New Vision Educational Classrooms for KZN

Download Report

Transcript New Vision Educational Classrooms for KZN

Presented by Ecosystems

(The official marketing agents for RH Construction)

RH Construction:

(Light Steel Frame - manufacture & fabrication specialists).

Amandla Resource Development:

(Renewable energy & project development specialists).

www.amandlaresources.com

Ecosystems:

( Marketing and training): www.ecosystems.co.za

Can you build all this in just 6- 12 weeks?

Which includes:-

◦ ◦ ◦ ◦ ◦ ◦ ◦ 2x classrooms (51m 2) , 1x ablution (7 Seater) 1x ECD Crèche (76m 2) 1x Soup Kitchen (18m 2 ) 1x Security Fence 1x Jungle Gym Paving and carports included (where specified)

      NHBRC approved Registered with the SA Light Steel Frame Building assoc.(SASFA) Licensed Scottsdale Construction fabricator LSF construction system AB/20/932 accepted by Agre’ment SA Registered with the Master Builders Assoc.

Approved and used by the Department of Education (EC) and IDT

        

Mobile Structures

Garages Site offices Ablutions Contractor’s Accom.

Crèche & ECD Centres Staff Cottages Security rooms Disaster Relief Houses       

Permanent Structures

Classrooms Grade R classrooms & Crèches Administration Offices Multi purpose centres Soup kitchens Toilets and Ablutions Security rooms Storage rooms

      Site Assessment Site levelling Erection of light steel framework Cladding in and out Cast concrete floors and aprons Electrical wiring and plumbing

       Fast erection all in one month Can be built in remote areas without power source Cooler than conventional buildings (good insulation). Less costly than conventional building Low cost of material delivery into remote sites No material theft on site No cracking due to poor soils

Cromodek Light Steel Frame roll forming machine Assembled in our factory by hand or Robotics for large-volume contracts

Steel frame structure constructed & clad with Nutec 9mm Fibrecrete board with an option of Nutec wood grain 10mm Cladding is Cromodek 0.58mm for exterior walls Other cladding options are wood grain finish board, interlocking laminated floor boards, dry wall OSB board interior walls which can be varnished or painted OSB board exterior which is then cladded with fibrecrete board

All permanent structures are clad as follows:  Exterior- OSB board (11 or 15mm) with fibrecrete sheeting (9mm) on top.

 Interior- OSB board (11 or 15mm) with Nutec fibrecrete sheeting (9mm) on top.

 Insulation option – polystyrene (90mm), sisalation or isotherm.

 All floors are reinforced concrete which is screeded and tiled with Marley 2mm tiles or ceramic option.

 Windows units are aluminium and are fitted with specialised anti theft units.

 PVC Gutters are fitted all round.

LSF Classroom construction .

Completed LSF Classroom

   Classroom with own storeroom (76m 2 ) Soup Kitchen (18m 2 ) Ablutions- Boys & girls (18m 2 )

Permanent ECD centre comes complete with storeroom Inside view of ECD centre with storeroom. Floors are tiles with 2mm Marley tiles.

Government spec. soup kitchen permanent structure (concrete floor).

Government spec. ablution - a permanent structure (3x6m) Septic tank system for ablutions 6000l tank ( comes with steel frame )

All Temporary structures are clad as follows:  Exterior- Chromadek steel (0.5mm) with pre painted surface.

 Interior- OSB board (11 or 15mm).

 Insulation option – sisalation or isotherm.

 All floors are shutterply 19mm ( can be carpeted or tiled).

  Windows units are aluminium and are fitted with specialised anti theft units.

Doors- Aluminium sliding door  PVC Gutters (optional extra if required).

All structures are fabricated in a factory which can be relocated to your site for larger projects. Structures are modular and in segments which are assembled on project site.

CNC production systems ensure high accuracy and consistent quality.

Supply of Solar PV systems for all the structures as an alternative to Eskom or where no grid connection is available.

These could include: • • • • • • Photo copiers (12v) Lighting (12v LED) Solar fans (12v) Solar 220v AC supply (if needed) Solar borehole pump for water supply Solar hot water Solar PV Working Diagram Solar PV roof mounted Units

               Teachers Accom.

Offices Storerooms Lock up garages Security Guard Units Tuck shops SMME Business Hubs Disaster relief housing Taxi ranks Maintenance sheds Locker-rooms Gymnasiums Libraries Laboratories Craft workshops

Official Opening of the School Complex in KwaZulu Natal by the Minister of Education.

Handing over ceremony of completed school-structures in Eastern Cape

Let us be your quick-build / quality-build partner!

www.ecosystems.co.za