WELCOME TO
Presentation of
NARAYANGANJ CITY
CORPORATION
MAP OF NARAYANGANJ CITY CORPORATION
NARAYANGANJ DISTRICT
NARAYANGANJ CITY CORPORATION
Background
 Narayanganj is about 17 Km Southeast of Capital Dhaka of Bangladesh. It is situated on
the bank of the river Shitalakhya, at the confluence of the Shitalakhya and Buriganga rivers.
 Narayanganj is well connected with the rest of the country by railway, road and river.
The river port of Narayanganj is considered as one of the busiest ports of the country
This has worked as great advantage for the location of many large and medium scale
industries of the country.
History
The Municipality was commissioned as an urban administrative unit in British period
Narayanganj Mnicipality was constituted on 08 September 1876 to control an area of 4.5
square miles with a population of 27,876.
The name of the first Bangali elected Chairman of Narayanganj Municipality was Late
Syed Mohammad Maleh.
In 1952, the area of Narayanganj Municipality was extended up to 7.5 sq miles
by a declaration of the Dhaka Judge court.
After the liberation first election was held on 1974. Late Ali Ahmad Chunka was elected as
the first Chairman of Narayanganj Municipality. He was elected two times for his popularity
and qualitative leadership for perspective plan and development activities in the Municipality.
History
 It is a matter of fact that there was no elected Municipal Council from 1988 to 2003 due to the
demarcation dispute case filed in the court. This long period was run by Administrator.
 During that period no remarkable development executed to fulfill the expectation of Municipal
dwellers and as a result the infrastructures of Municipality was dilapidated for not to undertake any
development activities and routine maintenance work. Tax recovery was so much lesser
percentage and was quite vulnerable. The institutional capacity as well as the quality of
Municipality services was so poor.
In those circumstances, the election of Narayanganj Municipality was held on 16 January 2003.
Dr. Salina Hayat Ivy was elected the first Woman Chairman of Narayanganj Municipality as
well as in Bangladesh.
Once upon a time it was called the Dundee of east for jute trading. It may be mentioned here
that the largest Asian jute mill hereinafter called the Adamjee was established in
Narayanganj. With the passage of the time ,the jute trading losing its past glorious prospect day
by day. I hope this past glorious prospect of jute trading should be recovered by any means.
 Narayanganj is an important business & industrial centre and economic backbone
of Bangladesh. The contribution of this city in the national economy is remarkable.
Everyday approximately BDT 3000 million is transacted in banks for different
trade & commerce.
 Considering the above cited importance-on 05 May 2011, Narayangagnj
Municipality was upgraded as City Corporation including two other adjacent
Municipalities i.e Siddirganj and Kadam Rasul.
 Now a days, it is densely populated area near Dhaka.The total area of Narayanganj
City orporation is 72.43 sq.km (including the river Shitalakhya) having population
projection is about approximately 0.709 million(1.4millon).
NARAYANGANJ CITY CORPORATION AT A GLANCE
(BASIC INFORMATION)
Establishment
Area
Population
Ward
Date of last election
Present Mayor
Councillor
Councillor in Reserved Seat
Date of Charge Takeover
: 05 May, 2011
: 72.43 sq. km (Including Shitalakhya river)
: 0.709 million (1.4 million)
: 27 nos.
: 30 October 2011
: Dr. Salina Hayat Ivy
: 27 nos.
: 9 nos.
: 01 December 2011
Holding Number
Government
Non-government
Total
Total Household
Total Population
: 316 nos.
: 47,701 nos.
: 48,017 nos.
: 1,65,637 nos.
: 7,09,381 nos.
Municipal own land
Trade License
: 314.43 acres
: 21629 nos.
INFRASTRUCTURAL STATUS OF NARAYANGANJ CITY CORPORATION
Road Type
BC
CC
RCC
HBB
WBM
BFS
Kacha
Total
: 285.01 km
: 67.78 km
: 12.87 km
: 13.58 km
: 4.39 km
: 30.00 km
: 56.50 km
: 470.13 km
Footpath
: 12.25 km
Drain Condition
Brick Drain
RCC Drain
Pipe Drain
Kacha Drain
Total
: 112.20 km
: 49.85 km
: 21.89 km
: 45.50 km
: 229.44 km
Solid waste Condition
Daily Generated Waste
Daily Collection Waste
Collection Efficiency
: 120 ton/day
: 103 ton/day
: 85.88%
STAFF PATTERN
OF
NARAYANGANJ CITY CORPORATION
EXISTING POST
PROPOSED POST
First Class
: 12 Person
: 68 Person
Second Class
: 12 Person
: 48 Person
Third Class
Fourth Class
246 Person
Total
: 102 Person
: 50 Person
: 435 Person
:
: 176 Person
: 797 Person
CONTINGENT STAFF
:495 Person
:1195 Person
INCOME SOURCE
22% (BDT 698
million)
Revenue
Project AID
78%
(BDT
2456million)
Our proposed budget is 3154.65 million whereas our Revenue income is 698.48 million.
We have limited resources and need cooperation from Development Partners.


Preparation of City Master plan.
Construction of City Corporation Building (Nagar Bhaban)

Construction of Bridges over the river Shitalakshya.

To Ensure Comprehensive Urban Planning for making Greener and
Sustainable City.

Improvement of Integrated Drainage System.

a) Improvement of Existing Drainage Network.

b) Preservation & Beautification of Water Bodies (Canals, Ponds etc.).

Establishment of Integrated Solid Waste Management System through
3R (Reduce, Reuse, Recycle).

Improvement of Integrated Road Network

a) Expansion of Road Network.

b) Construction of Embankment on both sides of the river Shitalakshya.

c) Construction of Circular Road Network along the river Shitalakshya.

connecting with Dhaka-Chittagong and Dhaka-Munshigonj highway.

Ensuring 100% Sanitation Coverage.

Installation of Water Supply System with Treatment plant.

IT Infrastructure Development.

a) Tax Automation system

b) Establishment. of Office Automation system.

c) Establishment. of IT Park.

Improvement of Electricity Sector
a) Expansion of street lighting.
b) Installation of digital traffic signaling system.
c) Installation of power plant

Establishment of Modern Materials Testing Laboratory.

Establishment and Improvement of Recreation Facilities
a) Construction of Amusement Park.
b) Construction of Playground at each ward.
c) Preservation of open Space & Plantation at each Ward.
d) Establishment of Tourism Spots.

Establishment of Medical Services System
a) Establishment of Community Clinic
b) Establishment of Ambulance Service




Introducing comprehensive Micro-credit programme to support the
poor Community.
Construction of low cost Housing Poor Community.
Improvement of City Traffic Facilities

a) Construction of Bus Terminal.

b) Construction of Truck Terminal.

c) Introducing City service within City Corporation(Rickshaw free city in core areas)

Construction of Income generating projects.

a) Improvement & Construction of Kitchen markets

b) Construction of Market cum Apartment Building.

c) Construction of other projects.


Improvement of Religious Places (Graveyard,
Crematorium, Cemetery etc.).
Establishment of City Cultural Center and Heritage park.

Establishment of Educational Institutions

a) Construction of Library at each ward.

b) Establishment of Satellite School in each Ward for poor children.

c) Establishment of Modern Medical College and Hospital.

d) Establishment of Technical University.

f) Establishment of Fine Arts Institution.

Preservation of Archeological and Historical Places.

Women Education and Employment Opportunities.

Ensuring Pollution free Water of the river Shitalakshya

Ensuring City Government System.

To build awareness about natural Hazards and Disaster.

NB: Incomplete Projects will be continued for 10(Ten) years Vision.

Improvement of drainage System and Installation of Sewerage Line
a) Improvement of Drainage Network
b) Preservation & Beautification of Water Bodies ( Cannel, Ponds)
c) Installation of Sewerage Line and Construction of Strom Water drainage.

Construction of Bridges over the river Shitalakshya.

Establishment of modern Solid Waste Management System through



3R (Reduce, Reuse, Recycle)
Construction of Circular Road Network along the river Shitalakshya
connecting with Dhaka-Chittagong and Dhaka-Munshigonj highway

Installation of Water Supply System with Treatment plant

Establishment of Modern Materials Testing Laboratory.

Ensuring Pollution free Water of the river Shitalakshya.

Construction of Income generating projects.

a) Improvement & Construction of Kitchen markets

b) Construction of Markets.

c) Construction of Market cum Apartment Building.


d) Other projects
Improvement of City Traffic Facilities

a) Rapid Bus transit with high speed.

b) Connectivity with National Metro rail.

c) Rail based mass transit system.

d) Construction of Ropeway over the river Shitalakshya.

e) Establishment of Circular Waterways

Expansion of City Corporation Area

Installation of own Power plant

a) Installation of own Power generation plant from Solid Waste.

b) Installation of own Power generation plant from others.
NB: Incomplete Projects will be continued for 25(Twenty Five) years Vision.

Establishment of Surface Water treatment Plant for Domestic Supply.

Construction of Sewerage system with Treatment Plant.

Installation of Industrial Treatment Plant.

Ensuring Pollution free Water of the river Shitalakshya.

Establishment of Educational Institution.
a) Establishment of Modern Medical College and Hospital.

b) Establishment of Technical University.

Ensuring City Government System.


NB: Incomplete Projects will be continued for 50(Fifty) years Vision.


Establishment of 100% Surface Water treatment Plant for
Domestic Supply

Ensuring 100% Installation of Industrial Treatment Plant.

Construction of 100%Sewerage system with Treatment Plant.

Ensuring 100%Pollution free Water of Shitalakshya River.

Ensuring 100% City Government System.








JICA is now working at NCC with “Inclusive City Government Project
(ICGP)”.
The goal of ICGP is to establish a framework for the improvement of:
1. Urban Governance
2. Infrastructure Development
Inclusive City Government consist of:
i. Inclusive City Corporation Administration: Coordination in planning
and implementation for various infrastructure
ii. Inclusive Beneficiaries: Current & Coming Generation, Marginalized
People
iii. Inclusive Agencies: Coordination among various Central Government
Agencies













A Project Implementation Unit of City Corporation (PIUCC) has also
been formed at NCC to coordinate, support and assist JICA as below:
Name/DesignationStatus
Mr. ABM Amin Ullah Nuri, CEO, NCC
Chairperson
Mr. Khan Muhammad Nurul Islam, SE, NCC
Member
Executive Engineer, LGED, Narayanganj
Member
Mr. Md. Nazrul Islam, Panel Mayor-2, NCC
Member
Mrs. Sharmin Habib, Panel Mayor-3, NCC
Member
Mr. Sultan Ahmed, Ward Coucilor-22, NCC
Member
Mr. Mohammad Moinul Islam, TP, NCC
Member
Mr. Hasib Mahmud, Medical Officer, NCC
Member
Representative, RAJUK
Member
Mr. Tarik Bin Yousuf Babu, Social Worker
Member
Secretary, NCC
Member Secretary
Arranged inception meeting in presence of Honorable Mayor,
Chief Engineer LGED, Representative of LGD, Representative of Local
Administration, Councellors, Member of Civil Society, Media Personnel &
NCC Officials.
Conducted 03 (Three) PIUCC Meeting
Developed Vision of NCC
Arranged 01(One) stockholder Meeting
Prepared 05(Five) Development Planning jointly NCC and JICA
JICA Expert team observed NCC Coordination meeting
JICA Expert team visited 03 (three) Zone of NCC
JICA Expert team exchanges views with local people and other
Government agencies.
Department wise Discussions was arranged at NCC in presence of
ICGP experts .
ICGP Team members partially surveyed and evaluated current position of
Narayanganj City Corporation and former 03(three) Municipalities.
Honurable Mayor & NCC Official attended National Steering Committee,
Inception Workshops and ICGP Working group session.

Five years development plan for NCC prepared by JICA and NCC Jointly
Sl.
No.
Sector
Name of Project
Cost(In
Million)
01
a) WSS
Installation of Water Supply System in Kadam Rusul
Zone.
750.00
b) WSS
Installation of Water Supply System in Siddirganj Zone.
1500.00
c) WSS
50.00
a)Bridge
Fesibility study for construction of Surface Water
Treatment Plant intake from Shitallakhya river
Construction of Foot Over Bridge over Shitalakhya River
b)Bridge
Construction of Luhia Bridge over Nobiganj Khal
50.00
c)Bridge
Construction of Kuripara Bridge over Kuripara Khal
75.00
d)Bridge
Construction of Tribini Bridge over Tribini Khal
100.00
e)Bridge
Construction of Baparipara Bridge over Baparipara Khal
50.00
02
2100.00

Five years development plan for NCC prepared by JICA and NCC Jointly
Sl.
No.
Sector
Name of Project
Cost(In
Million)
03
a) SWM
550.00
04
a) SLS
Construction of Sanitary Land Fill, Dustbins, Procurement
of Equipment and Treatment Facility at Jimkhana and
Chapatoli.
Installation of Street Lighting System and ornamental
Lighting in Kadam Rusul Zone.
Installation of Street Lighting System and ornamental
Lighting in in Siddirganj Zone.
Construction of Park and Rehabilitation of Pond with
Plantation
Construction of Stadium and Rehabilitation of Pond
Improvement and Beautification of water bodies and Lake
Renovation
1000.00
b) SLS
05
a) Park
b)
Stadium
c) Wter
Body
150.00
150.00
400.00
600.00

Five years development plan for NCC prepared by JICA and NCC Jointly
Sl.
No.
Sector
Name of Project
Cost(In
Million)
06
a)Building Construction of Community Center-Cum Cultural Center
36.00
b)Building Construction of Community Center
120.00
c)Building Construction of Public Toilet /Community Latrin
52.00

Five years development plan for NCC prepared by JICA and NCC Jointly
Sl.
No.
Sector
Name of Project
07
Drain
Re-excavation &Beautification of Cannel in Siddirganj
Cost(In
Million)
1200.00
Construction of Road side RCC Drain startng from Madanganj
Powergrid to Nabiganj Bus Stand via Bandar.
Construction of RCC Drain Cum Footpath at Ali Ahamed Chunka
Road from 2 no rail gate to Nagbari more.
200.00
Construction of RCC Drain Cum Footpath at Jale Para Road from
Jelepara Bridge to Lucky Bazar.
Construction of RCC Drain Cum Footpath at Khal Ghat road
40.20
35.82
3.74
Construction of RCC Drain at Allamah Iqbal Road.
8.00
Construction of RCC Drain cum footpath from Willson road to
Madanganj-Madanpur road (X-Rail line) via Graveyard at Bandar.
Construction of RCC Drain from Amirabadh Bus Stand to
Shitalakhya River
Construction of Drain by RCC from Nobiganj Bazar to Dakesshay
Mill
37.4
35.00
180.00

Five years development plan for NCC prepared by JICA and NCC Jointly
Sl.
No.
Sector
Name of Project
08
a) Road
Construction of Road by BC starting from Madanganj
Powergrid to Nabiganj Bus Stand via Bandar Bazar.
b) Road
Construction of Ali Ahamed Chunka Road by RCC from 2
no rail gate to Nagbari more .
Construction of Jale Para Road by RCC from Jelepara
Bridge to Lucky Bazar.
c) Road
d) Road
Construction of Allama Iqbal Road by RCC.
e) Road
Construction of Road by BC from Willson road to
Madanganj-Madanpur road (X-Rail line) via Graveyard at
Bandar.
Construction of City Protection Embankment with Plantation
& Beautification on the both sides of Shitalakhya River
Construction of Road by RCC from Amirabadh Bus Stand
to Shitalakhya River
Construction of Road by RCC from Nobiganj Bazar to
Dhakeshary Mill
f) Road
g) Road
h) Road
Cost(In
Million)
950.00
48.00
39.50
7.12
40.50
70000.00
55.00
260.00
DR. SALINA HAYAT IVY
Honourable Mayor
Narayanganj City Corporation


Five years development plan for NCC prepared by JICA and NCC Jointly
STACKHOLDER MEETING CHAIRED BY HONOURABLE MAYOR OF NCC

PIUCC MEETING CHAIRED BY CHIEF EXECUTIVE OFFICER OF NCC

PIUCC MEETING CHAIRED BY CHIEF EXECUTIVE OFFICER OF NCC

PIUCC MEETING CHAIRED BY CHIEF EXECUTIVE OFFICER OF NCC