Transcript Slide 1
Presentation on Ultra Mega & Super Critical Projects Organized By FICCI & MOP May 2006 GROWTH OF INSTALLED GENERATING CAPACITY (MW) 124287 107973 113256 79470 Hydro 63290 Nuclear 42585 Thermal * 28448 16604 2695 4653 9027 1362 Year Hydro Nuclear Thermal * Dec-47 Dec-55 Mar-61 Mar-66 Mar-74 Mar-80 Mar-85 Mar-90 Mar-95 Mar-03 Sep-04 Mar-06 508 940 1917 4124 6905 11384 14460 18308 20506 26910 29676 32326 0 0 0 0 640 640 1095 1565 1720 2720 2720 3360 854 1755 2736 4903 9059 16424 27030 43417 57244 78343 80860 88601 * - Includes Wind Capacity Installed Capacity Nuclear 3360 MW Hydro 32325.77 MW (26%) Renewables 6190 MW Thermal 82410.54 MW (66%) (Coal 68518) Thermal Hydro Nuclear Renewables Plant Load Factor Of Thermal Stations 80 PLF % ---> 75 72.34 67.47 70 68.74 72.96 74.82 73.6 69.97 64.56 65 60 55 1998- 199999 00 2000- 2001- 2002- 200301 02 03 04 2004- 200505 06 PLF - Some Highlights 500 MW Group 250 MW Group Central Sector >84 % >90 % >82% Growth In Unit Size/Parameters Unit Size (MW) Yr of Introduction MS Pr kg/cm2 MS /RH Temp (o C) < 30 100 210 1950 42 455 1970 90 535 130 &150 535/535 500 660 1984 170 538/538 Under Const. 247 535/566 1977 & 1983 Capacity Addition Targets Figs in MW Hydro Thermal COAL Nuclear Total OTHERS 2007-12 XI Plan 18781 40220 6343 3160 68504 2012-17 XII Plan 20000 30000 10000 6000 66000 Drivers For Ultra Mega Power Projects LARGE CAPACITY ADDITION PLANNED OVER NEXT DECADE IN 11TH PLAN BEYOND PACE OF THERMAL CAPACITY ADDITION TO INCREASE FROM ~ 5000 MW/Yr TO ~ 10,000 MW/Yr ADVANCED PROVEN TECHNOLOGY WITH HIGH EFFICIENCY FOR OPTIMAL USE OF RESOURCES – HIGHER EFFICIENCY ECOFRIENDLY POWER GENERATION ECONOMY OF SCALE OPERATIONAL FLEXIBILITY( Faster Start Up, Load Cycling) Concept Of Ultra Mega Power Project • A FEW PRE-IDENTIFIED PROJECTS EACH WITH A CAPACITY OF ABOUT 4000 MW ENVISAGED– ABOUT 7 NOS. AT PRESENT – – – – – – – SASAN, MP AKALTARA, CHATTISGARH MUNDRA, GUJARAT GIRYE, MAHARASTHRA TADRI, KARNATAKA ORISSA – PITHEAD ANDHRA PRADESH - COASTAL PIT HEAD COASTAL UNDER CONSIDERATION • USE OF LARGE UNIT SIZES OF 600 MW & ABOVE SUPERCRITICAL TECHNOLOGY • FIRST FIVE TARGETTED FOR FINALISATION BY 31ST DEC. 2006 • PIT HEAD STATIONS WOULD HAVE COAL BLOCKS ALLOCATED WITH CAPTIVE MINING Road Map For Implementation Of Ultra Mega Power Projects • POTENTIAL SITES IDENTIFICATION AND SELECTION BY CEA THROUGH SATELLITE IMAGING, VISITS AND INTEGRATION WITH STATE AND LOCAL AGENCIES. • SEPARATE SPV FOR EACH PROJECT FOR PROJECT DEVELOPMENT. • PFC IDENTIFIED AS NODAL AGENCY FOR SETTING UP OF SHELL COMPANIES. -------- CONTD. • SHELL COMPANIES TO TAKE FOLLOWING ACTION - PREPARATION OF PROJECT REPORT - INITIAL LAND ACQUISITION - COAL LINKAGES/COAL BLOCKS ALLOCATIONS FOR PIT HEAD PROJECTS - ALLOCATION OF WATER • SHELL COMPANIES TO APPOINT CONSULTANTS FOR ICB BID DOCUMENT PREPARATION & EVALUATION. • SELECTION OF DEVELOPER THROUGH TARIFF BASED ICB. • SHELL COMPANIES THEN TO BE TRANSFERRED TO THE SUCCESSFUL BIDDER FOR PROJECT EXECUTION. Formation Of Shell Companies FIVE SPV (SHELL COMPANIES) FORMED ARE : 1. SASAN POWER LIMITED (M.P.) 2. COASTAL GUJARAT POWER LIMITED (MUNDRA PORT) 3. COASTAL MAHARASHTRA MEGA POWER LIMITED. 4. COASTAL KARNATAKA POWER LIMITED. 5. AKALTARA POWER LIMITED (CHATTISGARH) • • • STATE GOVTS. HAVE BEEN REQUESTED BY MOP TO PROVIDE NECESSARY SUPPORT. MINISTRY OF COAL HAS AGREED IN-PRINCIPLE TO ALLOCATE COAL BLOCKS, FOR PITHEAD STATIONS. ADDITIONAL PIT HEAD SITE IN ORISSA AND COASTAL IN ANDHRA PRADESH BEING EXPLORED. Current Status Of Ultra Mega Projects. • FIVE SHELL COMPANIES FORMED. • EOI ISSUED FOR SADAV, MUNDRA, GIRYE & TADRI. • TECHNICAL CONSULTANTS APPOINTED BY SHELL COS. FOR PREPARATION OF PROJECT REPORTS. • CONSULTANT APPOINTED FOR BID DOCUMENTS AND BIDDING PROCESS. • POWER ALLOCATION/POWER PURCHASE AGREEMENTS ARE BEING FINALISED. Use Of Super Critical Technology • Supercritical Technology is widely established and accepted with more than 500 units in operation. • Widely prevalent cycle parameters: – Pressure: 246 -250 kg/cm2 – Temperature: 538/538 deg C » 538/566 deg C (Sipat & Barh TPS) » 566/593 deg C (Mainly in Japan & Germany) » 593/593 or 600/600 deg C • Preferred steam parameters include higher steam temp. of 566 to 593 deg C depending upon site specific techno-economics. BHEL collaboration includes these parameters. Contd. •Besides Ultra Mega Power Projects Supercritical Units envisaged for following projects:1. Lara TPS,NTPC 3x800 MW Chattisgarh 2. Ib Valley – Daripalli, NTPC 2x800 MW Orissa 3. Barh TPS, NTPC 2x800 MW Bihar 4. Krishnapattanam 2x800 MW AP 5. More Future projects Expected Efficiency Range Tur. HR Case-I Turbine Heat Rate =1904 as Quoted for 660 MW & parameters at @ Case-II Turbine Heat Rate =1880 as per BHEL for 660 MW & parameters at @ 1904 1880 Parameters Parameters 247/535/566@ 247/566/592 Blr Eff Gross Gross HR Eff 88% 2164 39.75 % 86% 2214 38.84 % 88% 2147 40.06 % 86% 2197 39.15 % Tur. HR 1879 1855 Blr Eff Gross Gross HR Eff 88% 2135 40.28 % 86% 2180 39.45 % 88% 2108 40.79 % 86% 2157 39.87 % •Efficiency figures are on HHV basis and 100% load conditions •86% boiler efficiency is assumed for Indian coal and 88% for Imported coal List Of Foreign Suppliers For Supercritical Units BOILER STEAM TURBINE 1.Alstom, France. 2.MHI, Japan. 3.IHI, Japan. 4.Hitachi-Babcock, Japan. 5.Ansaldo, Italy. 6.TKZ, Russia. 7.Doosan, S. Korea. 8.Foster Wheeler, US. 9.Babcock & Wilcox, US. 10.Chinese (SEC, Dengfong, Harbin). 1.Alstom, France. 2.MHI, Japan. 3.Siemens, Germany. 4.Ansaldo, Italy. 5.Hitachi, Japan. 6.Toshiba, Japan. 7.GE, USA. 8.Doosan, S. Korea. 9.Chinese (SEC, Dengfong, Harbin). 10.Russian (Power Machines) Option of using Washed Coal • Indigenous coal generally have high ash content, wide variation in calorific value, presence of extranous matter and is unsized. • Considering large unit size, it is desirable to have good and consistent coal quality, free of extraneous matter with a view to – Narrow down coal design range – Less wear and tear of coal handling and coal pulverizers – Reduced teething problems in initial stage of technology introduction – Comfort in plant operation CONCLUSION • A MAJOR SHARE OF CAPACITY ADDITION EXPECTED THROUGH LARGE SUPERCRITICAL UNITS IN ULTRA MEGA PROJECTS AND OTHER 800 MW SIZE UNITS BY NTPC, APGENCO & OTHER UTILITIES. • HIGHER STEAM PARAMETERS IN SUPERCRITICAL UNITS PREFERRED FOR BETTER EFFICIENCY. • FOR OVERALL ECONOMICS, PITHEAD STATIONS CAN BE INTEGRATED WITH COAL WASHING AND CFBC UNIT TO USE WASHERY REJECTS. • DESIRABLE TO HAVE TECHNOLOGY TRANSFER WITH INDIGENOUS MANUFACTURING CAPACITY BUILDING TO MEET THE PROJECTED CAPACITY ADDITION TARGETS WITH ADEQUATE COMPETITION.