Co-Ordination meeting of KPTCL &
BESCOM
19th October 2012 Friday
Venue: Conference Hall, Corporate Office,
Cauvery Bhavan, KPTCL
BMAZ
Vijayanagar
Constraints:
LR Bande
Constraints:
Existing power transformers
are overloaded.
Remedies:
Augmentation of 2X20MVA
by 2X31.5 Power
transformer is required.
1)Existing 20MVA transformers was
enhanced by 31.5MVA, but the CTs,
breakers have not been replaced. Existing
bank of 31.5MVA transformer is getting
overloaded and load sheddingPottery
is beingRoad
effected.
Constraints:
2)1X20MVA Power transfortmer
load is Power transformers
2X20MVA
overloaded with peak load of 18MWs.
overloaded(Peak load 31MW)
Remedies:
Remedies:
Additional bank is to be proposed
for
Enhancement
of 1X20MVA by
31.5MVA transformer with switchgear.
31.5MVA.
Byadarahalli
Constraints:
2X20MVA Power transformer load os
overloaded with peak load of
36MWs which is more than 75% of
loading.
Remedies:
Transformer to be augmented by
2X31.5MVA
A-Station
Constraints:
Breaker problem due to aged CGL
breakers, no spares available.
Remedies:
All the switch gears to be replaced.
HBR & Manyatha
Constraints:
HBR and Manyatha feeding from 220KV
Hoskote located in rural & ITI-Hebbal
lines.(Load shedding is being done in
both the stations).
VHSS
Constraints:
1)Due to overloading of 2X20MVA
power transformer, load shedding to
be effected during peak hours.
2)Aged breakers, no space available
since existing C&G
EPIP
Remedies:
1)2X20MVA transformers to Constraints:
be
augmented by 2X31.5MVA Lengthy and overloaded 11KV feeder
Remedies:
transformers
2)16 breakers of Bank I & II toNew
be station at Kachamaranahalli to b
established. DPR approved.
replaced
Sarakki
Constraints:
Station is overloaded
Remedies:
The existing 20MVA power transformer
has to be augmented to 31.5MVA
DG-3 & DG-4 line
Constraint:
Load is restricted to 40MW only.
Remedies:
IT is proposed to lay 1000Sqmm 66KV cable for a
distance of about 3Kmss from SRS Peenya to
Platinum city
Hebbal to L.R.Bande line
Constraint:
Existing 66KV Hebbal – ITI 2 line overloaded.
Remedies:
IT is proposed to lay 1000Sqmm 66KV cable for a
distance of about 3Kmss from SRS Peenya to
Platinum city
Byadrahally
Constraint:
66KV Peenya- TG Hally line overloaded.
Remedies:
Replacement of Existing coyote by
HTLS/Lynx/Drake.
Kumbalagodu-Bandemutt-Sir.M.V
Constraint:
No alternate source to all the three
stations.
Amarjyothi MUSS
Constraint:
HAL-Audugodi 1&2 lines
overloaded
Remedies:
Enhancement of conductor.
K&C Valley
Constraint:
No Alternate source.
Khodays Glass Factory
Constraint:
No Alternate source.
Remedies:
To be arranged from RBI or South City
Amarjyothi-Audugodi line
Constraint:
Line overloaded.
Remedies:
Amarjyothi to Adugodi-Coyote to
Drake 6.5Kms.
St.John Wood
Constraint:
No Alternate source.
Remedies:
To be arranged from Jayadeva
Audugodi-Jayadeva line
Constraint:
Line overloaded.
Remedies:
The existing Coyote conductor
to be replaced by Drake
conductor.
Elita-Khodays Station
Constraint:
No Alternate source.
Remedies:
Proposed to have link line
from RBI/South city-2.2Km
.
Velankani Station
Constraint:
No Alternate source.
Remedies:
To be arranged from Naganathpura.
BTM MUSS
Constraint:
No Alternate source.
Remedies:
To be arranged from
Naganathpura/AECS Layout.
South City MUSS
Constraint:
No Alternate source.
Remedies:
To be arranged from Elita prominade.
Banaswadi MUSS
Constraint:
ITI-Hebbal line overloaded.
Remedies:
Replacement of 66KV Coyote by HTLS conductor
about 13KM. Included in KPTCL FY 13 budget.
HAL-NGEF line
Constraint:
To avoid radial & overload on Hoody station.
Remedies:
Replacement of 66KV Coyote by HTLS conductor about
13KM. Included in KPTCL FY 13 budget.
A Station-VHSS
Constraint:
To avoid radial & overload on A station.
Remedies:
Running additional (66KV) line using
1000 Sqmm UG cable. Included in
KPTCL FY-13 budget.
A Station- C Station
Constraint:
To avoid radial & overload on A station.
Remedies:
Running additional (66KV) line using 1000 Sqmm
UG cable. Included in KPTCL FY-13 budget.