Transcript Document
MOBILISATION OF COAL SUPPLY SHASHI KUMAR CHAIRMAN COAL INDIA LIMITED 27TH JULY 2006 PRESENTATION COVERAGE MOBILISATION OF COAL SUPPLY Assessment of Coal Requirement. Coal Vision, IEP, Working Group, Expert Committee. Assessment Assessment of Indigenous Production Capacity (Raw Coal). CIL, SCCL, IISCO / TISCO / Captive Block allocatees. Assessment of Capacity to extract CBM, Underground Gasification. Mobilisation Of Coal Supply Assessment of Gap / Mechanism to Import Cost of Production Notified Price for Utilities Competitive Pricing Market Price for Others Remunerative Pricing Notified Price to approximate To International Market Price -Quality adjustments. Capacity ( Corridors Sea Route ) Transport of Coal from Production Point to Consumption Point Cost of Transportation Rationale of transporting of Inert material. Ash % age. Coal Quality Size FSTA Consistency. GCV based Grading with lesser band width. 2 MOBILISATION OF COAL SUPPLY ASSESSMENT OF COAL REQUIREMENT SOURCE SECTOR/ PERIOD 0607 X PLAN WORKING GROUP POWER 322 469 617 CAPTIVE POWER 28 32 37 STEEL 43 40 40 CEMENT 25 24 25 FERTILISER 4 5 5 OTHERS 51 50 56 TOTAL 473 620 780 POWER 322 427 CAPTIVE POWER 28 STEEL 4 CEMENT COAL VISION 2025 & 8% GDP 2010 11-12 2015 1617 2021 21-22 24-25 553 699 804 44 63 90 112 43 54 69 90 123 FERTILISER 25 39 61 95 123 OTHERS 51 65 82 106 123 TOTAL 473 630 828 1079 1267 CONTD. 2025 3 MOBILISATION OF COAL SUPPLY ASSESSMENT OF COAL REQUIREMENT SOURCE SECTOR/ PERIOD INTEGRATED ENERGY POLICY 0607 2010 498 1112 2015 1015 1670 2021 877 2122 2425 1113 2025 1541 (26-27) 2040 (31-32) HYDROCARBON VISION 2025 BEST CASE 1118 1402 BUSINESS AS USUAL 538 659 (EIA) ENERGY INFORMATION ADMINISTRATIO N, PARIS HIGH 408 473 548 611 629 LOW 374 411 447 481 490 REFERENCE 390 439 493 (IEA) INTEGRATED ENERGY AGENCY, USA P&E DIV. PLNG. COMM. 484 481 623 612 764 920 1483 713 957 1417 (31-32) 4 AUGMENTATION OF EXISTING PRODUCTION CAPACITY MOBILISATION OF COAL SUPPLY EFFORT BY COAL PRODUCER INITIATIVE BY STATE AGENCIES MAXIMISATION OF PRODUCTION A ENVIRONMENTAL FRIENDLY MANNER B LEAST HUMAN DISPLACEMENT/ SUFFERING C HIGHEST EFFICIENCY/ LOW COST OF PRODUCTION D BENEFICIATION 1 SIMPLER LAND ACQUISITION 2 NATIONAL R & R POLICY – LEGALLY ENFORCEABLE 3 SPEEDY EMP/ FORESTRY CLEARANCE/ NPV 4 MODIFICATION : CONTRACT LABOUR REGULATION & ABOLITION ACT 1971 + LABOUR LAWS. 5 SCRAPPING OF NCWAs 6 LAW & ORDER SITUATION 7 EVACUATION OF COAL 5 MOBILISATION OF COAL SUPPLY PRODUCTION FROM CAPTIVE CAPTIVE BLOCK CAPTIVE DISPENSATION POWER STEEL & SPONGE IRON CEMENT BLOCK RESERVE (MT) PUBLIC 29 5486.48 PRIVATE 9 1496.47 PUBLIC 4 372 PRIVATE 42 7699.34 PUBLIC NIL - PRIVATE 1 7 PUBLIC 2 92.18 PRIVATE NIL - 11 4291.58 100 19445.05 NON-CAPTIVE DISPENSATION ISOLATED PATCHES NOT REQUIRING RAIL TRANSPORT CENTRAL/STATE/CORPORATION OWNED BY CENTRAL GOVT. (GENERALLY NOT FULLY EXPLORED ONES) Start of production within 3 Years (OC), 4 Years(UG) Grace of six months if forest land 6 MOBILISATION OF COAL SUPPLY SOURCE COAL BED METHANE STATUS OF COAL BED METHANE & U/G COAL GASSIFICATION NO.OF BLOCKS ALLOTTED 16 10 TO BE ALLOTED BY SEPT’06 RESERVE (BCM) AREA (SQ. KM) 820 7800 597 5791 STATUS OF OPERATION : CIL-ONGC(JV)-OBTAINED 2 BLOCKS. JHARIA-CIL COMPLETED 8 SLIM HOLES. METERAGE DRILLED: 9000. DEWATERING IN PROGRESS. U/G GASSIFICATI ON NO. OF BLOCK CHOSEN (5 NOS.) HINGANA BAZARGAON, KASTA, WANI MANDAR, LAPANGA (CHORDHARA), BHARATWADA. STATUS OF OPERATION ONE BLOCK TO SELECT FROM FIVE IDENTIFIED BLOCKS.CMPDI IDENTIFYING MORE BLOCKS. CIL JOINS HAND WITH ONGC. CONSULTANT-SKOCHINSKY INSTITUTE OF 7 MINING,RUSSIA ASSESSED COAL PRODUCTION CAPACITY MOBILISATION OF COAL SUPPLY Producing Unit Projected Production (Mt) X-Plan (06-07) XI-Plan (11-12) XII-Plan (16-17) XIII-Plan (21-22) 2025 CIL TOTAL (Incl. NE) Non-CIL Areas Unblocked Areas 373 536 648 730 782 - - 5 25 57 Total CIL 373 536 653 755 839 - - 5 15 25 SCCL 37 41 45 47 47 Others : Captive TISCO/IISCO/ GRAND TOTAL (Domestic) 19 44 75 125 175 429 621 778 942 1086 Coal-equivalent CBM-UCG 8 IMPORT OF COAL MOBILISATION OF COAL SUPPLY YEAR IMPORT (MT) 2004-05 31.8 2005-06 39.4 2025-26 (Projected) 455.0 2031-32 (Projected) > 800 REDUCTION OF DUTY YEAR COKING NON-COKING <12% ASH >12% ASH 1991-92 5% 85% 85% 2000-01 9.72% 21.16% 32.6% 2005-06 NIL 5% 5% DEVELOPMENT OF PORT CAPACITY 2005-06 : 39.4 MT (IMPORT) + 15.6 MT (COASTAL MOVEMENT) CAPACITY ENHANCEMENT : 200MT BY NEAR FUTURE AUGMENTATION OF 4 MINOR PORTS TO MAJOR PORT 9 EVACUATION OF COAL MOBILISATION OF COAL SUPPLY FREIGHT CORRIDOR 10 EVACUATION OF COAL MOBILISATION OF COAL SUPPLY I. RAIL MOVEMENT OF COAL (INCLUDING IMPORT) YEAR COAL TOTAL %SHARE 1991-92 46 338 43 2000-01 224 473 47 2005-06 294 667 44 2024-25 664 1650 40 CAGR (05-25) 4.4% 4.9% DEDICATED FREIGHT CORRIDOR – (DFC) CHITPUR TO LUDHIANA ; MOURIGRAM TO BHUSAWAL; TALCHER TO VIZAYWADA II. ELIMINATION OF X-SUBSIDISATION III. CONSUMPTION POINTS NEAR PRODUCTION POINT IV. FSTA 11 COAL QUALITY / BENEFICIATION PRESENT CAPACITY MOBILISATION OF COAL SUPPLY COKING NON-COKING TOTAL CIL 19.7 19.7 39.4 PRIVATE 11.3 69.3 80.6 TOTAL 31.0 89.0 120.00 CAPACITY ENVISAGED IN 2025 : TOTAL : INVESTMENT : 464 MTY (UNDER CONSTRUCTION- 87 MTY+ FROM EXISTING - 81MTY(CIL -11; PRIVATE -70 ) + ADDITIONAL -296) RS.5920 CRORES FOR ADDITIONAL CAPACITY OF 296 MTY INDUCEMENT : CIL OFFERING INFRASTRUCTURE FACITILTY TO PROMOTE WASHING ON CHARHEABLE BASIS. REMUNERATIVE PRICING: RS.100.00 /TONNE 12 COMPETITIVE PRICING MOBILISATION OF COAL SUPPLY BICP : MARCH 1996 COAL COMPANIES : JANUARY 2000 TARIFF COMMISSION : MAY 2006 A. UNIFORM PRICING ACROSS CIL B. NORMATIVE COST OF PRODUCTION + 15% RETURN ON NET WORTH C. DIFFERENTIAL PRICING (I) POWER UTILITIES + FERTILIZERS (II) CEMENT & STEEL AT REASONABLE PRICE (III) MARKET DRIVEN PRICE FOR REST. 13 COMPETITIVE PRICING MOBILISATION OF COAL SUPPLY SUGGESTIONS: I) MARKET DRIVEN FOR SOME II) REST TO APPROXIMATE INTERNATIONAL PRICING WITH QUALITY ADJUSTMENTS 14 CONCLUSION MOBILISATION OF COAL SUPPLY COAL SECTOR TO AUGMENT COAL PRODUCTION IN ENVIRONMENT FRIENDLY MANNER WITH LEAST HUMAN SUFFERING , APPROPRIATE BENEFICIATION AND COST REDUCTION. GOVT. TO ENSURE FASTER LAND ACQUISITION, UNIFORM LEGALLY ENFORCEABLE R&R POLICY, SPEEDY ENVIRONMENTAL AND FORESTRY CLEARANCE AND MODIFICATION OF LABOUR LAWS. NEED TO FACILITATE REMUNERATIVE PRICE FOR COAL PRODUCERS, SETTING UP OF COAL WASHERIES, SIGNING AND EXECUTION OF FSTA. STATE TO ENSURE LOCATION OF CONSUMPTION CENTRES NEAR PRODUCTION POINTS. OPTIMUM PRODUCTION BY COAL SECTOR STILL SHORT OF REQUIREMENT : DEVELOPMENT OF INFRASTUCTRE FACILITY TO FACILITATE IMPORT. 15 THANK YOU 16