Nadi Integrated Flood Management Project
Download
Report
Transcript Nadi Integrated Flood Management Project
Susan Vocea
SOPAC
Background
Project Components
Deliverables
Challenges and Opportunities
Progress to Date
The most common disasters impacting Pacific
island developing countries are cyclones
Fiji is highly susceptible to flooding with severe
floods and cyclones the key natural disaster facing
the country.
SOPAC in collaboration with the World Bank, GEF –
IWRM and the Government of Fiji is collaborating to
develop Integrated Flood Management for the
Pacific, using Nadi, Fiji as a case study.
Institutional Strengthening of Flood
Forecasting and Warning Systems
Flood Risk Assessment
Institutional Strengthening for Integrated
Flood Management
High resolution digital elevation model for Nadi
Flood risk assessment
◦ 2D flood inundation model
◦ Flood hazard maps for greater Nadi area
◦ Flood mitigation (cost benefit analysis)
Standard operating procedure for flood
monitoring and warning
Report summarising flood risk for Nadi
National IFM policy document
These deliverables will also inform other activities
in Nadi
Delay in flight of LiDAR survey due to floods in February and April
Need for verification
Volume of data
Large datasets
Nadi is high on the Fiji Government and
donors’ agendas.
Understanding and working within the donor
procurement processes
LiDAR Survey completed and data being
verified
Denarau
Nadi Airport
Flood Modelling; Consultants shortlisted
and RFP to be sent out shortly
Stakeholder Consultations