORTION FROM
MOHON TO MAMBUG OTON
Mohon Arevalo
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Sta Rosa Mandurriao
JARO
Cuartero Jaro
MANDURRIAO
4.59 Km
Unworkable Area
Due to presence of Formal and
Informal Settlers and Mangrove
Vegetation
LAPAZ
City Proper
Bolilao Br. Mandurriao
Molo
Oton
Arevalo
DUNGON CREEK IMPROVEMENT
(Dredging and Excavation)
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
JARO
Calajunan Mandurriao
MANDURRIAO
LAPAZ
5.40 Km
City Proper
Molo
Oton
Arevalo
CALAJUNAN CREEK IMPROVEMENT
(Dredging and Excavation)
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION VI – WESTERN VISAYAS