Transcript Slide 1

Alenia Aeronautica
AleNET Project
Governance
Initiative Presentation
Data:
Summary
Context and Vision
 Alenet Project Overview
Alenet Structure and Streams
Cod. AT-PO-1103-02-A-1
2
Product Technologies Roadmap
•Aeronautical Platform
Systems of Systems
Integration
•Aircraft Integrated
Operative Environment
•Smart Structure
•Nanotechnologies
•Green Aircraft
•Multifunctional Embedded
Structure
•Advanced Structure
and Material
•Electrical Systems
•Health Management
•On Board Systems
2007
Cod. AT-PO-1103-02-A-1
2010
2015
3
2020
Enabling Technologies Roadmap
Integration
•Virtual validation of
process and
operation scenarios
•Physical and Virtual
Integrated Validation
•Full Lifecycle
Simulation
•Collaborative
Extended Enterprise
•High Power
Computing
•Multi-disciplinary
and Multi-physics
•Extended
Workflow
•Virtual Prototyping
& Testing
•Integrated DMU
CAE
2007
Cod. AT-PO-1103-02-A-1
2010
2015
4
2020
External and Internal Factors
Alenia Aeronautica is subjected to many external and internal factors
that push both toward new competitive positions and toward a
reorganization of the company value chain.
Exogenous factors
Endogenous Factors
• Concept of Extended Enterprise more and more
developed and asserted
• Alenia Aeronautica Multiplicity role according to the
various programs
• Global Collaborative Environment as necessity
• Significant increasing of activity plan
• Growing Competition from Emerging Countries
• Efficiency increasing in defense of the revenue
• R&D evolution:
• Necessity of evolution and optimization of the
supplier base
• Project Team more and more de-located
• Necessity to capitalize the know-how developed in
the engineering activities and in the production
processes
• “real-time” Collaboration
• Design and production new methodologies and
techniques
• Leveraging on the long period rate with the
customer
• Innovation with Federative team
• Intellectual Property Rights management inside the
Extended Enterprise
• Next 5 years plan: doubled revenues
• Offset as lever for market share increase
Cod. AT-PO-1103-02-A-1
5
Alenia Aeronautica Business Models
Alenia Aeronautica has to be flexible enough to support the following
business models
Integration between major item manufacturers
New partnership models (small prime)
•High volume of activities (design and fabrication) towards subcontractor
(collaborative engineering environment)
•Information consolidation for the certification for the prime
•Integration with the suppliers distributed at the global level (Russia, China,…)
•Sharing the Project documentation (e.g. share information on interfaced items)
•Sharing the information with the subcontractors of other major equipment
manufacturers
Integration with the clients as a prime contractor
Collaboration models with AMI more tight
•Management and consolidation of
the requirements demanded by
customers
•Evolution of the model of customer
collaboration towards value added
services (e.g. configuration,
operative documentation,…)
•Direct integration with the national client and reduction of the relationships
currently managed through the consortium
•Compliance with AER-00-00-6
Cod. AT-PO-1103-02-A-1
6
Summary
Context and Vision
 Alenet Project Overview
Alenet Structure and Streams
Cod. AT-PO-1103-02-A-1
7
Change Envelope and Approach
Alenet project is a turnaround project focused on designing and implementing an
extended enterprise operating model that guarantees every business role for Alenia
Aeronautica and that provides more value to their customers and partners
• Improve Concurrent Engineering
• Improve collaboration with clients,
partners and suppliers along whole
product lifecycle
• Optimize business processes by
leveraging on new ICT technologies
• Enable processes to improve
knowledge management
Process
• Standardize internal processes
and way of work
• Identify, collect and leveraging
on best practices (defined
internally and externally)
• Update internal methodologies
to best of breed
Progetto Alenet
3
CBM - Make or
Buy Strategico
1
Governance
2
BPR
5
System Integration
4
Change
Management
7
VPPS
6
PLM
8
Infrastrutture e
Sicurezza
Processi Cross-Funzionali
Cod. AT-PO-1103-02-A-1
Organization
• Identify organizational changes to
improve concurrence and external
collaboration
• Set specific organizational mechanism to
manage and to protect know how
Methodology
Alenet
Tools
Competence
• Identify optimum
skills profile
• Map current skills
situation
• Manage skills
gaps and plan the
transition
• Adjust internal ICT applications
to current market standards
• Put applications to support
collaboration and concurrence
• Guarantee a robust and effective vault
to manage product-related information
8
Application Field
The application field of the Alenet project is a sub-group of the product
lifecycle: the identified requirements (which are managed during the whole
lifecycle) are the input, the product delivered to the client is the output.
Application field
IT , HR , CFO
Sales&Marketing
PDT. DEFINITION
Cod. AT-PO-1103-02-A-1
Studi Avanz. e avamprogetto
Projecting / Operation
PRODUCT/ PROCESS DEVELOPMENT, PRODUCTION
9
SBUL
PDT. SUPPORT
Alenet Project Modules
Alenet operates on the core activities of the Product Lifecycle both directly
and through primary enabling factors (ICT Security and infrastructure
policies) following an approach structured per modules and phases
Cross-functional management of product/process technical doc.
Requirements management and performance achievement
Changes management
Project and Product Time and Costs Management
Product Set Ups: green + optional
Build Optimization
Make or Buy
Collaboration
Concurrency Model
Cod. AT-PO-1103-02-A-1
10
Alenet Model
Option Catalog
Certification
Customer
contract
Mapping Standard to
Serial Numbers
Program
Master Table
Program Steering
Investigations
Commissions
Customer
Delivery
Monitoring
Conformity
Decision
Applicability
As Contracted
Change Dossier




Deviations
Document / Content
Management
Program Management
Change control & Traceability
Workflow
Management
Change Orchestration
Requirement
Management
As Designed
As Planned
Resources
As Built
(As Delivered)
As Maintained
Collaboration
Product, Process & Resources Management
CAE
Management
CAD
Management
CAT
Management
CAM
Management
CAPP
Management
Knowledge
Management
Product / Simulation and Prototyping ( virtual & physical )
Network
Catia v4
Catia v5
Word
Excel
HMS CAPP
CASE
Et….
Creation Tools
Technology Infrastructure, System Integration
Cod. AT-PO-1103-02-A-1
11
Security /
Communication
Management
Summary
Context and Vision
 Alenet Project Overview
Alenet Structure and Streams
Cod. AT-PO-1103-02-A-1
12
Alenet Project Streams: CBM
The world’s most successful firms are becoming “specialized enterprises” focusing on a few critical
components
Componentized Enterprise
Specialized Enterprise
Internal Specialization
Enterprise
Optimized
Business Components
Business Components
Traditional Enterprise
Business
Unit
Optimized
Networked Enterprise
Silo 1
Silo 1
Silo 2
Silo 2
Silo 3
Silo 3
Business Functions
External
Partner
Business Functions
Internally Integrated
Industry Networked
External Specialization
Cod. AT-PO-1103-02-A-1
13
Executive Summary #4
Alenet Project Streams: BPR
M3
FEASABILITY
M5
CONCEPT
M7
M13
DEFINITION
DEVELOPMENT
Product Development
SERIES
Process Development
Support Development
Master Geometry
Design Principles
Space Allocation
Mock-up
Simulation Design Reference Base
Frontier
Models
Definition
Mock-up
Definition Dossier
Tooling Principles
Tooling Design
Numeric Command
Support Specification
Shop Floor
Instructions
Support Requirements
Support Elements Design
Support Elements Development
Support Processes (Conf Mngt, Review, etc …)
Integrated Project Teams (IPT)
Cod. AT-PO-1103-02-A-1
14
Alenet Project Streams: PLM
Configuration & Change Management
Digital Mock-up Management
Manufacturing Engineering
Digital Manufacturing Management
Cod. AT-PO-1103-02-A-1
15
Alenet Project Streams: VPPS
Virtual Product
Virtual Laboratory
Virtual Manufacturing
Virtual Utilization
Concept
Performance
Industrialization
Operation
Vision
Concept
High Power Computing
Cod. AT-PO-1103-02-A-1
Experience
Definition
Synthesis
Multi-disciplinary
Simulation
Manufacturing
Maintenance
Process, Data &
Knowledge Management
16
Recycling
Full Scale Testing
Alenet Project Streams: System Integration\Infrastructure
Unique point of information exchange
with partners/suppliers for technical
(engineering/manufacturing) data
TEMPI STANDARD
PLM
Legacy
Schematic,
wiring list, …
P/N and
electrical data
ERP
CONFIGURATION THROUGH
CHANGE MANAGEMENT
Mod STATUS:
DESIGNED
Legacy
Mod. STATUS:
EMBODIEMENT
AS TO BE BUILT
Legacy
CLASSIFICATION
SW code
AS DESIGNED
P/N
AS PLANNED
P/N, MBOM
Manuf. cycles
Assembly Cycles
NC part PGM
Legacy
3D / 2D parts
mod
Assembled S/N
•Assembled P/N
•Assembled SN
(parts and
equipment)
•Missing PN
•Outstanding
works
•Work orders
3D / 2D Tool
FUNCTIONAL
VIEW
Legacy
AS BUILT
Requirements
AS DELIVERED
Waiver/
Concession
PLANT AUTOMATION
SDM
CAE DATA
Key
CAE
Application
Output report
Models
View
Analysis input
conditions
Cod. AT-PO-1103-02-A-1
Data / information
17
Only master data are represented
Wrap-up
Conclusions
 In order to face successfully the incoming change of the
worldwide business model, Alenia is engaged in a
challenging evolution of technology and process
 This innovation is a mandatory requirement to sustain the
market competitiveness for a global player role pursued by
Alenia
 Alenet Project has been conceived in this perspective
through two main streams of:
• New Integrated PLM
• Virtual Prototyping and Testing
Cod. AT-PO-1103-02-A-1
18
Alenia Aeronautica
AleNET Project
Governance
Initiative presentation
Data: