The U.S. E.P.A - Water Resources Program at Rutgers NJAES
Download
Report
Transcript The U.S. E.P.A - Water Resources Program at Rutgers NJAES
Watershed Planning
Tools and an
Integrated Watershed
Approach
Stuart Lehman
U.S. EPA NPS Control Branch
January 19, 2007
Bordentown, NJ
CWA Watershed Framework
Water Quality Standards
Use Attainability Analysis
Monitor/Assess WQS Attainment
Assessment methodology
305(b) Report
303(d) List of Impaired Waters
EPA approves 303(d) list
TMDL
WLAs to individual point sources
LAs to nonpoint sources
EPA approval
Continuing
Planning Process
Watershed Plan
State developed or approved
NPDES permits for point sources
Manage nonpoint sources
EPA discretion to object
w/ Federal/State $
(CPP)
Integrated Watershed Management
CZA 6217
Example or Program Integration
State Watershed Programs
State Watershed Programs
Watershed Mgmt. &
Typical Roles
Local
State
Federal
NPS Mgmt Plans
/ grants /
NPDES/TMDLs
EPA – WQ crit. &
MCLs, 319,
TMDLs
Monitoring – projects USDA – Farm
& statewide/ WQstds
Plans, Local
codes/ ordinances
Ctrl, EQIP, etc
Growth Mgmt Policies
Septic regs
– build out? Env.
USFS – MultipleAssess.
Watershed Plans
use/NEPA/
Land use/ zoning /
Stormwater
permits
USDA committees
Watershed Progs,
funds & T. Assist.
(incl 319)
ESA/Hydrol.
FWS – ESA habitat &
other habs
NINE Elements of Watershed-based
Plans that include Nonpoint Source Pollution
A. Identification of causes and sources, listed waters, pollutants,
B.
C.
D.
E.
F.
G.
H.
I.
loads by watershed sub-categories, (crops, AFOs, urban,
forestry, etc.)
Estimate of load reductions by land use (or other)
subcategories expected from BMPs
Description of BMPs, How they are targeted (map suggested)
Estimate of needed technical & financial resources
Information/ Education component
Schedule (who does what, when)
Description of measurable milestones for implementation
Criteria to determine if loadings/ targets are being achieved
Monitoring component for above criteria
Watershed
Planning Steps
STEP 1
BUILD PARTNERSHIPS
ID
stakeholders
ID issues of concern
Set preliminary goals
Develop indicators
Conduct outreach
Watershed
Planning Steps
STEP 2
CHARACTERIZE WATERSHED
Gather existing data
STEP 1
Create data inventory
BUILD PARTNERSHIPS
ID data gaps
ID stakeholders
Collect additional data, if needed
ID issues of concern
Set preliminary
goals
Analyze
data
Develop indicators
ID causes and sources
Conduct outreach
Estimate pollutant loads
Watershed
Planning Steps
STEP 3
FINALIZE GOALS AND ID SOLUTIONS
STEP 2
Set goals and management objectives
CHARACTERIZE
WATERSHED
Develop
indicators/targets
Gather
existing data
Determine load reductions needed
data
inventory
STEP 1
ID critical areas
ID data gaps
BUILD PARTNERSHIPS
Collect additionaldata,
if needed
ID management
measures needed
ID stakeholders
Analyze data
ID issues of concern
ID causes and sources
Set preliminary goals
Estimate pollutant loads
Develop indicators
Create
Conduct
outreach
Watershed Planning Steps
STEP 4
DESIGN IMPLEMENTATION
PROGRAM
k
Develop
Implementation schedule
STEP 3
Set Interim milestones
FINALIZE GOALS AND ID SOLUTIONS
Set
Determine
goals and management
objectives how
you will measure success
STEP 2
Develop indicators/targets
Develop monitoring component
CHARACTERIZE
WATERSHED
Determine load reductions needed
Gather
Develop
evaluation process
assistance needed
existing data
ID critical areas
ID needed
technical and financial
Create
data
inventory
ID management measures
STEP 1
ID data gaps
Assign responsibility
BUILD PARTNERSHIPS
Collect additional data, if needed
ID stakeholders
Analyze data
ID issues of concern
ID causes and sources
Set preliminary goals
Estimate pollutant loads
Develop indicators
Conduct
outreach
Watershed Planning Steps
STEP 5
IMPLEMENT WATERSHED PLAN
STEP 4
Implement management strategies
DESIGN IMPLEMENTATION PROGRAM
k
Conduct
Implementation
schedule monitoring
Set Interim milestonesConduct I/E activities
STEP 3
Determine how you will measure success
FINALIZE GOALSDevelop
AND ID
SOLUTIONS
monitoring
component
Set goals and management
objectives
Develop evaluation process
STEP 2
Develop indicators/targets
ID technical and financial assistance needed
CHARACTERIZE
WATERSHED
Determine
load reductions
needed
Assign
responsibility
Gather existing data
ID critical areas
Create data inventory
ID management measures needed
STEP 1
ID data gaps
BUILD PARTNERSHIPS
Collect additional data, if needed
ID stakeholders
Analyze data
ID issues of concern
ID causes and sources
Set preliminary goals
Estimate pollutant loads
Develop indicators
Develop
Conduct
outreach
Watershed Planning Steps
STEP 6
MEASURE PROGRESS
AND MAKE
STEP 5
IMPLEMENT WATERSHED
PLAN
ADJUSTMENTS
Implement management strategies
STEP 4
Review and evaluate information
Conduct monitoring
DESIGN IMPLEMENTATION PROGRAM
Share results
k
Conduct I/E activities
Implementation schedule
Prepare annual plans
Set Interim milestones
STEP 3
Make adjustments to
Determine how you will measure success
FINALIZE GOALSDevelop
AND ID
SOLUTIONS
monitoring component
Set goals and management
objectives
Develop
evaluation process
STEP 2
Develop indicators/targets
ID technical and financial assistance needed
CHARACTERIZE
WATERSHED
Determine
load reductions
needed
Assign
responsibility
Gather existing data
ID critical areas
Create data inventory
ID management measures needed
STEP 1
ID data gaps
BUILD PARTNERSHIPS
Collect additional data, if needed
Analyze data
ID stakeholders
ID causes and sources
ID issues of concern
Estimate pollutant loads
Develop
Set
preliminary goals
Develop indicators
Conduct outreach
program
Capacity Building
CB Strategy
Funding catalog - & New Sustainable Funding web
site - Cross Office Team
Smart Growth web site –Cross Office Team
Watershed Academy – online courses
Monthly Web casts – wetlands, drinking water, Smart
Growth
New Watershed Tools training
Watershed Handbook Training
Capacity Building Grants
Targeted Watersheds Funds
$1.6 -3.2 Million for FY2006/07
Geographic Focus Areas
(Arid West, Great Plains, Appalachia)
Up to 20% can be go to Mini-grants
Targeted Watershed Grants
… in addition to NEPs
… in addition to NPS 319
On the Technical Side
Watershed Handbook being updated
Working with grantees to develop technical tools
AGNPS with CONCEPTS (bank erosion element)
VA Tech
SWAT AG BMP Optimization (Auburn CES)
AV-GWLF Penn State model being applied to New England
Watersheds and Wetland Protection Guides
“Plan Builder” On-Line Tool
“Watershed Central”
Technical Analysis Challenges in
Planning addressed by our Handbook
GIS and geographic data
Statistical interpretation of data
Modeling and Spreadsheet tools
Defining the pollution reductions
from BMPs for Nonpoint Sources
Setting up a monitoring program
Evaluating changes due to management
A. Identification of causes and sources,
listed waters, pollutants, loads by
watershed sub-categories, (crops, AFOs,
urban, forestry, etc.)
Tools:
NEMO land use assessments
Watershed Model s–
SWAT / GWLF/ L-thia
BASINS, AGWA, CADDIS
WRAP
State GIS Clearinghouses
B. Estimate of load reductions by land use
(or other) subcategory expected from BMPs
Tools
Watershed models that incorporate BMPs
AGWA
GeoWEPP
BMP Research
WCS - R4
C. Description of BMPs and how they are
targeted (we suggest a map).
Tools
BMP
targeting
(Penn State tool set)
PreDICT
NPS
Tool
AvGWLF
Wisconsin
Buffer
Targeting
Models
USLE +
“SnapPlus”
D. Estimate of needed technical & financial
resources
Tools
Env
EPA Watershed
Funding Site
Sustainable
Finance Team
Finance Centers - MD, BSU, others
EPA Funding Web Site
Catalog of Federal Funding
E. Information/ Education component
Tools:
Getting
in Step
Adopt Your Watershed
Adopt Your Waterway
NPS Outreach Tool Box
F. Schedule (who does what, when)
Tools
:
Plan2Fund
State
guides
EPA Watershed Approach Guides
State and Local
G. Description of measurable milestones for
implementation
Tools:
Plan2Fund
319
Project work plans
Describes
what is to be done, by whom, and
when – interim “beans.”
H. Criteria to determine if loadings/ targets
are being achieved
Tools:
CADDIS
(EPA)
Rapid Bio-assessment Protocols
State WQStds and Assessment Methods
Wadeable streams,
lakes, rivers studies
Monitoring component for above criteria
I.
Tools:
Citizen Monitoring Guidance
LaMotte Chemical Company Monitoring
Guides
EPA Volunteer Monitoring News
National NPS Monitoring Program Case
Studies
State Cooperative Extensions
State 303(d) Assessment Guidelines
Stream Corridor Guide
Incorporation Wetlands into
Watershed Planning Process
(CWP) / EPA Project
3.1.3 Climate/Precipitation
Provide current and historic climate data for your watershed. Climate data provides
information that is critical in evaluating the hydrology of an area. Information about
temperature, rainfall, snowfall, and evapotranspiration, is used to simulate rainfall-runoff
processes in watershed models. Local climatological data helps one to better
understand the local water budget for the region and also helps for modeling purposes.
Section of
Annotated
Outline
Data Sources
Hyperlinks
Get/view online climate data
http://lwf.ncdc.noaa.gov/oa/climate/climatedata.html
National Weather Service
http:www.weather.gov/climate
3.1.5 Surface Water Resources
Identify all surface water features in the watershed. Surface water includes all water
that is naturally open to the atmosphere, such as lakes, rivers, seas and reservoirs. In
addition to being an important source of drinking water and recreation, these waters are
also vital parts of local and regional ecosystems. Surface water pollution can result from
a number of sources, including dredging, stormwater runoff, ocean dumping and
industrial wastewater discharges. Your state Department of Environmental Quality can
provide useful information on surface water, data inventory, maps and related issues.
Data Sources
Hyperlinks
Surface water
http://water.usgs.gov/osw
Surface Water
http://www.epa.gov/ebtpages/watesurfacewater.html
Search:
GO