Transcript Slide 1
Convergence in MGNREGS S K Dash, SIRD Convergence for…. • Entitlement – MGNREGA ;guarantee being Act – 100 days to all unskilled i.e.Rs10000/ cash transfer – Panchayat as focal point of • Planning • Implementation • consumption • Outcome – Natural resource management: water and connectivity • Productivity – Enhanced productivity due “job-seekers group” and Gram Sanjojak – VCL vs departmental • More for less – Wage component from MGNREGA in all Issues and Challenges • Implementation level……more+++++++ – – – – – – – – – – – – – – – Awareness level Job card Panchayat office Demand for Employment Minimum wage, timely and equal wage payment Piece Work Selection of Work Women participation Worksite facilities Use of machines and contractors Transparency and accountability Social Audit Productive Assets / Perspective Plan / Peoples Plan People are still migrating Organizing the unorganized sector is still a long way to go Issues and Challenges • Tribals are not turning up for work and so also General mass in coastal areas. • Awareness has not trickled down to potential beneficiaries • Action still limited to small pockets • Atmosphere of collaboration is not there • Limited synergy among civil society • Media mobilization needed • People are lethargic and not doing the work • Line Department not doing MGNREGA works so encouragingly… • No visible projects… • NO CONVERGENCE……… Why Convergence • • • • • • • Increased social capital Increased physical capital Facilitating ecological synergies Mitigating effects of climate change Enhanced economic opportunities Strengthening democratic process Facilitating sustainable development SKD, SIRD Types of Convergence • Institutional Convergence • Schematic Convergence • Human Resource Convergence Existing system of delivery of service HEALTH LITERACY BENEFICIARY INSURANCE BANK INFRASTRUCTURE MGNREGA site as nodal point of welfare activity INFRASTRUCTURE HEALTH LITERACY BENEFICIARY MGNREGA SITE BANKING INSURANCE New opportunity for convergent poverty reduction MGNREGA SGSY/NRLM Rural Housing NRHM Health Insurance Nutrition SSA Pensions PDS Skill development and self-employment through\ Basic minimum needs of GP Action Plan Convergence of MGNREGA with other schemes can be done at 2 levels: • Convergence of MGNREGA with welfare schemes Adult Literacy Program NRHM Insurance Banking/ Financial Inclusion • Convergence of MGNREGA with developmental schemes SGSY/NRLM Rural Housing Watershed works Rural connectivity Horticulture Convergence of Institutions Village Org. PRI (CBOs, NGOs) Water Users Association Federation (SHG) VSS Gram Panchayat GKS Village Edn Committee Mothers Committee 11 Institutional Mechanism Scheme Village level Block level District level State level MG-NREGA Palli Sabha Gram Sabha Gram Panchayat Panchayat Samiti Zilla Parishad D.P.Coordinator SEGC BRGF Palli Sabha Gram Sabha Gram Panchayat Panchayat Samiti Zilla Parishad Dist.Plan.Com. H.P. C RKVY Farmers club WUA / JAO Dist.Planning Committee S.L. Sanctioning Committee (SLSC) SGSY Gram Panchayat SGSY Committee Block level SGSY Committee District SGSY Committee State SGSY Committee NRHM GKS PHC Advisory Committee/RKS District Health Mission State Health Mission SSA PTA / MTA Block Level Education Committee District Mission State Mission Water & Sanitation WATSAN Committee Block level WATSAN Com. Dist. W&S Mission State W&S Mission IAY Palli Sabha Gram Sabha Gram Panchayat Panchayat Samiti DRDA P R Department ICDS Mothers Committee CDPO DSWO Women & Child Development Deptt. Schematic convergence at local level Land Development/Exacavac tion of new tank MG-NREGA Marketing ORMAS Bank Linkage SGSY Multi-purpose Farm Pond Tech. Supervision Horticulture Dept. Poultry/Dockery F&ARD Cost of Plants National Hort. Mission Fish Fry Fishery Dept. Technology & Supply of Plants Horti.University Local Level Convergence……… Land acquisition Revenue Dept Land levelling: MG-NREGA Construction of Anganwadi building: BRGF/TFC New Anganwadi Centre Clubbing pre-primary & primary Education Dept Management: ICDS Water & Sanitation facility: Gram Panchayat Facilitating Convergence through MGNREGA MGNREGA Institutional linkages through convergence with MGNREGA Entry Point: MGNREGA Rural infrastructure, natural resource management (kuchha works) Value addition to MGNREGA works Kuchha to pucca works (through Watershed, PMGSY, NHM, NADP/ RKVY, RRR of Water Bodies) roductivity / Skill Enhancement Food grains, fruits, vegetables, milk, fisheries (NHM, Dairy Development, NADP/ RKVY, NFSM) Market Linkages SHGs (through SGSY, NHM) Facilitating Sustainable Livelihood Opportunities Basic Human development activities start at MGNREGA work sites Literacy Health Financial inclusion Insurance & SHG/ Federation Convergence between MGNREGA & SGSY/NRLM • SGSY – SHGs – basis for the social mobilization of poor • SHGs can influence the PRIs to prepare area based development plan including MGNREGA works • SHGs can be involved in the planning of works at household level on SC and ST land • The SHGs and their Federation – involved in the distribution of MGNREGA Job Cards and ensure issuance of MGNREGA Job Cards to very poor households • SHGs – be involved in the supervision of works under MGNREGA • Assets created under MGNREGA can be used for further value addition by providing loan under SGSY Programs for Convergence Sl.No Program Component Activities Convergence sequence 1 MGNREGA (PRD) Wage & Material Water conservation / harvesting, drought proofing, farm pond to SC/ST/BPL/IAY, Renovation of water bodies, land development, flood control & rural connectivity Water conservation/ harvesting, plantation, fair weather road under MGNREGS, kuchha to pucca & value addition under other on going programs 2 PMGSY (RDD) Wage & Material Road Fair weather road under MGNREGA & cement concrete & bitumen road under PMGSY 3 Watershed developmen t (AD) Wage, Material & training Water shed development works Infrastructure under MGNREGS & kuchha to pucca work, production measures and treatment of individual land of other than SC/ST/ BPL 4 RKVY (AD) Wage, Material & Training Holistic development of agriculture & allied sector Infrastructure under MGNREGS & kuchha to pucca work, production measures and treatment of individual land of other than SC/ST/ BPL 5 NHM (AD) Wage, Material & Training Holistic growth of horticulture sector Infrastructure development under MGNREGS & there after production measures under NHM. 6 NFSM (AD) Training & Subsidies Increasing production of rice, pulses through area expansion & productivity enhancement Infrastructure under MGNREGS & training and productivity measures under NFSM SKD, SIRD Programs for Convergence Sl.No Program Component Activities Convergence sequence 6 BRGF (PRD) Material & Training Bridge critical gaps in local infrastructure, CB & professional support After MGNREGS and convergence with other schemes, the balance works under BRGF 7 National Afforestation Program (FED) Wage, Material & Training Protection, conservation of NR, afforestation, CB In forest & fringe area infrastructure under MGNREGS and afforestation and capability endowment under NFE 8 CAD & WM (WRD) Wage & Material Efficient utilization of created water potential O.F.D. works Permissible works in permissible area under MGNREGS & left over work/ area management under program of WRD 9 Flood control & River Management (WRD) Wage & Material Flood management work Permissible works in permissible area under MGNREGS & left over work/ area management under program of WRD 10 NRHM Training & IEC (Education) Health awareness, sanitation, nutrition input Awareness among the job seekers and women job seeker group at MGNREGA work sites under NRHM If one man’s view could change the destiny of a nation, think what a room full of thinking individuals can do… Looking forward to your valued suggestions Thank You