3. SL500 Basics - Quick Reference

Download Report

Transcript 3. SL500 Basics - Quick Reference

SL500 Modular Library
System
Objectives
•
•
•
•
•
•
•
Locate needed information.
Define the safety and ESD requirements.
Identify and locate major components.
Unpack , install & configure the library.
De-install the Library.
Configure switches, bridges and hubs.
Label and route cables drives to other
equipment.
• Verify and /or install library firmware.
Objectives
• Setup and operating performance.
• Diagram and document the installation.
• Update the site logs to reflect the customer’s
subsystem configuration.
Prerequisites
•
•
•
•
•
SL500 Principles of Operation
SAN Concepts and Connectivity.
L-Series Library course.
LTO Ultrium course.
SDLT course.
Personal Safety
•
•
•
•
•
Safety Precautions
Lifting Techniques
Shoulder, Elbow, Wrist, and Hand Safety
Fiber -optic Safety
Rack Safety
Product Precautions
• Electrostatic Discharge (ESD) Damage
Prevention
ESD Precautions
ESD Protection Procedure
 Prepare the work Area
 Access the Equipment
 Replace components
 Cleanup
• Fiber – optic Cable Installation
Cable routing
Cable Management
Connector protection
Planning the Installation
• General Information
Prepare the Installation location
Knowledge in SCSI principles
Knowledge in Fibre channel principles
Configuration Diagram
SL500 Tape Library Types
•
•
Library with LTO Cartridge Slots
Library with Mixed-Media Cartridge Slots
Library with LTO Cartridge Slots
• The Base module contains
50 cartridge slots
One or two tape drives
5 – slot cartridge access port(CAP)
Library with LTO Cartridge Slots
base module
LTO Slot Physical Configurations
• Slot Numbering scheme
 Four Integers
1.
2.
3.
4.
Library number
Library module number
Library row number
Library column number
Library with Mixed - Media Cartridge Slots
Library and Rack Dimensions
Library and Rack Dimensions
Library Components Weights
Library Environment Specifications
Power for Library Without Tape Drives
Power for Base Unit and Two LTO Tape
Drives
Installing EZ Hardware
Compatibility Issues
Installation Steps












Unpacking
Inspection
Preparation of Rack
Install Base Unit
Install Robotics Unit
Install Façade
Install an Expansion Module
Install the Drive Tray Assemblies
Install the Power Cables
Install the Library SCSI or Fiber Channel Cables
Inserting Cartridges
Locking the Front Door and Powering-on the Library
Base Module Accessory Kit
Expansion Module Accessory Kit
SCSI Cabling
Fiber Channel Cabling
Inserting Cartridges
Powering - on the Library
Recording the Configuration
Library Configuration Information
Recording the Configuration
Tape Drive Configuration Information
Security & Password
FRU and Spares Replacement
 Library FRU list
 Drive FRU list
Library FRU List
 Cards
 MPU2
 MPW
 RLB
 RLC
 RLE
 RLM
 Fans
 Operator Panel
 Power Supply
 Robotics unit
Drive FRU List
• RLD Card
• Fan
• Tape Drive Brick
Remote Access Tools
•
•
•
•
Stream Line Library Console
Service Delivery Platform(SDP)
Motive Insight
ACSLS