May 2006
GROWTH OF INSTALLED GENERATING CAPACITY (MW)
124287
107973
113256
79470
Hydro
63290
Nuclear
42585
Thermal *
28448
16604
2695
4653 9027
1362
Year
Hydro
Nuclear
Thermal *
Dec-47 Dec-55 Mar-61 Mar-66 Mar-74 Mar-80 Mar-85 Mar-90 Mar-95 Mar-03 Sep-04 Mar-06
508
940
1917
4124
6905
11384
14460
18308
20506
26910
29676
32326
0
0
0
0
640
640
1095
1565
1720
2720
2720
3360
854
1755
2736
4903
9059
16424
27030
43417
57244
78343
80860
88601
* - Includes Wind Capacity
Installed Capacity
Nuclear
3360 MW
Hydro
32325.77 MW (26%)
Renewables
6190 MW
Thermal
82410.54 MW (66%)
(Coal 68518)
Thermal
Hydro
Nuclear
Renewables
Plant Load Factor Of Thermal Stations
80
PLF % --->
75
72.34
67.47
70
68.74
72.96
74.82
73.6
69.97
64.56
65
60
55
1998- 199999
00
2000- 2001- 2002- 200301
02
03
04
2004- 200505
06
PLF - Some Highlights
500 MW Group
250 MW Group
Central Sector
>84 %
>90 %
>82%
Growth In Unit Size/Parameters
Unit
Size
(MW)
Yr of
Introduction
MS Pr
kg/cm2
MS /RH
Temp (o C)
< 30
100
210
1950
42
455
1970
90
535
130 &150
535/535
500
660
1984
170
538/538
Under Const.
247
535/566
1977 & 1983
Capacity Addition Targets
Figs in MW
Hydro
Thermal
COAL
Nuclear Total
OTHERS
2007-12
XI Plan
18781 40220 6343
3160
68504
2012-17
XII Plan
20000 30000 10000
6000
66000
Drivers For Ultra Mega
Power Projects
 LARGE CAPACITY ADDITION PLANNED OVER
NEXT DECADE IN 11TH PLAN BEYOND
 PACE OF THERMAL CAPACITY ADDITION TO
INCREASE FROM ~ 5000 MW/Yr TO ~ 10,000 MW/Yr
 ADVANCED PROVEN TECHNOLOGY WITH HIGH
EFFICIENCY FOR
OPTIMAL USE OF RESOURCES – HIGHER
EFFICIENCY
ECOFRIENDLY POWER GENERATION
ECONOMY OF SCALE
OPERATIONAL FLEXIBILITY( Faster Start Up, Load
Cycling)
Concept Of
Ultra Mega Power Project
• A FEW PRE-IDENTIFIED PROJECTS EACH WITH A
CAPACITY OF ABOUT 4000 MW ENVISAGED– ABOUT 7
NOS. AT PRESENT
–
–
–
–
–
–
–
SASAN, MP
AKALTARA, CHATTISGARH
MUNDRA, GUJARAT
GIRYE, MAHARASTHRA
TADRI, KARNATAKA
ORISSA – PITHEAD
ANDHRA PRADESH - COASTAL
PIT HEAD
COASTAL
UNDER
CONSIDERATION
• USE OF LARGE UNIT SIZES OF 600 MW & ABOVE
SUPERCRITICAL TECHNOLOGY
• FIRST FIVE TARGETTED FOR FINALISATION BY 31ST DEC.
2006
• PIT HEAD STATIONS WOULD HAVE COAL BLOCKS
ALLOCATED WITH CAPTIVE MINING
Road Map For Implementation Of
Ultra Mega Power Projects
• POTENTIAL SITES IDENTIFICATION AND
SELECTION BY CEA THROUGH SATELLITE
IMAGING, VISITS AND INTEGRATION WITH
STATE AND LOCAL AGENCIES.
• SEPARATE SPV FOR EACH PROJECT FOR
PROJECT DEVELOPMENT.
• PFC IDENTIFIED AS NODAL AGENCY FOR
SETTING UP OF SHELL COMPANIES.
-------- CONTD.
• SHELL COMPANIES TO TAKE FOLLOWING
ACTION
- PREPARATION OF PROJECT REPORT
- INITIAL LAND ACQUISITION
- COAL LINKAGES/COAL BLOCKS ALLOCATIONS FOR
PIT HEAD PROJECTS
- ALLOCATION OF WATER
• SHELL COMPANIES TO APPOINT CONSULTANTS
FOR ICB BID DOCUMENT PREPARATION &
EVALUATION.
• SELECTION OF DEVELOPER THROUGH TARIFF
BASED ICB.
• SHELL COMPANIES THEN TO BE TRANSFERRED
TO THE SUCCESSFUL BIDDER FOR PROJECT
EXECUTION.
Formation Of Shell Companies
FIVE SPV (SHELL COMPANIES) FORMED ARE :
1.
SASAN POWER LIMITED (M.P.)
2.
COASTAL GUJARAT POWER LIMITED (MUNDRA PORT)
3.
COASTAL MAHARASHTRA MEGA POWER LIMITED.
4.
COASTAL KARNATAKA POWER LIMITED.
5.
AKALTARA POWER LIMITED (CHATTISGARH)
•
•
•
STATE GOVTS. HAVE BEEN REQUESTED BY MOP TO
PROVIDE NECESSARY SUPPORT.
MINISTRY OF COAL HAS AGREED IN-PRINCIPLE TO
ALLOCATE COAL BLOCKS, FOR PITHEAD STATIONS.
ADDITIONAL PIT HEAD SITE IN ORISSA AND COASTAL IN
ANDHRA PRADESH BEING EXPLORED.
Current Status Of Ultra Mega
Projects.
• FIVE SHELL COMPANIES FORMED.
• EOI ISSUED FOR SADAV, MUNDRA, GIRYE
& TADRI.
• TECHNICAL CONSULTANTS APPOINTED BY
SHELL COS. FOR PREPARATION OF
PROJECT REPORTS.
• CONSULTANT
APPOINTED
FOR
BID
DOCUMENTS AND BIDDING PROCESS.
• POWER ALLOCATION/POWER PURCHASE
AGREEMENTS ARE BEING FINALISED.
Use Of
Super Critical Technology
• Supercritical Technology is widely established and
accepted with more than 500 units in operation.
• Widely prevalent cycle parameters:
– Pressure: 246 -250 kg/cm2
– Temperature: 538/538 deg C
»
538/566 deg C (Sipat & Barh TPS)
»
566/593 deg C (Mainly in Japan &
Germany)
»
593/593 or 600/600 deg C
• Preferred steam parameters include higher steam
temp. of 566 to 593 deg C depending upon site specific
techno-economics. BHEL collaboration includes these
parameters.
Contd.
•Besides Ultra Mega Power Projects Supercritical
Units envisaged for following projects:1.
Lara TPS,NTPC
3x800 MW
Chattisgarh
2.
Ib Valley – Daripalli,
NTPC
2x800 MW
Orissa
3.
Barh TPS, NTPC
2x800 MW
Bihar
4.
Krishnapattanam
2x800 MW
AP
5.
More Future projects
Expected Efficiency Range
Tur.
HR
Case-I Turbine
Heat Rate =1904
as Quoted for 660
MW & parameters
at @
Case-II Turbine
Heat Rate =1880
as per BHEL for
660 MW &
parameters at @
1904
1880
Parameters
Parameters
247/535/566@
247/566/592
Blr
Eff
Gross Gross
HR
Eff
88%
2164
39.75
%
86%
2214
38.84
%
88%
2147 40.06
%
86%
2197 39.15
%
Tur.
HR
1879
1855
Blr
Eff
Gross Gross
HR
Eff
88%
2135
40.28
%
86%
2180
39.45
%
88%
2108 40.79
%
86%
2157 39.87
%
•Efficiency figures are on HHV basis and 100% load conditions
•86% boiler efficiency is assumed for Indian coal and 88% for
Imported coal
List Of Foreign Suppliers For
Supercritical Units
BOILER
STEAM TURBINE
1.Alstom, France.
2.MHI, Japan.
3.IHI, Japan.
4.Hitachi-Babcock, Japan.
5.Ansaldo, Italy.
6.TKZ, Russia.
7.Doosan, S. Korea.
8.Foster Wheeler, US.
9.Babcock & Wilcox, US.
10.Chinese (SEC, Dengfong,
Harbin).
1.Alstom, France.
2.MHI, Japan.
3.Siemens, Germany.
4.Ansaldo, Italy.
5.Hitachi, Japan.
6.Toshiba, Japan.
7.GE, USA.
8.Doosan, S. Korea.
9.Chinese (SEC, Dengfong,
Harbin).
10.Russian (Power Machines)
Option of using Washed Coal
• Indigenous coal generally have high ash content, wide
variation in calorific value, presence of extranous
matter and is unsized.
• Considering large unit size, it is desirable to have good
and consistent coal quality, free of extraneous matter
with a view to
– Narrow down coal design range
– Less wear and tear of coal handling and coal
pulverizers
– Reduced teething problems in initial stage of
technology introduction
– Comfort in plant operation
CONCLUSION
• A MAJOR SHARE OF CAPACITY ADDITION EXPECTED
THROUGH LARGE SUPERCRITICAL UNITS IN ULTRA
MEGA PROJECTS AND OTHER 800 MW SIZE UNITS BY
NTPC, APGENCO & OTHER UTILITIES.
• HIGHER STEAM PARAMETERS IN SUPERCRITICAL UNITS
PREFERRED FOR BETTER EFFICIENCY.
• FOR OVERALL ECONOMICS, PITHEAD STATIONS CAN BE
INTEGRATED WITH COAL WASHING AND CFBC UNIT TO
USE WASHERY REJECTS.
• DESIRABLE TO HAVE TECHNOLOGY TRANSFER WITH
INDIGENOUS MANUFACTURING CAPACITY BUILDING TO
MEET THE PROJECTED CAPACITY ADDITION TARGETS
WITH ADEQUATE COMPETITION.