3 P’s
Purpose:
– Introduction to Six Sigma methodology and roll out of I&CIM vision to all
employees of Europe
Process
– Presentation & exercises
Product
– Common understanding of Six Sigma
2
Voice of Stake Holders
3
I&CIM Mission,Europe
Aggressively Change the Way We Do
Business with Sustained Improvements
4
What is Quality
Quality is a state in which ‘Value Entitlement’ is realized for
the customer and provider in every aspect of the
business relationship
In the world of six sigma ‘entitlement’ means that companies have a rightful
level of expectation to produce quality products at the highest possible profits;
for customers ‘entitlement’ means that they have a rightful level of
expectations to buy high-quality products at lowest possible cost.
5
The Absolutes of Excellence
Focus:
Your Customer
Performance Goal:
Do it Right the First Time
Method:
Innovation & Continuous Improvement
Control:
Customer Feedback
People
Caring
Style:
Teamwork
Reward:
Recognition and Security
6
Business Performance
7
How do we work
Customer Requirement
CUSTOMER
Y
+
Loss
Quality
Delivery
Price
New Launches
Internal Performance
Performance at Customer
FTQ = 10,000 -30,000
PPM= 30-40
Supplier = We don’t Know
99 %
Cost = Red
Price = As per
Customer
Design FTQ= 200,00003000000
SOP On time
We lose More As We Grow More
8
Where we lose money
Inspection
(Easily Identified)
Traditional Quality Costs
Warranty
Rejects
Scrap
1.5 % of Revenue
Rework
(tangible)
Hidden Quality Costs
Lost sales
(Difficult to measure)
Customer Sat
Long cycle times
Field Modifications
Overtime
(intangible)
T&L
More Setups
Expediting costs
Customer Productivity Loss
Late delivery
15-20% of
Revenue
Lost Opportunity
Excess inventory
Lengthy Installs
Lost Customer Loyalty
Engineering change orders
Employee Morale, Productivity, Turnover
Six Sigma reveals hidden capacities and capabilities
9
How much we lose
If X is a 3s Company, Cost of Failure
is Estimated to Be at Least 15% of Sales
Cost of Failure (% 40%
Sales)
35%
30%
25%
20%
15%
10%
5%
Defects per Million
3.4
Sigma 6
233
6210
5
4
66,807
3
308,537
2
691,462
1
A $0.8 Billion Cost Reduction Opportunity in Europe!
10
How do we Improve today
Pr
y3
oje
c
yn
ts
xn x
2
y2
Business
Processes
Higher
y1
Business
Process
(“Strategic”)
Acquire New
Business
Obtain Request to
Buy Service
Conduct
Underwriting
Prepare
Contract
Initialize
Customer Service
x1
y4
SIPOC
Establish
Terms
Prepare
Docs
Negotiate
Contract
Close
Deal
Random
Down Stream
Down Stream
C
(ext.) Customers
(int.) Cust. Service Dept.
Detailed
Subprocess
Map
Tasks
Procedures
Lower
Upstream
Upstream
S
Underwriters
Lower Hierarchy
Down Stream
Improvement in Down Stream Process &
Lower in Hierarchy gets PULLED by the
Upstream process & Higher in Hierarchy
Big $
Present
Focus
Savings are recorded but does not HIT the
Profit & Loss A/C
Improvement are incremental & unsustainable in Nature & we Need BREAKTHROUGH &
sustainable
11
Change
12
What to Change
We all agree there is a Need to change the way we work
But we need to Bring Speed in the change
Change the thinking from Cost to profit
$
$
$ $
$ € $ $
$ $ $
$$
$
$
$
$
Don’t look at the cost of the
person watering the plants,
But look at the impact of
the process on the
results.
$
$
$
There are many “Upstream Process” apples still waiting to get picked
13
What is the changed methodology
Innovation & Continuous Improvement Methodology (I&CIM)
is a X’s common global philosophy of doing business by
implementing a rigorous, structured & Data driven Continuous
Improvement Methodology which Focus on the Customer by
driving perfection in the Business processes through
Understanding & Eliminating All Sources of Variation.
Business Process Variation is a termite in our growth
14
Success & Results
15
Major Projects in Europe
Projects
Claim Management process for Model Year &
Engineering Changes
Connection Systems Capacity improvement
In-sourcing of components
Tapping Utilization
Cutting Machine Productivity
Costing Accuracy
Trucking efficiency
Cost of Value Streams
Design Process optimization
NC Cost in Mechatronics
Over dues A/C Receivables
Europe Wide FTQ reduction
Estimated Savings
$30-50Mi.
$2-3Mi.
$3-4Mi.
$1Mi.
$1-2Mi.
$3-4Mi.
$4-5Mi.
16
X Global Performance
2002
Certification Status
1.13% We are
0
100%
247
Here
90%
250
80%
70%
200
60%
150
28.2
50%
40%
76
100
21
50
30%
15
18
12
3
20%
30
10%
0%
0
MBB
GB
(Exec)
GB
BB
Master- JMApRed X
Shainin Shainin Shainin tech
Certification In-process
Savings ($ Million)
0.06
100%
490
500
80%
450
70%
400
60%
350
50%
300
40%
250
0
0
90%
3.69
0
Plan
15
7.9
Achieved
1.65
30%
200
135
150
20%
69
100
2
50
10%
16
8
30
0
MBB
GB
(Exec)
GB
BB
Master- JMAp- Shainin
Shainin Shainin Shainin
tec
0%
AP
EU
NA
Savings ($ Million)
SA
17
What is Six Sigma
18
The Many Facets of Six Sigma
• Focus and commitment to
quality must be driven by
top leadership
• Leadership must be fully
engaged and accountable
for success
Leadership
Process
• Six Sigma provides classical
problem solving tools
enhanced with a
fundamental knowledge of
statistics and variation
6s
• Focus is on statistical
process capability and
process variation analysis
• Products must be designed
to be manufactured within
process capability
• Process capability must be
quantified
Tools
Metrics
• Goal is defect free products
and processes
• Focus is on process capability
(rolled throughput yield) rather
than end of line yield
• All decisions must be data
driven
19
Business Performance
Boat is
still
there ??
Target
I Shot
the
Boat!!
Customer
Supplier
Average
Customer Dissatisfaction
Organisations focus on
internal performance
20
Customer Experience
Target
Variation of the Upstream to downstream processes creates variation to Customer21output
What Is Six Sigma
Before
3s
A 3s process because 3 standard deviations
fit between target and spec
Target
Customer
Specification
1s
0.27% Defects
2s
3s
Customer
Specification
Target
After
6s !
1s
2s
3s
4s
No Defects!
5s
6s
Reducing Variability Is The Key To Six Sigma
Quality as a Function of Part Count
Why Six Sigma
For Average Part Quality Level
2000
1800
Product Quality Level
1600
1400
1
2
1200
3
4
5
1000
PPMs
6
7
800
8
9
10
600
400
200
0
250
200
150
100
50
No of Parts in the product
6 sigma Increases probability of shipment of defect free products
23
Why Today
(with ± 1.5 s shift)
PPM
IRS - Tax Advice
(phone-in) Restaurant Bills
Doctor Prescription Writing
(140,000 PPM)
Payroll Processing
Order Writeup
Journal Vouchers
Wire Transfers
Airline Baggage Handling
1,000,000
100,000
10,000
1,000
100
10
1
Purchased Material
Lot Reject Rate
3s
6s
Average
Company
1
2
3
4
Best-in-Class
Domestic Airline Flight
Fatality Rate (0.43 PPM)
5
6
7
Sigma Scale of Measure
Adds Reliability and Competitive advantage
24
The Standard Deviation
1 Sigma - 68%
2 Sigma - 95%
3 Sigma - 99.73 %
m
s = S (X – X)2
n
1s
Upper Specification Limit (USL)
Target Specification (T)
Lower Specification Limit (LSL)
Mean of the distribution (m)
Standard Deviation of the distribution (s)
p(d)
T
USL
3s
What Variation Means to Business
L
H
Higher Production
H
L
Cycle Time Reduction
H
L
Inventory Reduction
H
L
Lower Price
Using mean-based thinking, we improve average performance, and we break out the
champagne ...
But our customer only feels the variance and cancels the next order!
Shifting of the mean require heavy capital investment and does not significantly reduce the
waste
Variation is enemy, just kill it.
7/15/2015
Corporate Initiatives Group - Europe
26
Stability Factor
A Six Sigma Best Practice For Generating Free Capacity . . .
Q1 = Quartile 1 (25%)
Q3 = Quartile 3 (75%)
Q3
Capacity
Gain
2000
Q1
Plant Capacity =
2000 / Year
C4
1500
Stability Factor = Q1/ Q3
Q3
1000
Q1
Plant
Capacity =
1100 / Year
500
Index
10
20
SF <0.9, Control Issue
30
40
50
60
IMPACT
• Mfg Cycle
• Inventory Turns
• Promises Kept
• Investment Efficiency
• Labor Productivity
• Delivered Quality (PPM)
SF >0.9, Technology Issue
Stability factor can unfold hidden factories
The Focus of Six Sigma
f (X)
X1 . . . XN
Independent
Input-Process
Cause
Problem
Control
Y
Y
Dependent
Output
Effect
Symptom
Monitor
Would you control shooter or target to get the Gold Medal at
Sydney
28
The Inspection Exercise
Task: Count the number of times the 6th letter
f the alphabet appears in the following text.
The Necessity of Training Farm Hands for First
Class Farms in the Fatherly Handling of Farm Live
Stock is Foremost in the Eyes of Farm Owners.
Since the Forefathers of the Farm Owners Trained
the Farm Hands for First Class Farms in the
Fatherly Handling of Farm Live Stock, the Farm
Owners Feel they should carry on with the Family
Tradition of Training Farm Hands of First Class
Farmers in the Fatherly Handling of Farm Live
Stock Because they Believe it is the Basis of Good
Fundamental Farm Management.
29
The Impact of Added Inspection
If the likelihood of detecting the defect is 70% and we have 10
consecutive inspectors with this level of capability, we would
expect about 6 escaping defects out of every 1,000,000 defects
produced.
1,000,000 ppm
6 ppm
3.4 ppm
You can save your self by producing quality not by Inspection 30
Six Sigma As A Goal
Distribution Shifted ± 1.5s
s
2
PPM
308,537
3
66,807
4
6,210
5
233
6
3.4
Process
Capability
Defects Per Million
Opportunities
31
Process Performance
FTQ performance of manufacturing quality
What are the over dues as % of the total
Receivables
What is the shipping window of the suppliers
What is the % of pending payables
What is the % compliance to the production
plan
What is the % compliance of the project
completion date
5000-10000 PPM
Implementation
33
Where in X…..
... Can Be Applied To Every Business Function
Sales
Engineering
Purchasing
HR
6 Sigma
Methods
Finance
Manufacturing, CS, P
IS&S
34
Philosophy Behind Implementation
We don’t know what we don’t know
We can’t do what we don’t know
We won’t know until we measure
We don’t measure what we don’t value
We don’t value what we don’t measure
Six Sigma is a process of asking questions that lead to tangible, quantifiable
answers that ultimately produce profitable results
35
Six Sigma Road Map
Customer Requirements
Identify Customer Requirements
Identify Business Requirements
Identify Broken Processes
Allocate resources and execute
six sigma project
Permanent repair the process
Monitor the business
performance as seen by
customer
Business Requirements
Broken Process
5
4
6
3
2
Business
7
Process
8
1
Organisation
Weak Business Process Can’t Meet Customer Requirements
36
Six Sigma Road Map
Celebrate -Reward & Recognition
Keep Clear Focus
Mentor, Coaching & Closure of Projects
Grow MBBs
Train Green Belts
Train Black Belts
Train Green Belts
Get Master Black Belts
Support with Organisation Structure
Decide the Business Strategy
Right Structure can only make it successful
37
Change Process
1
Convincing Self
2
Convincing Others
DMAIC/DFSS Process
Break Through Improvement
3
4
Point 1 & 2 contribute 70-80% of the success
38
Organisation
39
Organisation
Six Sigma Structure
Coach/
MBB
Financial
Reviewer
Black Belt /
Green Belt
Project
Target “Y”
Define clear roles of the people
40
Who Are These People?
Green Belt:
–
–
–
–
5 days of training
Focused on DMAIC
Knowledge of PCSs
Part time team member
Black Belt:
– 15 plus days of training
– Normally, highly knowledgeable on a
particular process.
– Respected by peers
– Full time position, managing 3-6 DMAICs and PCSs
– “A rising star”
41
Who Are These People? (continued)
Master Black Belt:
–
–
–
–
–
–
–
–
Sponsor:
–
–
–
–
–
Quality Professional
~8 weeks of training including electives
The mentor to the BB
The facilitator of the entire process
Supports specific areas of the company
Can support 6-8 BBs, 12-20 DMAICs
Responsible for validating the linkages of the PCSs for his/her area
Does not report to any process owner
The process owner
Supports the BBs in his/her area
Removes barriers for DMAIC teams
Responsible for the teams’ success
Accountable for SS in his/her area
Champion:
–
–
–
–
Responsible for multiple processes
Boss to a number of Sponsors
Provides the linkage to the business at the highest level
A member of Jim Spencer’s staff
42
Who Are These People? (continued)
The Business Leader
– Jim Spencer
– Ultimately, responsible for the quality of a particular business function
The Quality Leader
– Mentor of the Business Leader with regards to Six Sigma
Project Name: Reduce FTQ
Deployment Champion-
Champion- Site Manager
Sponsor- Plant Manager
MBBBBGB43
Project Selection
44
COST
Scrap
Tickets
Project Selection
Scrap
Tickets
FTQ or
RRPPM
Defect
Start-Up
(Start-Over)
Unplanned
Downtime
Labor for
Replacement
Source
Failure Mode
Quality
Problem
$$$$
$$$$
Failure Mode
Labor for
Replacement
Failure Mode
COST
45
Project Selection
Business
Process
Get the New Order Design the Parts
Launch New
Products
Failure
Modes
Unclear Contract
Not On Time +
FTQ high
Sales
High Cost + Not
Reliable Design
Engg
8.8%
7.3%
PCL
Engineering
Changes and
Model Year
Changes
Not Capturing &
Claiming the cost
+ FTQ high + High
Cost
Purchase &
Procure the
material
Manufacture
High Cost + Poor
Utilization
High COPQ + Low Not Capturing the
Porductivity + High cost + Allied
Investment
Imbalance
Pur
Mfg
53.1
%
21.4
%
Cs
Allied Sales
IT
Customer
A/C Receivables +
PPM + Poor
Delivery
HR
1.6%
Functional Baskets Gets filled by the Precipitated Cost of the Business Process
46
Project Selection
Salaried
Indirect
Direct
Over Time
Freight
Premium Freight
Obsolete Material
PCL
Inventory
Inspection
Rework
Scrap
Warranty & Others
Prevention
Maintenance / Utilities B/D
Spare Part
Consumable
Energy
Material
Cable
Terminals
Tape, Conduits, Clips etc
Other Material
Consumable
Packing
Out Side Service
Supplier
Facility
Rent/ Space
Finance Cost
A/C Receivables
Customer Claims
Supplier Claims
Total Cost
Insp 2
Assembly2
Insp1
Assembly1
Cutting4
Cutting3
Cutting2
Cutting1
Issuing
Storing
Inspect
Material
Receive
Material
Lead Prep 2
Cost (in USD)
Lead Prep 1
Cost Head
People
Plant No
Plant Location
Ordering &
Material
Planning
Application
Engineering
Plant Wide Six Sigma Project Selection
$234
$23
COPQ
$3
$2
$44
$55
$44
$3
$33
$44
$44
$555
$3
$33
$257
$2
$3
$44
$44
$555
$6
$0
$44
$0
$55
$0
$44
$33
$33
$0
Indirect Measurements
Machines
Quality
No of Machines
Capacity (3 Shift )
Actual Production/ Shift
Uptime
Machine Utilisation
FTQ
47
Project Selection
Functional Cost
$800
$700
$600
$500
$400
$300
$200
$100
$0
Salari Indire Direc Over Freig
ht
Time
t
ct
ed
Series1 $234 $566
$45
$0
Premi Obso
um lete
Freig Mater
$169
$0
Inven Inspe Rew
tory ction ork
$0
$5
$89
Warr Prev
Scra
anty entio
p
n
&
$88 $558
$0
B/D
Rent/ A/C Cust Suppl
Tape, Other Cons
Spar Cons
Packi Suppl
Termi
Ener
Spac Recei omer ier
Cond Mater umab
Cable
e umab
ier
ng
nals
gy
e vable Claim Claim
le
ial
uits,
le
Part
$110
$88
$55
$88
$0
$0
$0
$0
$0
$0
$105
$66 $683
$99 $345
48
Project Selection
Process Cost
$800
$700
$600
BB Project
$500
$400
$300
$200
$100
$0
Applic Orderi Recei Inspec
Recei
Storin Issuin Cuttin Cuttin Cuttin Cuttin Lead Lead Asse
Asse
Asse
Asse
Packin Storin Invoici Despa
ation ng &
ve
t
Insp1
Insp 2
Insp 3
Insp 4
ving
g
g
g1
g2
g3
g4 Prep 1 Prep 2 mbly1
mbly2
mbly3
mbly4
g
g
ng
tch
Engine Materi Materi Materi
the
Series1
$257
$2
$3
$44
$44
$555
$6
$0
$44
$0
$55
$0
$44
$33
$33
$0
$59
$45
$62
$677
$753
$0
$0
$178
49
$499
Certification Process
50
Certification Map
Black Belt
Six Sigma
Six Sigma BB Training
Project Application
Pass all
tollgate
review
sessions
4 - 6 months avg.
1week training per month
Yes
Technical
Certification
A
No
Improve Tools and
Application to Project
A
Project Completed
and Final Report
Submitted and
Approved by
Sponsor
Six Sigma Black Belt and I & CIM Certification
Yes
No
Complete Project and
Submit Final Report
51
Certification Map
Green Belt
Six Sigma
Six Sigma GB Training
Project Application
Pass all
tollgate
review
sessions
10 weeks (1 day on / 9 days off)
3 months avg.
Yes
Technical
Certification
A
No
Improve Tools and
Application to Project
A
Project Completed
and Final Report
Submitted and
Approved by
Sponsor
Six Sigma Green Belt and I & CIM Certification
Yes
No
Complete Project and
Submit Final Report
52
DMAIC Problem Solving Methodology: An
Overview
Define
Team
Chartering
Measure Analyze Improve Control
Customer
Focus
Process
Mapping
•The Business Case
•Definition of Quality
• Process Definitions
•Preliminary Problem
Statement
•Types of Customers
• Connecting the
Customer to Your Process
•Project Scope
•Deliverables
•Roles
•Translate Customer
Needs Into Specific
Requirements
•Methods of Collecting
Customer Requirements
•Voice of the Customer
Analysis
• Business Process
Mapping
• Mapping Guidelines
• Benefits and
Applications of Process
Mapping
53
DMAIC Problem Solving Methodology: An
Overview (cont.)
Define
Measurement
•Why Measure?
Measure Analyze Improve Control
Variation
Data
Collection
•Input/Output/
Process Measures
•Understand
Variation is the
Enemy
•Why, When, and
Where? Guidelines of
Data Collection
•Effective and
Efficiency Measures
•Common Cause/
Special Cause
•Understand
Qualitative and
Quantitative Data
•How to Collect Data
•Develop Data
Collection Plan
54
DMAIC Problem Solving Methodology: An
Overview (cont.)
Define
Data
Analysis
Measure Analyze Improve Control
Process
Analysis
And Focus
Root
Cause
Analysis
Quantify
Opportunity
•Read, Interpret,
and Construct
Visual Displays
of Data
•Moments of
Truth Analysis
•Cause & Effect
Analysis
•Determine
Opportunity
•Value-Added
Analysis
•Process Data
Collection (OnGoing)
•Verifying Root
Causes are Real
•Display/Packa
ge Opportunity
•Focus on Vital
Few Problems
•Charter
Revision
•Focus on Vital
Few Problems
55
DMAIC Problem Solving Methodology: An
Overview (cont.)
Define
Measure Analyze Improve Control
Generate
Solutions
Select
Solutions
•Solution Parameters
(Solution Statement &
Solution Criteria
•Validated Solution
•List of Possible
Solutions
•Business Proposal
for Improvement
•Cost/Benefit
Analysis
Implementation
Planning
•Project Planning
•Change
Management
Strategy
•“Should Be”
Process Map
•Piloting
56
DMAIC Problem Solving Methodology: An
Overview (cont.)
Define
Monitor the
Process
•Standards
•Control Charts
•Measurement Plan
Measure Analyze Improve Control
Documentation
Institutionalize
•Developing
Procedures
•Systems and
Structures
•Procedure Sheet
Template
•Problem-Solving
Structure
•Continuous
Improvement Attitude
57
200?
58
Results and Plan
Certification Status
100%
1.5
80%
1600
1500
1400
60%
7.9
1200
40%
1000
1000
14.5
20
25
0
0
2004
2005
20%
800
0%
600
400
246300
-20%
2002
200
45
0
2002
2003
-0.441
0
0
2004
2005
2003
Savings ($ Million)
59
Documents
60
Contract Sheet
Six Sigma Project Contract Sheet
Date (1)
Project Title (2)
Project Details (3)
06.03.2002
Decrease Total Quality Costs by % 7 in to 2007.
Decrease the one that will have biggest contribution.
Project Champion (5)
Project Team Leader (6)
Project Sponsor (7)
Team Members (8)
AB
CD
EF
G,H,I,J,K,L,M N
Business Case Addressed (4)
See the file "Presentation1.ppt"
Projected Savings (9)
$
250 000,00
Project Charter (10)
(in USD)
Key Deliverables (11)
Stage
1
Title (12)
Total Quality Costs
($/std hrs prd *100)
Start Level (13) Target Level (14) Date
92.42
Define
04.08.08
Measure
Analyze
Improve
05.06.08
06.03.08
07.15.08
85,95
Critical Milestones (15)
Complete project by September 2002
Customer/ Suppliers Who must be involved (16) Customer: Opel, Nissan, Renault, Fiat
"Must Dos in terms of the Project Scope (17) All Quality Costs
Supplier: Elopar (Board & Equipment supplier in Turkey)
Things Definitely Not in the Project Scope (18)
How the Project will be Measured (19)
Quality Cost Reporting System
How the Team will be Measured (20)
Meeting the Deliverables and Time Line
61
AB
CD
EF
GH
IJ
LM
Saving Sheet
X ICIM Project - Final Financial Summary
X ICIM Project - Initial Financial Summary
Enter Project Title:
Enter Team Leader(s):
Enter Month Savings Begin: e.g., June
Enter Project Title:
Enter Team Leader(s):
Enter Month Savings Begin: e.g., June
April
Input:
Input:
Number Rates
75,0%
Input:
Current Year Savings
Number
Total in $'000s
* Cost prompt available - see Regional Tab
Annual Savings
Total in $'000s
COST ITEMS
Manufacturing Expense
Hourly Labor Cost
1
Overtime Hours
1 904
Salary Employee Cost
1,0
Scrap (enter pieces x rate)
#######
Non-People Costs
SUBTOTAL
Quality Staff (Mfg. Expense)
Hourly Labor Cost
Overtime Hours
Salary Employee Cost
Outside Services
SUBTOTAL
PC&L
Freight
Hourly Labor Cost
Salary Employee Cost
Warehouse Costs
SILS Costs
SUBTOTAL
Material (Purchasing)
Cost Reduction
Cost Recovery
Hourly Labor Cost
Salary Employee Cost
SUBTOTAL
Engineering
Outside Services
Hourly Labor Cost
Salary Employee Cost
All Other Costs
SUBTOTAL
Selling, General & Admin.
Outside Services
IT costs
Hourly Labor Cost
Salary Employee Cost
SUBTOTAL
TOTAL COST ITEMS
Cash Flow Improvement
Accounts Receivable
Inventory
Other
TOTAL CASH FLOW
Reduction in Interest Expense
$1,50
33
24
65
150
0
272
0
0
0
25
18
49
113
0
205
*
*
*
*
0
0
0
0
*
*
*
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
*
0
0
0
0
0
0
0
272
6%
*
0
0
2 000
120
*
*
0
0
0
0
2 000
*
*
*
*
*
*
0
205
1 500
0
0
1 500
90
*
EXPENDITURES
Manufacturing Expense
Hourly Labor Cost
1
Overtime Hours
1 904
Salary Employee Cost
1,0
Scrap (enter pieces x rate)
#######
Non-People Costs
SUBTOTAL
Quality Staff (Mfg. Expense)
Hourly Labor Cost
Overtime Hours
Salary Employee Cost
Outside Services
SUBTOTAL
PC&L
Freight
Hourly Labor Cost
Salary Employee Cost
Warehouse Costs
SILS Costs
SUBTOTAL
Material (Purchasing)
Cost Reduction
Cost Recovery
Hourly Labor Cost
Salary Employee Cost
SUBTOTAL
Engineering
Outside Services
Hourly Labor Cost
Salary Employee Cost
All Other Costs
SUBTOTAL
Selling, General & Admin.
Outside Services
IT costs
Hourly Labor Cost
Salary Employee Cost
SUBTOTAL
TOTAL COST ITEMS
Cash Flow Improvement
Accounts Receivable
Inventory
Other
TOTAL CASH FLOW
Reduction in Interest Expense
For Year 2008
April
Input:
Rates
75,0%
Current Year Savings
Line Item Rationale
Total in $'000s
* Cost prompt available - see Regional Tab
Annual Savings
Total in $'000s
COST ITEMS
* Cost prompt available - see Regional Tab
$1,50
33
24
65
150
0
272
0
0
0
25
18
49
113
0
205
*
*
*
*
0
0
0
0
*
*
*
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
*
0
0
0
0
0
0
0
272
2 000
120
* Rate provided for contract employees
0
0
6%
*
*
0
0
0
0
2 000
*
*
*
* Rate provided for contract employees
*
*
0
205
1 500
0
0
1 500
90
*
EXPENDITURES
62