Transcript Document
Watershed Programme (IWDP/DPAP) in Jharkhand by B. NIJALINGAPPA Additional Secretary Department of Rural Development, Jharkhand, Ranchi Date- 2-3 August 2004 Place- Hyderabad Organiser- WASSAN Jharkhand at a Glance Capital Total Geographical Area Division Districts Sub-Division No. of Blocks No. of Villages Total Numbers of Panchayats Total Numbers of Lok Sabha Seats Total Numbers of Assembly Seats Total Population Density of Poverty Total ST Population Total SC Population Literacy Rate BPL - Ranchi 79,714 Sq. km. 5 22 35 211 32,620 3,759 14 82 2,69,09,428 338 persons/Sq. km. 28% of total population 12% of total population 54.13% 54.00% Land Use Pattern Total Geographical Area Total Cultivable Land Net Sown Area Net Irrigated Area Forest Area Wasteland - 79.71 lakh hec. 38.00 lakh hec. 18.04 lakh hec (25%) 01.57 lakh hec (8%) 23.60 lakh hec (29%) 15.11 lakh hec (18.97%) Sl. No. District 1 2 Daltanganj 1 (Palamu) 2 Garhwa DISTRICT-WISE AND CATEGORY-WISE WASTELANDS OF JHARKHAND Annexure "A" Distribution of wasteland (Area in Sq. Km.) Deg. Deg. Gullied/ Land Waterlog saline/ Shifting Deg. Land SandsMining/ Barren Steep Pastures/ ravinous with/with ged/Mars alkaline Cultivatio Notified under Inland/ Industrial Rocky sloping grazing land out scrub hy land Area n area forest land plantaion Coastal wastelands Area Area land crop 3 4 5 6 7 8 9 10 11 12 13 14 Snow/ glacial Area Total wastelands Total Geog. Area % to total Geog. Area 15 16 17 18 239.09 188.16 0.00 0.00 0.00 2134.45 0.00 31.08 1.35 1.83 2.79 0.00 0.00 2598.75 12749.00 20.38 3 Deoghar 4.92 257.55 0.00 0.00 0.00 192.61 0.00 0.00 0.00 3.55 8.72 0.00 0.00 467.35 2476.00 18.88 4 Dhanbad 21.18 104.91 0.00 0.00 0.00 68.00 123.46 5.19 0.00 81.92 5.53 1.11 0.00 411.30 2996.00 13.73 5 Dumka 11.90 185.93 0.00 0.00 0.12 341.06 0.00 0.00 0.00 0.53 3.68 0.00 0.00 543.22 6212.00 8.74 6 Giridih 15.22 344.87 0.00 0.00 0.00 1349.00 0.00 0.00 0.00 25.77 27.22 5.87 0.00 1767.95 6890.00 25.66 8 Godda 22.03 283.41 0.00 0.00 7.23 119.38 0.00 0.00 0.00 4.37 2.05 0.00 0.00 438.47 2108.00 20.80 9 Gumla 4.52 486.52 0.00 0.00 0.00 660.39 0.00 0.00 0.00 0.02 133.00 24.42 0.00 1308.87 9077.00 14.42 15.82 370.91 0.00 0.00 0.00 2084.65 0.00 0.00 0.00 23.88 14.25 13.07 0.00 2522.58 11164.00 22.60 13 Lohardaga 5.45 18.57 0.00 0.00 0.00 26.95 0.00 0.00 0.00 1.97 6.57 0.00 0.00 59.51 1491.00 3.99 14 Pakur 0.00 181.91 0.27 0.00 2.87 41.73 0.00 0.00 0.00 4.29 0.00 0.00 0.00 231.07 1805.00 12.80 15 Ranchi 12.47 270.27 0.00 0.00 0.00 648.57 0.00 0.00 0.00 5.65 53.12 8.75 0.00 998.83 7698.00 12.98 0.00 282.47 17.22 0.00 34.32 44.36 0.00 0.00 0.00 3.88 0.00 0.00 0.00 382.25 1600.00 23.89 98.45 292.93 0.73 0.00 0.91 2652.25 18.45 42.37 0.11 9.95 258.90 12.51 0.00 3387.56 13440.00 25.21 451.05 3268.41 18.22 0.00 45.45 10363.40 141.91 78.64 1.46 167.61 515.83 65.73 0.00 15117.71 79706.00 18.97 7 Bokaro 10 Hazaribag 11 Chatra 12 Koderma 16 Sahebganj Singbhum 17 (West) Singbhum 18 (East) G. Total Land Administration in Jharkhand 1. Chhotanagpur Tenancy Act (1908) 2. Santhalparagna Tenancy Act (1949)Dumka, Sahebganj, Godda, Deoghar, Pakur 3. Bihar Schedule Area Regulation Act, 1969 4. Wilkinson Rules (Under Bengal Regulation XIII of 1833) 5. Indian Forest Act 1927 6. Forest Conservation Act 1980 7. Joint Forest Management Resolutions 1990 & 2001 8. Mining (Coal Bearing Act) Rainfall in Ranchi, Palamu & Hazaribag Districts in Jharkhand State Month January Feb March April May June July August Sep. Oct. Nov. Dec. Total Ranchi Palamu Hazaribag Rainfall Surplus Rainfall Surplus Rainfall Surplus water water water 23.40 0.00 23.40 0.00 22.60 0.00 47.70 0.00 32.30 0.00 32.00 0.00 30.20 0.00 17.00 0.00 23.90 0.00 22.60 0.00 10.40 0.00 14.00 0.00 53.90 0.00 14.50 0.00 49.80 0.00 218.20 0.00 152.90 0.00 211.60 0.00 392.40 198.50 340.40 56.70 331.00 106.80 351.50 210.60 343.10 176.30 335.50 201.10 236.00 114.90 181.40 30.40 227.10 106.70 79.50 14.60 49.00 0.00 78.70 0.00 15.50 0.00 14.20 0.00 14.20 0.00 6.90 0.00 6.30 0.00 6.90 0.00 1477.80 538.60 1184.90 263.40 1347.30 414.60 SCHEDULE AREA IN JHARKHAND Sl. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Schedule Area Dumka E. Singhbhum Garhwa (Bolba Block) Godda (Sunderpahri & Boarijore) Gumla Jamtara Latehar Lohardaga Pakur Ranchi Sahebganj Saraikela Simdega W. Singhbhum Non Schedule Area Bokaro Chatra Deoghar Dhanbad Garhwa (Except Bolba Block) Giridih Godda (Except Sunderpahri & Boarijore) Hazaribag Koderma Palamau DPAP BLOCKS IN JHARKHAND Sl. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Districts Ranchi Gumla E. Singhbhum Lohardaga Simdega Saraikela W. Singhbhum Hazaribag Koderma Chatra Bokaro Dhanbad Giridih Palamau Latehar Jamtara Garhwa Dumka Godda Pakur Sahebganj Deoghar Total DPAP Blocks 1 10 4 4 2 8 10 7 4 8 10 7 6 8 7 96 IWDP Blocks 20 10 9 5 7 8 15 6 1 6 6 12 1 6 1 1 1 115 Total Blocks 20 11 9 5 7 8 15 16 5 10 8 8 12 11 7 4 14 10 8 6 9 8 211 DPAP PROJECTS IN JHARKHAND Sl. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Districts Bokaro Chatra Deoghar Dhanbad Dumka Jamtara Gumla Godda Hazaribag Koderma Pakur Sahebganj Palamau Latehar Total: I 6 19 28 16 15 V 19 34 15 40 18 12 7 23 7 7 38 36 54 263 VI 7 19 14 24 24 19 200 VII 4 8 15 16 28 16 23 7 12 12 32 173 VIII 4 14 16 8 28 14 20 8 12 12 28 164 IX 4 8 14 16 20 8 28 14 20 8 12 12 22 14 200 Total 25 73 85 88 87 16 124 55 110 46 43 79 146 42 1019 FINANCIAL AND PHYSICAL PROGRESS OF WATERSHED PROJECT UNDER DPAP BATCH V,VI,VII, VIII & IX State-JHARKHAND Year-2003-2004 Month - March 2004 Sl. No. District Opening Balance on 1st April Central Release State Release + Other Release Total Availability Expenditure Balance Amount 1 2 3 4 5 6 7 8 9 % of No. of Project Expenditure A/C Opened 10 1 Bokaro 79.840 13.50 30.25 123.590 20.360 103.230 16.474 2 Chatra 26.220 116.80 10.40 153.412 88.450 64.962 57.655 46 3 Deoghar 122.650 87.35 47.25 257.250 118.660 138.590 46.126 29 4 Dhanbad 241.050 104.50 54.03 399.580 0.900 398.680 0.225 0 5 Dumka 133.990 67.50 119.58 321.070 132.000 189.070 41.113 5 6 Garhwa 244.740 94.50 115.00 454.240 186.220 268.020 40.996 62 7 Godda 117.234 47.25 62.75 227.234 71.970 155.264 31.672 0 8 Hazaribag 82.530 67.50 67.50 217.530 85.886 131.644 39.482 43 9 Jamtara 75.860 27.00 24.00 126.860 90.600 36.260 71.417 10 Koderma 161.990 39.00 27.00 227.990 1.830 226.160 0.803 11 Latehar 93.319 47.25 47.25 187.819 105.000 82.819 55.905 12 Pakur 122.183 40.50 67.95 230.633 11.967 218.666 5.189 13 Palamau 93.573 47.25 173.25 314.073 184.775 129.298 58.832 14 Sahebganj 130.900 40.50 67.95 239.350 85.500 49.880 35.722 25 Total 1726.079 840.397 914.155 3480.631 1184.118 2192.543 34.020 210 No. of NGOs Working as PIAs Under DPAP Sl. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 District Chatra Deoghar Dhanbad Dumka Garhwa Godda Hazaribag Jamtara Latehar Pakur Bokaro Koderma Palamau Sahebganj Total No. of PIAs 7 15 2 15 8 7 13 7 8 3 0 0 17 4 106 IWDP PROJECTION IN JHARKHAND Dist. Ranchi E. Singhbhum Block Year of Sanction Area Ranchi 1999-2000 6273 KGVK 1 Patmada 2000-01 7253 Soil Conervation/ 5 NGOs 5 2000-01 5115 KGVK 1 W. Singhbhum (Saraikela) PIA No. of NGOs Giridih Jamua 2000-01 6037 Vikas Darpan 1 Saraikela Kuchai 2003-04 6000 Creative 1 Bhandra 2003-04 6000 Pradhan, Adivasi Kendra, Durgam 3 Lohardaga 2003-04 Bengabad 2003-04 6000 Soil/ DFO 0 Noamundi 2003-04 6000 DFO 0 Jhinkpani 2003-04 Sisai 2003-04 5000 Soil Conservation 1 Simdega 2003-04 5000 Soil Conservation 1 Lohardaga Giridih W. Singhbhum Gumla Simdega Total: 14 FINANCIAL AND PHYSICAL PROGRESS OF WATERSHED PROJECT UNDER IWDP State-JHARKHAND Year-2003-2004 Month - March 2004 Sl. No. District Opening Balance on 1st April Central Release State Release Total Availability Expenditure Balance Amount 1 2 3 4 5 6 7 8 9 % of No. of Project Expenditure A/C Opened 1 E. Singhbhum 52.270 0.000 5.940 58.210 20.251 37.959 34.790 2 Giridih 0.000 91.000 4.530 95.530 31.440 64.090 32.911 3 Gumla 0.000 0.000 0.000 0.000 0.000 0.000 4 Hazaribag 0.000 0.000 0.000 0.000 0.000 0.000 5 Lohardaga 0.000 49.500 4.500 54.000 0.000 54.000 0.000 6 Ranchi 37.630 0.000 0.000 37.630 19.576 18.054 52.022 7 Saraikela 47.740 49.500 8.340 105.580 30.500 75.080 28.888 8 Simdega 0.000 0.000 0.000 0.000 0.000 0.000 9 W. Singhbhum 4.500 0.000 4.500 9.000 0.000 9.000 0.000 142.140 190.000 27.810 359.950 101.767 258.183 28.273 Total 10 0 Evaluation of IWDP Projects by SIRD, Ranchi As per Govt. of India's Report Sl. No. As per Evaluation Report Districts Project Period Total Area Total Total Area Total Total Cost Total Cost (In Hec.) Release (In Hec.) Release Total Balance Expenditure Amount 1 Chatra 93-94 to 96-97 1445 138.45 39.11 621 138.45 43.38 43.38 0.00 2 Lohardaga 93-94 to 96-97 2670 248.66 147.79 NA 248.66 72.79 64.54 8.25 3 Garhwa 93-94 to 96-97 1295 114.21 84.05 NA 310.00 33.96 31.07 2.89 4 Deoghar 94-95 to 97-98 4400 331.60 120.46 1185 331.60 120.46 61.90 58.56 5 Palamau 93-94 to 96-97 2705 233.97 203.46 2225 233.97 167.53 153.78 13.75 Evaluation of IWDP Projects By SIRD, Ranchi Sl. No. 1 2 3 4 5 District Work Done Nursery, Chatra Afforestation, Soil conservation, Earthen Chekdams, Ponds, Lohardaga Agroforestry, Rehabilitation of Degraded forest Rehabilitation of Degraded forest, Construction of Checkdams, Garhwa Wells, Smokeless Chulha Distribution Rehabilitation of Degraded forest, Deoghar Fuel wood plantation Palamau Plantation work Outcome of the Watershed Workshop-11th March 2004 Proposals 1. WDT members- Quality training, Exposure visits, Project management. 2. Regular district level watershed committee meeting should be held. 3. Block level committee should also be formed so that full involvement of block level officials is ensured. 4. Block level officials should also be included in the district WAC. 5. NGOs, WDT, Govt. Officials should be trained in renowned institutions like MANAGE or MYRADA. 6. One PIA should get at least 5000 hec. Area for implementation. 7. Cost of the project should be based on quantum and nature of work required for eventual requirement. 8. One percent project cost to prepare DPR to be given to PIA. 9. Line departments should be the partners with WDT for planning, evaluation and implementing. Impact Assessment Study of Watershed Development Projects in Jharkhand State Points for action Guidelines for implementation of these projects were not meticulously followed, watershed association and watershed committees were not as per the guidelines. Assets created was not satisfactory and most of them abandoned. Non use of assets. Communities involvement in planning and designing was generally weak. There were only 920 training camps were organised in four years and 772 persons were trained, which included 16% females consequently the projects have not succeeded in arousing community awareness for managing the land and water resources in an eco friendly manner. Positive impact of the programmes was observed in terms of irrigability and crops coverage, the productivity increase has been inadequate and reflecting feeble of the watershed projects. Some of the findings of the Study are listed below: Performance of both DPAP and IWDP in the assigned districts was quite unsatisfactory in terms of the utilisation of financial allocations. In case of IWDP, the utilization was 67% and for DPAP, it was 65%. The land use pattern in the selected watershed project areas in the assigned districts has shown improved land utilisation. The impact of the watershed development programmes is seen in the decrease in current follows by 9% and unused cultivable lands by 16% in the watershed area under DPAP. The net sown area and gross cropped area have recorded a moderate increase of 4% and 9% respectively after implementation of watersheds, which in turn increased the cropping intensity to 63.8% from 57.9% in the pre project period. There is no such change reported under IWDP. The soil and water conservation works carried out in the watershed area under DP AP have effected augmentation of ground water as a result of deep percolation of rainwater and continuing stream flows. Also, water storage in percolation tanks and check dams have helped in improving the soil moisture regime. Area under irrigation, particularly during rabi season has increased. The watershed districts have been found to be rich in animal population. Through watershed programmes, the animal population has increased by 12.9%. In case of poultry and fisheries, the change is extraordinary, registering an increase of 31 % and 158.6% respectively. The watershed projects in almost all the districts have generated employment opportunities for the inhabitants of the project area. The quality of maintenance of the functional assets is rated as 20% very good, 63% good and 16% fair. Only 1 percent is of poor quality, confined to Bokaro (1 earthen check dam and 2 nurseries) and Deoghar (4 gully control measure, 3 nala bank stabilization, 4 contour bunds and 7 nurseries). Tentative Cost Estimates for creation of Water Harvesting/Irrigational Structures Vision of coverage Sl. No. District 1 2 Daltanganj 1 (Palamu) 2 Garhwa Total Estimated cost(In Lakh) 3 2003-04 2004-05 Year wise Likely Work Plan 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 Likely Amount Likely Amount Likely Amount Likely Amount Likely Amount Likely Amount Likely Amount Likely Amount needed (@Rs. needed (@Rs. needed (@Rs. needed (@Rs. needed (@Rs. needed (@Rs. needed (@Rs. needed (@Rs. 6000/hect) 6600/hect) 7200/hect) 7800/hect) 8400/hect) 9000/hect) 9600/hect) 10200/hect) 4 5 6 7 8 9 11 12 22611.39 1949.26 2144.18 2339.11 2534.03 2728.96 2923.89 3118.81 3313.74 3 Deoghar 4066.35 350.55 385.60 420.66 455.71 490.77 525.82 560.88 595.93 4 Dhanbad 3578.67 308.51 339.36 370.21 401.06 431.91 462.76 493.61 524.46 5 Dumka 4726.49 407.46 448.20 488.95 529.69 570.44 611.18 651.93 692.67 6 Giridih 15382.70 1326.10 1458.70 1591.31 1723.92 1856.53 1989.14 2121.75 2254.36 3815.07 328.89 361.77 394.66 427.55 460.44 493.33 526.22 559.11 11388.31 981.75 1079.93 1178.10 1276.28 1374.45 1472.63 1570.80 1668.98 21948.64 1892.12 2081.34 2270.55 2459.76 2648.97 2838.19 3027.40 3216.61 517.79 44.64 49.10 53.56 58.03 62.49 66.96 71.42 75.88 14 Pakur 2010.51 173.32 190.65 207.98 225.32 242.65 259.98 277.31 294.64 15 Ranchi 8690.69 749.20 824.12 899.04 973.96 1048.88 1123.80 1198.72 1273.64 3325.91 286.72 315.39 344.06 372.73 401.40 430.07 458.75 487.42 2795.02 3049.11 3303.20 3557.29 3811.39 4065.48 4319.57 12473.36 13607.30 14741.24 15875.18 17009.12 18143.07 19277.01 7 Bokaro 8 Godda 9 Gumla 10 Hazaribag 11 Chatra 12 Koderma 13 Lohardaga 16 Sahebganj 17 Singbhum (West) 29474.72 2540.92 18 Singbhum (East) G. Total 131537.23 11339.42