Transcript Barsan Co

Project Development
Railway & Subway
Substation & Transmission
Oil & Gas & Petrochemical
Water & Waste Water
Industrial Projects
About Barsan
BARSAN, is the single-source solution for concept-to-completion,
Seamless project execution.
Every aspect of Planning, Design, Procurement, Construction, Start-up,
Commissioning and Financing is supported to produce the most reliable
processing facilities.
Clients can count on experienced, professional staff for open and honest
communication.
The BARSAN’s fine tuned project management team, will safely and
efficiently guide each project to peak performance and profitability based
on the most advanced management techniques (PMBOK).
Our Company's activities encompass the Power Transmission networks and
Substations, Power plants, Oil, Gas & Petrochemical, Railway
&Subway, mine and Mining industries.
Services
1- PROJECT MANAGEMENT SERVICES:
Project Management
Construction Management
Quality Management
Time, Cost & Risk Management
4- CONSTRUCTION WORKS:
Civil Construction
Mechanical Installation
Electrical Installation
Instrumentation Installation
2- ENGINEERING SERVICES:
Feasibility Studies
Front-End Engineering & Design
Detail Engineering
Site Technical Services
HSE & Risk Analysis
Technical Consulting
5- COMMISSIONING ACTIVITIES:
Pre-commissioning
Commissioning
Start up
3- PROCUREMENT SERVICES:
Market Survey, and Supplier Selection
Price Inquiry and Negotiation
Purchasing, Inspection and Shipment
6-FINANCIAL SERVICES:
Financial Analysis
Project Financing
Financial Risk Management
Barsan’s Organization Chart
Barsan Human Resource Comparison Charts
Human Resources Growth
Work experience
100
43.5%
80
45.0%
78
40.0%
65
35.0%
60
Employees
Employees
73
67
46
40
36
20
0
3
4
2002
2003
29.0%
27.4%
30.0%
25.0%
20.0%
15.0%
10.0%
2004
2005
2006
2007
2008
2009
5.0%
0.0%
Year
>10 yrs
5~10 yrs
<5 yrs
Experience
Academic Background
Distribution of work fields
56.5%
60.0%
62.9%
70.0%
Employees
50.0%
60.0%
40.0%
37.1%
50.0%
30.0%
20.0%
22.6%
14.5%
40.0%
30.0%
6.5%
10.0%
20.0%
10.0%
0.0%
MSc
BSc
HND
Degree
Diploma &
below
0.0%
Technical
Non-technical
Major Projects
Railway & Subway Projects
9 units Traction Substations & 3 Medium Voltage Dispatching Substations
Client:
SHIRAZ URBAN RAILWAY ORG
Project type:
EP
Partner Company:
Siemens (Germany)
Transfo (Switzerland)
Scope of Work:
 Project Management
 Performing further engineering services
 Simulation
 Procurement
 Supervision on Installation
 Training
 QA/QC Management
Brief Description:
• Supplying Equipment, supervision on installation and commissioning of 9
units of traction substations and 3 units of medium voltage distribution
substations.
• Supplying DC and medium voltage switching equipment.
• Supervision of SCADA system of traction substations and MV dispatching
substations
• All related works e.g. training, maintenance material etc.
Location:
Shiraz
Project Period:
18 Months
26 Km Overhead Catenary System (O.C.S)
Client:
SHIRAZ URBAN RAILWAY ORG
Project type:
EPC
Partner Company:
PKAG Company (Switzerland)
Siemens (Germany)
K & M (Switzerland)
Scope of Work:
 Project Management
 Reverse Engineering
 Formal Designing and Simulation of
Mechanical and Electrical System of
the Overhead Network
Procurement
 Cables
 Installation
QA/QC Management
Brief Description:
Designing, Supplying Equipments and
Implementation of OCS (Overhead
Catenary System) for line 1 of Shiraz
Urban Railway.
Location:
Shiraz – Line 1
Project Period:
30 Months
8 units Traction Substations
Client:
Tabriz Urban Railway
Project type:
EP
Partner Company:
SECHERON (Switzerland)
Schneider (Italy)
Scope of Work:
 Project Management
 Basic Design
 Detail Design
 Procurement
 Super vision on Installation
 Commissioning
 QA/QC management
Brief Description:
Carry out Reverse Engineering Services
Simulation Supplying DC Equipments
Supplying Medium Voltage Switching Equipment
Supervisory on the Installation and Commissioning of
Traction Substation and related services
e.g. Training of employer's personnel
Location:
Tabriz – Line 1
Project Period:
14 Months
Electrification of Existing Tehran-Mashhad Railway ( 2350 Km )
Client:
Islamic Republic of Iran Railways ( RAI)
Project type:
EPCF
Partners company:
Tam- Wagonpars- Hirbodan
Foreign Partner:
Siemens- Alstom
Scope of Work:
 Project Management
 Performing further Engineering Services
 Simulation
 S.S extension equipments, Transmission line
 Procurement Traction S.S of OCS system
 SCADA System
 Supplying of Locomotives
 Installation
 Maintenance and Training
 5years operation
 Related civil works
 Financing Management
 QA/QC Management
Electrification of Existing Tehran-Mashhad Railway ( 2350 Km )
•
Brief Description:
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Performing the Engineering, Supplying the goods, Equipment,
Construction works, Installing, Testing and Commissioning services,
6-month supervision, Guarantee period services, after – sale and
Maintenance services simultaneously (EPC) including:
1 Construction of Overhead Centenary System (OCS) for Tehran
Mashad double track existing Railway Route
2 Constructions of Traction Power Substations, Paralleling and Sectioning
Substations (AT, SP, and SSP).
3 Constructions of SCADA and Dispatching Centers.
4 Supplying 70 units required electrical locomotives (including : 50 units passenger locomotives
Bo-Bo and 20 units freight locomotive Co-Co) with 2 years guarantee and spare parts.
5 offering full maintenance services for the whole project such as substations,
overhead network, and centralized control BoBo and CoCo locomotives for a
period of five years along with supplying the spare parts, consumable materials and manpower.
•
•
Location:
Project Period:
Tehran-Mashhad existing railway
30 Months
Reconstruction and Renewal Of 200 KM Khorasan Railway
Client:
Railway of Islamic Republic of Iran
Project type:
EPC
Scope of Work:
 Project Management
 Disassembling the old rail road track
Ballast replacement
Transporting of the Rail and Sleeper
assembled blocks
 Welding Rails
 Fixed points procurement and
Installation
 Final track make up
 Local and foreign material
Procurement
 Track maintenance
QA/QC management
Brief Description:
Reconstruction and Renewal of 200 Km
Khorasan line together with supplying
construction material from foreign and
local resources as well as 2 years
Track Maintenance
Location:
Khorasan Province
Project Period:
48 months
( including 2 years maintenance)
Reconstruction and Renewal Of 200 KM Khorasan Railway
Major Projects
Power Transmission Line Projects
400 kV Transmission line Single circuit Twin Bundle
Client:
Khorasan Regional Electric
Company (K.R.E.C)
Project type:
EPC and Finance
Scope of Work:
 Project Management Services
 Project Controls
 Engineering Management
 Procurement Management
 Construction Management
 QA / QC Management
Brief Description:
Installing Suspension And Tension Insulator
String , And Jumper Assembly With All
Respective Hardware And Accessories ,
Wiring And Adjusting Tension And Sag Of
Wire According To Wiring Schedules And
Executive Drawings And All Services For
Wiring 3 Conductor Curlew Wire400 KV
Transmission Line Of Toos- Shirvan
Esfarayen Single Circuit Twin Bundled.
Location:
Khorasan, North east of IRAN
Project Period:
42 Months
63 kV Transmission OHL Naeen Cement Plant
Client:
Naeen Cement Plant
Project type:
EPC
Partner Company:
Cemag, Simansazan, Industrial Consulting Engineers
Scope of Work:
 Project Management
 Basic Design
 Detail Design
 Civil works
 Procurement
 Lattice Type Tower Erection
 Wiring and adjusting tension of 63kV
 Transmission line
 QA/QC management
Brief Description:
Installing Suspension and Tension Insulator String and
Jumper Assembly With All Respective Hardware and
Accessories , Wiring, Adjusting Tension and Sag of
Wire According to Wiring Schedules of 14 km 63 KV
Transmission Line.
Location:
Naeen (Isfahan)
Project Period:
7 Months (Finished)
63 kV Transmission OHL Naeen Cement Plant
63 kV Transmission OHL Nahavand Cement Plant
Client:
Nahavand Cement Plant
Project type:
EPC
Scope of Work:
 Project Management
 Basic Design
 Detail Design
 Civil works
 Procurement
 Lattice Type Tower Erection
 Wiring and adjusting tension of 63kV
Transmission line
QA/QC management
Brief Description:
Installing Suspension And Tension Insulator String
And Jumper Assembly With All Respective Hardware
And Accessories , Wiring And Adjusting Tension And
Sag of Wire According To Wiring Schedules of
14/6 Km 63 kV Transmission Line
Location:
Nahavand near to Hamedan
Project Period:
12 Months
Major Projects
Power Substation Projects
Optimization of Power Distribution of Ahwaz Production units
Client:
National Iranian South Oil
(N.I.S.O.C)
Project type:
EPC
Partner Company:
Trans Post Pars
Scope of Work:
 Project Management
 Basic Engineering
 Detail Engineering
 Procurement
 Civil works
 Installation
 Commissioning & Start Up
 QA/QC management
 HSE Management
Brief Description:
Optimization of Power Distribution of
Ahwaz Production Units, Expansion of 33/11kV
Electrical Substations Transformer and
Switchgears Sections.
Location:
Ahwaz ,South of Iran
Project Period:
24 Months (Finished)
High Voltage Substations 230/63 kV
Client:
Isfahan Regional Electric Company
Project type:
EPC
Scope of Work:
 Project Management
 Basic Engineering
 Detail Engineering
 Procurement
 Civil Works
 Installation
 Commissioning & Start Up
 QA/QC Management
Brief Description:
Extension of 3 Substation in 230 & 63 kV Sections
Replacing of Three 230/63/20kV Power
Transformer, Replacing of Equipment in 63kV
Section, Add 6 Feeders in 230kV Section with 1 ½
CB Arrangement
Location:
Abshar , Islam Abad & Ardestan
Project Period:
24 Months
Extension of Abadeh 66kV Substation
Client:
Abadeh Cement Factory
Project type:
EPC
Partner Company:
Sanayeh Asia Engineering Co
Scope of Work:
 Basic Design
 Detail design
 Procurement Management
 Installation
Civil Works
 Commissioning and Start Up
 QA/QC Management.
Brief Description:
Detail Design, Supplying, Civil Works, Mapping,
Installation, Test & Commissioning of 66/6.3 kV
Substation
Location:
Abadeh Near to Shiraz
Project Period:
12 Months
High Voltage Bonyan Sanat Khodro Substation 63/20kV
Client:
Bonyan Sanat Khodro
Project type:
EPC
Scope of Work:
 Project Management
 Detail Engineering
 Procurement
 Installation
 Commissioning & Start Up
 QA/QC Management
 HSE Management
Brief Description:
Engineering, Supply, Installation and
Commissioning of complete HV Substation
63/20kV, Including H model Substation,
2 Bay Input and11 Output Feeder
Location:
Saveh
Project Period:
24 Months (Finished)
High Voltage Naeen Cement Factory Substation 63/6.3 kV
Client:
Naeen Cement Factory
Project type:
EPC
Scope of Work:
Project Management
 Basic Engineering
Detail Engineering
Procurement
Civil Works
Installation
QA/QC Management
Brief Description:
Basic & Detail Design of 63/6.3kV Substation
Which Feed From Two 63kV Bay & Two Transformer
2 Input Feeder
2 Transformer Feeder
10 Out put & Coupling Feeder
Location:
Naeen (Isfahan)
Project Period:
12 Months
NIOTC 11 kV /400 V Substation
Client:
National Iranian Oil Terminal Co. (NIOTC)
Project type:
PC
Scope of Work:
 Project Management
 Design Review
 Project Control
 Procurement Management
 Civil Works
 Construction Management
 QA/QC Management
 HSE Management
Brief Description:
11kV/400V Substations, Replacement of 13
Transformer ,Settlement of Mechanical
Equipment & Fire Alarm System
Location:
Kharg Island
Project Period:
12 Months
Mahshar – Besat Town 132kV Transmission Line / Substation
Client:
Mahshahr Special Economic Zone
Project type:
EPC
Scope of Work:
 Project Management
 Basic Engineering
 Detail Engineering
 Procurement
 Civil Works
 Installation
 Commissioning & Start Up
 QA/QC Management
Brief Description:
Engineering services, Procurement,
Construction and Commissioning of
Mahshahr to Besat Town 132kV Electric Power
Transmission Line (12km)
Location:
Mahshahr (Iran)
Project Period:
12 Months
63kV Power Transmission Line & GIS 63/6.6kV Substation in Qeshm Island
Client:
Qeshm Oil Investment Co
Project type:
EPC
Scope of Work:
 Basic Design
 Detail design
 Procurement
 Installation
 Civil Works
 Commissioning and Start Up
 QA/QC Management.
Brief Description:
Detail Design, Supplying, Civil Works, Mapping,
Installation, Test & Commissioning of
GIS 66/6.3kV Substation as well as 25km twin
bundle / twin circuit 63kV transmission line.
Location:
Qeshm Island
Project Period:
12 Months
Major Projects
OIL, GAS & PETROCHEMICAL PROJECTS
Olefin Unit Construction
Client:
Bandar Imam Petrochemical Co.
Project type:
Construction
Partner Company:
Niksan Sanaat (Iran)
Scope of Work:
 Project Management
 Procurement of Bulk material
 Project Construction
 Civil
 Mechanical / piping
 Electrical / instrumentation
 Commissioning
Brief Description:
Completion of Construction works at
Olefin Unit for Bandar Imam
Petrochemical co
Location:
Bandar Imam Khomeini
Project Period:
7 months
Poly Propylene Production Line Revamp / Expansion
for Arak Petrochemical Company
Client:
Arak Petrochemical Company
Project type:
Construction & Commissioning
Scope of Work:
 Project Management
 Civil Works
 Structure
 Mechanical
 Electrical
 Instrumentation
 Procurement of Civil & Bulk Material
 QA/QC Management
 HSE Management
Brief Description :
Revamping and expansion of PP unit
from 50’000 TpA to 75’000 TpA
Location:
Arak
Project Period:
12 Months (Finished)
Polypropylene Production Line Expansion
for Arak Petrochemical Company
Expansion of Utility units at Arak Petrochemical company
Client:
Arak Petrochemical Company
Project type:
Construction & Commissioning
Scope of Work:
 Project Management
 Civil Work
 Structure
 Mechanical
 Electrical
 Instrumentation
 Procurement of Civil & bulk Material
 QA/QC Management
 HSE Management
Brief Description:
Revamping and expansion works at
cooling and DM unit, Central Utility Unit.
Location:
Project Period:
Arak
5 Months (Finished)
Renovation & Control Systems Upgrading For Steam
& Gas Compressor
Client:
Tehran Oil Refinery Co
Project type:
EP
Scope of Work:
 Project Management
 Basic Design
 Detail Design
 Procurement
 Supervision on Installation
 Commissioning & Start Up
 QA/QC Management
 HSE Management
Brief Description:
- 5 Control Panels Integrated by S7 Siemens PLC
- Cabling
- Programming of PLC & Monitoring System
- Instrumentation
- FAT
- SAT
- Supervision On Installation
- Redundancy of System
Location:
Tehran Refinery
Project Period:
12 Months
Renovation & Control Systems Upgrading For Steam
& Gas Compressor
Pre line check , Loop Check and Loop Test
Automation and Control Systems
Client:
PIDECO on behalf of Daelim
Project type:
Pre-commissioning Services
Scope of Work:
 Project Management
 Finishing the Remaining Work left by
First Contractor on Control Systems
Brief Description:
Pre line check loop cheek and loop test
of Automation and control systems of
some area of Gas Refinery
“South Pars Phase 1”
Location:
Assaluyeh ,South of Iran
Project Period:
6 Months (Finished)
Calibration and Relay Test of Control and Instrumentation Equipment
Client:
PIDECO on Behalf of Daelim
and IDRO Consortium
Project type:
Pre commissioning Services
Scope of Work:
 Project Management
 Ending The Remaining Work from First
Contractor in Control Systems
Brief Description:
Pre-line-check loop check and loop test
of Automation and Control Systems in
some area of Gas Refinery
“South Pars Phase 1”
Location:
Assaluyeh ,South of Iran
Project Period:
6 Months (Finished)
Major Projects
Industry & Mine Projects
Revamping & Renovation of Brick Factories
Client:
Iranian fuel Conservation Organization (IFCO)
Project type:
Engineering, Procurement & Construction
Partner Company:
KELLER (GERMANY),
IPA-ARPINA (ITALY)
SWINDELL DRESSLER (USA)
Scope of Work:
 Feasibility Study
 Project Management
 Transfer of Technology
 Procurement
 Installation
 QA/QC Management
Brief Description:
Optimizing of Fuel Consumption by Replacement of
Traditional Kiln to Improved Tunnel Kiln for 20 factories
Location:
Khorasan - Kerman - Isfahan - Tabriz - Yazd
Project Period:
25 Months
Aluminum Smelter Plant (Hormozal)
Client:
FATA EPC (Main Contractor for Hormozal Project)
Project type:
Engineering (Partial), Procurement (Partial) &
Construction
Partner Company:
Cemag, CimanSazan
Scope of Work:
 Project Management
 Procurement
 Civil works
 Installation
 Commissioning & Start Up
 QA/QC management
Brief Description:
Site Mobilization
Site Excavation
Furnace Building Reinforced Concrete Pillars
Furnace Casing and Foundation
Steel Structure for Cladding and Roofing
Cranes Railing
Control and Electrical Building and Related Facilities
Location:
Bandar Abbas
Project Period:
20 Months
Major Projects
Management Consulting
Kerman Province 500MW CCP
•
Project Definition:
Offering All Expert Services In Performing Feasibility Study And Required Studies For Preparing Explanatory Design
For The Construction Of Combined Cycle Electricity Power Plant, With The Capacity Of 500 MW In Kerman
Province, And Doing Necessary Discussion With Organization And Expedient Governmental Sector For Getting
Necessary Approval By Construction Of Above Mentioned Power Plant
•
Scope of services:
1. Preliminary Consideration Of Feasibility Study And Performing Required Explanatory Reports And Conducting
Certain Negotiations With The Electricity Development Organization Of Iran, With The Coordination Of The
Company For Getting The Approval For Construction Of The Power Plant.
2. Researches For Selecting The Type, Quantity, Combination And Arrangement Of The Units And Related BOP In
The Location, Which Is Appointed, With Regard Of Its Effect On Financial Model , Appointing Design Parameters.
3. Studying On The System, And Its Connection To The Country's Network, Short Cut Calculations And Stability Of
The Network And Distribution Of The Load.
4. Studying On The Environmental Conditions For Getting The Relevant Approval.
5. Studying On The Weather Conditions Such As Humidity, Altitude And The Temperature Degree Of The Project In
The Appointed Site.
6. Studying On The Access And Communication Routes And Transportation Of The Heavy Equipments.
(Continued on next page)…
Kerman Province 500MW CCP
•
Project Definition: (Continued)
Offering All Expert Services In Performing Feasibility Study And Required Studies For Preparing Explanatory Design
For The Construction Of Combined Cycle Electricity Power Plant, With The Capacity Of 500 MW In Kerman
Province, And Doing Necessary Discussion With Organization And Expedient Governmental Sector For Getting
Necessary Approval By Construction Of Above Mentioned Power Plant
•
Scope of services:
7. Consideration And Studying On The Geology With Regard To Earthquake.
8. Studying On The Possibility Of Access And Supply Of Raw Water And Its Transfer.
9. Studying On The Circumstances Of Supplying Fuel And Fuelling
For The Main Fuel (Gas) And The Fuel Supporter (Liquid) And Assigning The Required Quantity And The Technical
Specification Of The Fuel And Cooperation With The Company For Getting Relevant License.
10. Preparation Of Financial Model With Regard To Circular (Letter) And Related Approvals And According To The
Acceptable Formats Of Other National And International Economical Institutes.
11. Conducting Certain Negotiations And Preparation Of Contract For Selling Electricity Up To The Stage Of To Be
Signed By The Company.
Bojnord Automatic brick factory
•
Project Definition:
Bojnord Automatic Brick Factory
•
Scope of services:
Following The Step Of The Execution Of The Project, Such As Design Inspection And Estimating The Facilities For
Arrangement Of The EPC Contract For Execution, Installation And Commissioning Of The Mentioned Furnace
Tunnel And The Necessary Action For Introducing Project To The Organization Of Optimization Of Fuel
Consumption For Using Non Refundable Facilities Of The Organization And Also Preferred Facilities From Other
Financial Sources And Institutes With Credit Loan And Signing The Current Project Agreement In The Form Of
EPC
Crude Oil Storage in Qeshm Island
•
Project Definition:
Pre-feasibility study and finance services for construction of crude oil
storages in Qeshm island free zone.
Scope of services:
1)
2)
Pre-feasibility Studies
Locating The Most Proper Location To Install The Tanks With
Reference To Environmental, Economical And Legal Parameters.
3) Determination Of Storage Capacity, Pumps Characteristics And
Number And Pipe Specifications Vs. Technical And Economic
Viewpoints
4) Extraction Of Basic Lay-out And Design Of Area, Release Of
Preliminary & Schematic Drawings And Preparation Of Material /
Equipment List
5) Structural Design Of Tank And Pump Area, Release Of Drawings For
Earthwork And Concrete Works.
6) Determination Of Battery Limits For Local / Foreign Services In
Whole Scope Of Engineering, Procurement, Transportation,
Installation And Construction Works.
7) Evaluation And Review Of Economic Impacts On Project Feasibility
During Project Key Periods Like Engineering, Procurement And
Construction Works.
8) Evaluation And Review Of Interest Rate And Other Financial
Parameters On Project Feasibility.
(Continued On Next Page)…
Crude Oil Storage in Qeshm Island
•
Scope of services:
9)
Preparation Of Human Resource List, Evaluation Of HR Costs On
Project Costs, Including Training Courses For Maintenance And
Operation Works.
Evaluation Of Safety System, Gas/Oil Leakage Alarm, Fire Alarm And
Fire Fighting System.
Evaluation Of Annual O&m And Operation Costs.
Project Finance Services.
Evaluation Of Project Costs, Preparation Of Relevant Reports For
Vendors.
Management And Leading Of All Communication To/From
Banks/Credential Institutes To Receive Finance Agreement And Loan
Acceptance According To Client’s Conditions And Abilities.
Discussion And Agreement On Investment Securities Required By
Financers And Loan Payers.
Preparation And Supervision Of Finance Agreement With Financers.
Preparation Of Finance Resources (Finance Portfolio) And
Determination Of Investment Costs.
Preparation Of Investment Guidelines To Project For Interested
Investors
Preparation Of Required Agreement Packages To Be Signed Between
QFZ, NIOC And investors.
10)
11)
12)
13)
14)
15)
16)
17)
18)
19)
Optimization of Regional Electric Companies
•
Project Definition:
Optimization Of “Electrical Distribution Companies”
Structure, In A Manner That Both Electric Companies
And Clients Suffer Less Complexity In Their
Procedures And Pay Less Costs For Services.
•
Scope of services:
Consulting Services To Prepare Optimum Activity
Models For Power Distribution Companies Which
Detail Activity And Analytical Probe Criteria Are As
Following:
1 - Organizational Process Optimization Of Distribution
Departments.
2 - Outsourcing Sequences For Operations Of Distribution
Department.
3 - Providing An Optimization Model For Upgrading
Distribution Management.
4 - Providing An Optimization Model For Development Of
Advisory And Contractual Capabilities.
5 - Providing A Model For Upgrading The Evaluation
Systems Of Distribution Department.
System Loss Reduction & System Efficiency
Barsan Is A Pioneer In Power Quality
•
•
•
•
To Increase Overall System Efficiency In Power Generation, Transmission And Distribution Systems
To Decrease General Power Transmission And Distribution Loss
To Enhance System Design, Installation, Operation And Maintenance Standards And Procedures.
Provides New Technologies And New Solutions For A Better Grid Efficiency:
•
DAS (Distributed Automation Systems)
•
AMR (Automatic Meter Reading)
•
BPL (Broadband Over Power Line)
Major Projects
Project Development
Project Development Highlights by BARSAN
Barsan has a great attitude and ability to introduce new solutions and conform new projects to give the best out of every problem. While
Barsan is a pioneer in new concepts and new approaches on most of its projects, our engineering and economical team has
completed several designs, technical and economical feasibility studies and project developments.
Here is a short example of Barsan’s prosperous experiences:
1- Power Grid Loss Optimization and Power Quality
2- Optimization of Brick Kilns for Energy Saving
3- Environment Friendly Bricks (Un-Fired Bricks)
4- Concrete Sleepers (Feasibility Study and Investment)
5- Establishment of Several Power Plants as B.O.O. or B.O.T. Basis Contracts.
6- Wind Power Plant Projects (Analysis, F.S. and B.S.)
7- Solar Power Plant Projects, Industrial Technology Creation (Conceptual Design, F.S. & B.S.) from 2kW to 1000kW
8- Hydrogen as an Alternative Energy Carrier (Conceptual Design, F.S. & B.S.)
9- DC/AC Drive Conversion of Railway Transportation (C.D.)
10- Wiremesh Cable Trays
11- Cement Factories (F.S, B.S, Investment and Project Management) – 3 Projects accomplished
12- Mining and Mineral Separation / Classification Technology
13- TSP Fertilizer Production (F.S, B.S, Investment and Project Management)
14- Date Sugar Extraction and Mass Production (F.S, B.S. and Investment)
15- Technology Transfer and Mass Property Transfer Contract Consultancy and Contract Management (Privatization, Ownership Transfer,
Operation Contracts, Energy Conversion Agreements etc.)
•
Abbrevations:
•
F.S. = Feasibility Study
•
B.S. = Bankable Study
•
C.D. = Conceptual Design (in patent process)
BPL (Broadband Over Power Line)
Barsan Introduced BPL As A Pioneer Communication Medium
•
•
•
•
•
•
•
•
The First Pilot Project For Transmission Of High Speed Data On 20KV And 220V Power Line For Tehran Regional
Electric Company.
The First Pilot Project For Transmission Of Voice On 20kv And 220v Lv Power Line For Providing Telephony
Communication On Power Line By Using Transmission Of High Speed Data.
Transmission Bandwidth For The Above Two Bpl Project Is 200 Mbps.
Broadband Infrastucture Development Is One Of The Most Important Challenges For Worldwide Users Needs
The Global Broadband Market Is Forecast To Grow Up $80 Billions Until 2008
The Annual Growth Rate Between 2003-2004 Was Of 54%
Need Cost Effective And Reliable Solutions That Bridge The “Digital Divide”
High Income Economies Account Today For 94% Of The Broadband Users
CPE’s
Backbone
MV Head End
MV Head End
LV Head End
Gateway
Access Point
HIGH
VOLTAGE
MEDIUM
VOLTAGE
LOW
VOLTAGE
CUSTOMER-PREMISE
End-To-End System Solution
BPL (Broadband over Power Line) – Smart Grid Solutions
Smart Grid Services Represent The Industry’s
Most Robust Capability To Leverage Realtime Electric Distribution Network.
Services Set Includes The Following Core Elements:
•
•
•
•
•
•
•
•
Power Automation
Automated Meter Reading (AMR)
Automated Outage Detection And Restoration
Load Management Through Remote Monitoring Of
Electric Utility Network Equipment
Geographic Information System(gis)/Asset Management
System Updates
Efficient Demand-side Management/Direct Load Control
Programs
Voltage Monitoring From The Substation To The Meter
Etc.
Distribution Automation System (DAS) By BARSAN
•
Barsan EPC Company Has Developed And Operated Distribution
Automation System (DAS) To Achieve Its Goal Of Supplying The Best
Quality of Electric Power. Initially, Barsan Has A Close Cooperation With
Well known Companies, To Provide New DAS Systems To Offer Lower
Investment and Ease of Management, As Well As Excellent Scalability,
Reliability, And High Availability.
•
Barsan’s DAS Is A Metropolitan Area System With Basic Functions Such As
Remote Monitoring, Remote Control, Remote Measurement, And Remote
Setup For Distribution Equipments And A Variety Of Additional Features For
Effective Operation Of Distribution Such As Failure Detection On Distribution
Line, Failed Section Identification And Flexible Load Switching, Loss
Reduction By Sharing Related Data With Other Computer Systems,
Overload Prevention, And Line Optimization.
Pre-stressed Concrete Sleeper Factory by Barsan
•
•
•
This Project Is Barsan’s First Attempt On Mass Production. Basic Idea
Induced While Project Team Was Studying Various Resources To Procure
Concrete Parts For Khorasan Railway Renewal Project. While It Was A Big
Deal To Invest On Such A Project, Barsan Decided To Take The Risk, And
Invest On The Factory, Considering Transportation Costs And Barsan’s
Position Comparing To Other Competitors.
The Sleeper Factory To Be Located At Minimum Distance To Consumption
Place. Initial Capacity Of The Factory Is 1000 Sleepers In Two Work Shifts.
Total Investment On Project Is Estimated About €3 Million, And Construction
Period Will Be 14 Months.
Barsan Small Sustainable Energy Solutions
Barsan Has A Valuable Experience In Sustainable Energy Sources.
Out Engineering And Project Execution Background Has A Deep
Recognition And Close Touch Of Small Energy Solutions Like
Wind Mills, Solar Plants And Small Water Turbines.
Barsan Has Experimented Design And Prototyping Of Several Small
Energy Systems As Well As Installation And Commissioning Of
Large Power Plants. We Have Prepared A Complete Package Of
Sustainable Energy Solutions Like:
•
•
•
•
•
•
•
Small Wind Turbine (12.5kw) – First Attempt Of Stall Controlled
Blades Designed In Iran. (Designed And Prototyped)
Small Wind Turbine (25kw) (Designed And Prototyped)
Small Asynchronous Water Turbines (0.3 To 1 MW) - Designed
Very Small Water Turbines (1 To 50kw) – Designed
New Concept On CSP Solar Power Plants (4 Kw, 50kw, 250kw
And 1MW) Now Under Design, Prototyping And Patent Process
Very Low Investment, Very Low Consumption Solar Lighting
Solutions For Off Grid Usage Lighting And Other Small
Purposes.
Advance Solar Solutions For Energy Storage And Hydrogen
Energy Carrier.
Qualified Tenders:
•Design ,Procurement,Construction & installation,Commissioning and operation of Mashhad Urban line 2
Client: Mashhad Urban Railway organization
Consultant: Moshaver Pajohesh Co
•Design ,Procurement, Construction & installation, Commissioning and operation of MIS oil field Development project
Client: CNPCI
Consultant: CNPCI
•Design ,Procurement, Construction & installation, Commissioning and operation of Saadat Abad 400/63/20KV GIS
Substation
Client: Tehran Regional Electric Co
Consultant: Moshanir Co
•Design ,Procurement, Construction & installation, Commissioning of SSS Substations, phase 1, line 1 shiraz urban
railway
Client: Shiraz Urban Railway organization
Consultant: IMER Co
•Design ,Procurement, Construction & installation, Commissioning of infrastructure of Ghazvin- Rasht- Anzali
Transmission line
Client: Islamic Republic of Iran Railways ( IRIR)
Consultant:Metra
•Design ,Procurement, Construction & installation, Commissioning of Oromiyeh 132/20 kv Substation
Client: Azarbayjan Regional Electric Co
Consultant:Aran Naghsh
•Design ,Procurement, Construction & installation, Commissioning of Load arms N.I.O.P.D.C
Client: Palayesh Naft
Consultant:-
Qualified Tenders:
•Design ,Procurement, Construction & installation, Commissioning and operation of Bafgh-Baft-Sabzevar 400/33 kv Substations
Client: Shahid Rajayi Institute
Consultant: •Design ,Procurement, Construction & installation, Commissioning and operation of MV&LV Distribution system network at Heart
Province
Client: Ministry of Energy & Water
Consultant: :MEW
•Design ,Procurement, Construction & installation, Commissioning of 400/132/6.6 kv substation of Jajarm Aluminum factory
Client: Iran Alumina
Consultant: Namvaran
•Design ,Procurement, Construction & installation, Commissioning of 300 KM Ethiopia 230 kv transmission line
Client: EEPCO
Consultant: -
•Design ,Procurement, Construction & installation, Commissioning of two 230 kv substations in Ethiopia
Client: EEPCO
Consultant: •Design ,Procurement, Construction & installation, Commissioning of 120 MW Wind farm in Ethiopia
Client: EEPCO
Consultant: •Design ,Procurement, Construction & installation, Commissioning of slurry transfer of Bauxite in Guinea
Client: SBDT
Consultant: Nipec Co
•Design ,Procurement, Construction & installation, Commissioning and operation of Oman 33/11 Substation
Client: PDO
Consultant: -
Qualified Tenders:
Optimizing of distribution network and design, procurement, commissioning of AMR
Client: Tehran electric distributing Co
Consultant: Pajoheshgah Niro
Design ,Procurement, Construction & installation, Commissioning of 33/11 kv Mobile Substation in Iraq
Client: KRG
Consultant:-
Darbandikhan Hydro power Plant substations in Iraq
Client: KRG
Consultant:-
Shiraz Urban railway Signaling System
Client: Shiraz Urban railway
Consultant: IMER
Tabriz Urban Railway substation
Client: Tabriz Urban Railway
Consultant: Railbandar
Shiraz Urban railway ventilation
Client: Shiraz Urban railway
Consultant:: IMER
Electrification, Signaling, Communication of Esfahan Urban Railway Organization (line 1)
Client: Esfahan Urban railway
Consultant: IMER
Herat renovation of electrical development
Client: MEW
Consultant:-
Soleymaniyeh 132 kv substation and 300 km transmission line in Iraq
Client: KDG
Consultant:-
Qualified Tenders:
•Kabul renovation of Contribution network (phase 1) in Afghanistan
Client: MEW
Consultant : SMEC
•Supplying different electrical equipments in Afghanistan
Client: DABM
•4 km feeding system of Tehran Subway
Client: Tehran Urban railway Organization
Consultant : -
Barsan Certificates
Barsan Certificates
Barsan Certificates
Barsan Certificates
Barsan Certificates :
Barsan Certificates :
Consortium of DEALIM and IDRO
PIDECO
Certificate of work Quality
Dated: 26May 2003
This is to certify that Barsan Modiriat Co
Has performed “Loop Check” of Instrumentation in Area 1, 2,
4 & 13 of Phase 1 South Pars Gas Refinery, and has been
accepted by PIDECO.
Out thanks are addressed to management and technical staff
of the company.
Letter signed by
Mr. Riahi Pour (site manage)
And
Saeed Asadi (E&I manager)
Barsan Certificates :
MAPNA Group
Iranian Power plant Project Management Company
Dated: 6 May 2006
To: Barsan Co. (CEO)
Dear Sir,
Hereby ref. your letter no. LG700/031 dated 6-3-2006 you are
kindly informed that: First inspection show that in current time,
not decreasing than the least situation required of
management and staff, your company is qualified as a bidder
for MAPNA tenders, to execute transmission lines up to
400kV, Substations up to 230kV as EPC projects, and also
EPC projects of electrical & instrumentation.
Letter signed by
Behzad Azam
Commercial Manager
No. 254, Iran Zamin St, Shahrak Gharb , Tehran-Iran
Tel: (+98-21) 88371130
TeleFax: (+98-21) 88088973
E-mail:[email protected]