Transcript Slide 1
30 YEARS OF EXPERIENCE
1981
Epsi LTD was established.
1986
Epsi LTD founded Epsi Marine which entered in the maritime sector.
1992
The company initiative its activities in the Air Conditioning and Industrial field.
1997
Epsi Ltd was restructed to Epsi s.a.
2002
New technical Representative office in Egypt.
2005
New technical Representative office in Thessalonica
2006
New owned building in Industrial park of Schisto.
Our Philosophy
Epsi has built its operational strategy on three principles: High quality Expanded life span of equipment that causes a strong brand loyalty After sales service support
All three principles compose a strong competitive advantage.
QUALITY
The objective of Epsi SA Quality System is to ensure products of high quality and excellent technical support to its customers.
The company’s quality control system has been reinforced in order to improve the product reliability and to increase customer’s satisfaction. European specifications CE mark.
Has been certified by BVQI.
Awarded with ISO 9001:2008.
Russian Certificate GOST-R
Our Trades
•
HVAC
•
INDUSTRIAL REFRIGERATION & AIR CONDITIONING
Our expertise in HVAC & Industrial Refrigeration
Health Food & beverages Hotels Chemical Steel Plastic Print Marine Ice skating
Our Customers
Worldwide
Worldwide
Our Products
Air-Conditioning:
Air Handling Units EAHU Series Monoblock Air handling Units EDA Series High static Fan coils EFCU Series Industrial Dehumidifiers AAD Series Water Cooled Air Conditioners For Marine Applications EWP Series Air Cooled Water Chillers & Heat Pumps EAWC/H Series Air Cooled Water Chillers with Screw Compressors ESAC Series Rooftop Packaged Units ERT Series Water Cooled Water Chillers(Marine Applications) ESWC Series
Our Products
Industrial Refrigeration:
Air Cooled Water Chillers with Screw Compressors ESAC Series Air Cooled Water Chillers VARIO & VRT Series Air Cooled Water Chillers EAWC Series
Production Line
A.
Metal Construction Process
Basic & Detailed Design Drawings are transmitted electronically to the CNC machine: Cutting & Punching of the metal parts. Perforation and Cutting of metal sheet.
The CNC press machine gives the final configuration.
B.
Dyeing Process
Dislubrication-iron phosphatese process. Electrostically painted with robotic system. Using polyester powder of high resistance, suitable for protection from exterior conditions.
Production Line
Insulation Process for the
Air Conditioning units
The steel sheets are transferred to the polyurethane machine.
For the shipping sector: The steel sheets are transferred to the Mineral Wool Dpt.
Production Line
Cooling Dpt.
Assembly of the important raw materials: Compressors, evaporators, condensers, fans etc.
Experienced technicians assemble the cooling circuits.
Test of the circuits with nitrogen pressure.
Control of leakage.
Electrical Dpt.
Construction and assembly of electrical boards through analytical drawings.
Placement of the boards to the chillers.
Perform all the necessary connections.
Production Line
Test Room
Grounding test.
Vacuum. Programming the controllers Filling with refrigerant ( R407C, R404A, R134a, R410A). The chillers operating at full capacity .
Check the total efficiency .
Safety devices adjustment and check. Leakage control of the refrigerant circuits.
After Sales service
High skilled engineering team offers full satisfaction to customers with its after sales services.
Provides full support for 365 days of the year.
Scheduled Preventive maintenance services.
Telephone technical support.
Direct intervention in the customer’s premises.
Telematic diagnosis.