City of Alamogordo Water Resources Outlook
Download
Report
Transcript City of Alamogordo Water Resources Outlook
Desalination Implementation
by the City of Alamogordo
Eddie C. Livingston, MSCE, P.E.
Livingston Associates
New Mexico Forum on Reclaiming Produced/Brackish Water
for Beneficial Use
Hobbs, NM
July 22, 2003
City of Alamogordo
Annual Water Supply and Demand 2000 - 2040
25,000
20,000
Acre-Feet
Annual Water Demand
Water Rights
15,000
Firm Supply
10,000
5,000
0
2000
2005
2010
2015
2020
Year
Livingston Associates
Consulting Engineers
2025
2030
2035
2040
Desal Alternative
Develop 6 MGD - 13 MGD of new peak
day water supply
Water quality to match spring source of
800 mg/L TDS
Utilize brackish groundwater reserves
and desalination treatment
Livingston Associates
Consulting Engineers
Livingston Associates
Consulting Engineers
Groundwater Availability
20 Million AF “recoverable” brackish
water TDS range of 1,000 - 4,000 mg/L
Over a 40 year period would use <2%
Well field pumping spread out along
mountain front - east of Highway 54 and
North of Tularosa
Livingston Associates
Consulting Engineers
Desal Feasibility Study
Desalination (RO) best option
Performed Pilot on well fields
Identified well field (BLM)
Preliminary environmental/cultural
Identified plant site (State)
Developed infrastructure plan
Estimated project costs
Livingston Associates
Consulting Engineers
Ground Water Quality
Primarily calcium-sulfate
TDS 65% to 90% of e-cond.
Sulfates 30% to 50% of TDS
Temp. 62F to 80F
pH 6.7 to 7.3
Livingston Associates
Consulting Engineers
RO Pilot Program
Pilot RO for 45 to 60 days at each site
Pilot 3 sites (1,500 mg/L; 2,500 mg/L and
3,500 mg/L TDS)
Pilot proposed well field of 2,200 mg/L TDS
Used irrigation well; 3 ph. power; water
rights; disposal of pilot water
Record operating conditions for cost analysis
Livingston Associates
Consulting Engineers
Mobile RO Pilot Unit
6 pressure vessels
18 ea. 4X40 elements
Feed flows to 25 GPM
50% - 85% recoveries
Up to 10,000 TDS
CIP system
press; e-con; TDS; pH
Office/lab
Livingston Associates
Consulting Engineers
Rosa del Sol RO Performance
Feed
TDS = 3,160 mg/L
Cl = 180 mg/L
SO4 = 1,730 mg/L
Hard = 1880 mg/L
Feed = 135 psi
Temp = 18.0C
MDC120 @12.3 ppm
Product
22 mg/L
5 mg/L
11 mg/L
8 mg/L
Recovery = 65%
Rejection = 99.4%
SDI = 0.56
Livingston Associates
Consulting Engineers
Villa del Sol RO Performance
Feed
TDS = 2,380 mg/L
Cl = 196 mg/L
SO4 = 1260 mg/L
Hard = 1520 mg/L
Feed = 110 psi
Temp = 21.2C
MDC150 @ 8.2 ppm
Product
70 mg/L
13 mg/L
21 mg/L
25 mg/L
Recovery = 72%
Rejection = 98.8%
SDI = 0.47
Livingston Associates
Consulting Engineers
Lazy/CT RO Performance
Feed
TDS = 1,480 mg/L
Cl = 255 mg/L
SO4 = 563 mg/L
Hard = 844 mg/L
Feed = 107 psi
Temp = 20.1C
MDC150 @ 3.1 ppm
Product
59 mg/L
17 mg/L
8 mg/L
9 mg/L
Recovery = 75%
Rejection = 98.5%
SDI = 0.78
Livingston Associates
Consulting Engineers
Snake Tank RO Performance
Feed
TDS = 2,220 mg/L
Cl = 147 mg/L
SO4 = 1,370 mg/L
Hard = 1,420 mg/L
Feed = 91 psi
Temp = 24.5C
MDC150 @14.3 ppm
Product
60 mg/L
24 mg/L
28 mg/L
42 mg/L
Recovery = 72%
Rejection = 99.6%
SDI = 0.72
Livingston Associates
Consulting Engineers
Snake Tank Site RO Pilot
Water Permeation Coefficient
40.00
35.00
30.00
Changed recovery
from 69% to 72%
20.00
15.00
Water Permeation Coeff.
10.00
5.00
Elapsed Time (Hours)
Livingston Associates
Consulting Engineers
93
4.
4
10
06
.5
10
55
.0
88
6.
5
83
9.
0
74
3.
0
69
5.
5
59
8.
2
55
6.
9
50
8.
2
47
6.
9
40
6.
4
33
2.
9
28
6.
4
23
7.
4
16
4.
9
11
7.
1
69
.6
0.00
0.
0
"A" Coeff.
25.00
Snake Tank Site RO Pilot
Salt Permeation Coefficient
2.50
2.00
1.50
Changed recovery
from 69% to 72%
1.00
0.50
Elapsed Time (Hours)
Livingston Associates
Consulting Engineers
93
4.
4
10
06
.5
10
55
.0
88
6.
5
83
9.
0
74
3.
0
69
5.
5
59
8.
2
55
6.
9
50
8.
2
47
6.
9
40
6.
4
33
2.
9
28
6.
4
23
7.
4
16
4.
9
11
7.
1
69
.6
0.00
0.
0
"B" Coeff.
Salt Permeation Coeff.
Snake Tank Site RO Pilot
Pressure Drop Coefficients
0.900
Changed
recovery from
69% to 72%
0.800
0.700
0.500
0.400
Delta P1 Coeff.
0.300
Delta P2 Coeff.
0.200
0.100
Elapsed Time (Hours)
Livingston Associates
Consulting Engineers
93
4.
4
10
06
.5
10
55
.0
88
6.
5
83
9.
0
74
3.
0
69
5.
5
59
8.
2
55
6.
9
50
8.
2
47
6.
9
40
6.
4
33
2.
9
28
6.
4
23
7.
4
16
4.
9
11
7.
1
69
.6
0.000
0.
0
Delta P Coeff.
0.600
Snake Tank RO Pilot Site
Net Driving Pressure
50.00
45.00
40.00
Net Driving Pressure
30.00
25.00
20.00
Changed recovery from
69% to 72%
15.00
10.00
5.00
Elapsed Time (Hours)
Livingston Associates
Consulting Engineers
5
0
10
06
.
10
55
.
93
4.
4
88
6.
5
83
9.
0
74
3.
0
69
5.
5
59
8.
2
55
6.
9
50
8.
2
47
6.
9
40
6.
4
33
2.
9
28
6.
4
23
7.
4
16
4.
9
11
7.
1
69
.6
0.00
0.
0
PNet (psi)
35.00
Wells/Plant Location
Facilities located 13 mi. N. of Tularosa
Located to provide gravity flow to Plant
and into Alamogordo (energy savings)
Wells on BLM and RO Plant on State
Water quality about 2,200 mg/L TDS
Infrastructure to Alamogordo allows
potential use by Tularosa, HAFB, etc.
Livingston Associates
Consulting Engineers
Livingston Associates
Consulting Engineers
RO Plant
Treat water down to <50 mg/L TDS
Blend other well water to produce
overall <800 mg/L TDS water
Approximate 60/40 blend
Operate by gravity pressure and some
feed pumping
Produce overall 84% recovery
Livingston Associates
Consulting Engineers
WELL BY-PASS
FOR BLENDING
PRE-FILTERS
TO DISTRIBUTION
RO
PERMEATE
RO ARRAY
HIGH PRESSURE
PUMP
POST-TREATMENT
CHEMICAL FEED
(ACID, SCALE
INHIBITOR)
BRINE
DISPOSAL
WELL
Livingston Associates
Consulting Engineers
Typical RO Skid
Livingston Associates
Consulting Engineers
Regional Partners
Supply potential other users
Tularosa
HAFB
La Luz
Other community water systems
Livingston Associates
Consulting Engineers
Project Costs
Phase 1 (2005 - 2015)
6 MGD
– Capital
$27M
– O&M
$0.65/1,000 gals
– Amortized $1.65/1,000 gals
– Total
$2.25/1,000 gals
– Modular construction for expansion
– Install ultimate infrastructure now
Livingston Associates
Consulting Engineers
Concentrate Disposal
Concentrate 8,000 mg/L TDS
Concentrate flow 16% of feed
Evaporation Ponds for disposal
Land application
Solids produced
Beneficial use
Livingston Associates
Consulting Engineers
Concentrate Evap Ponds
Livingston Associates
Consulting Engineers
Questions?
Livingston Associates
Consulting Engineers