ACHIEVEMENTS OF MINISTRY OF WATER RESOURCES, RIVER

Download Report

Transcript ACHIEVEMENTS OF MINISTRY OF WATER RESOURCES, RIVER

MINISTRY OF WATER
RESOURCES,RIVER
DEVELOPMENT &GANGA
REJUVENATION
13-5-2015
Priorities of Ministry
Inter linking
Category 1
•
Ken Betwa
•
Mahanadi
•
Sapta Kosi
•
Karnali
•
Jammu Tabi Lake
•
Middle Siang Projects
Category 2
•
Daman Ganga pinjal
•
Par Tapi narmada
•
Polavaram
AIBP
•
DRIP Irrigation( Haryana ,UP particularly)
•
Ganga Rejuvenation( Role of AIBP,FMP,CWC,CGWB)
FMP
•
Kedar Nath
•
Mirzapur
•
Majauli
Jal Kranti Abhiyan
Ganga – Our Priority
Ganga Rejuvenation
Priorities/Focus Areas
WATER RESOURCE
•
•
•
•
•
•
•
•
•
•
•
•
•
Abetment of Pollution(Arsenic)
Jal Kranti Abhiyan
Development of Ground Water Resources
Development of water resources data base
Disaster Management and Dam Safety
Flood control through flood forecasting system
Completion of Flood Management Program(FMP)
Taking up new projects under FMP at Mirzpur,Kedarnath, Majauli
DRIP Irrigation Method(UP,Haryana particularly)
Integration of role of AIBP,FMP,CWC,CGWB for Ganga Rejuveanation
Establishment of Pancheswar Multipurpose Project
Release of funds to alrady approved projects under AIBP
Fixing of priority, timelines for each activities of Ministry including public
benefit components
Priorities/Focus Areas-Contd
RIVER DEVELOPMENT
• Inter-linking of Rivers(Ken Betwa,Daman Ganga
Pinjal,Par Tapi Narmada & Mahanadi Godavari Link
Projects)
• Revival of National Projects(Gosikhurd etc)
• Release of funds to Polavaram Project
• Preparation of Siang Middle Project
GANGA REJUVENATION
• Better Coordination with status and GIU at states
• Expediting work Plan and works
Inter linking of Rivers
• NWDA with the concurrence of concerned
states undertaken the preparation of DPR
of agreed links
• DPR for Ken Betwa Link Phase-I&II and
Daman Ganga Pinjal link completed
• DPR for Par Tapi Narmada link is under
progress. Will be submitted
• A Task Force also Constituted on Interlinking, three meetings held.
Inter linking of Riversissues/constrants
• Preparation of DPR of linking projects can be
taken only after consensus among concerned
states
• Clearance from various appraisal agencies such as
MoE&F, MoTA
• Investment clearance by NITI AYOG & Techno
economic clearance by TAC of Ministry
• Projects to be implemented either through state
Govt funds or by financial assistance by MOWR
under AIBP or by other agencies.
Abetment of Arsenic contamination:
Issues/Constraint
PRIORITY
• Preparation of comprehensive project on
Arsenic mitigation for whole country
• IMG constituted under MD, NWM
• COS meeting on 14.05.2015
Development of Ground Water
Resources: Issues/constraints
• “Web based system for Receipt and Issuing of
NOC by Central Ground Water Authority to
Abstract Ground Water” for Integration with e-Biz
Portal already functioning under NAQUIM.
• Data gap analysis completed for an area of 5.89
lakh sq.km. in Aquifer mapping programme.
• Ground water recharge and Arsenic mitigation
along Ganga basin: Action Plan for pilot under
preparation
• Constraints: Only 93 crore funds available
AIBP- Issues/Constraints
• Budget of the Ministry has been drastically
cut, Only Rs 1000 crore available for National
Projects and MMI Scheme
• PMKSY- Rs 1000 crore available for
CADWM,RRR & MI and other schemes
proposed by state including Ground Water
• Funding pattern being finalized
• No money for Ken Betwa interlinking, Siang
Middle , Lakhwar,Renuka, Kishau Projects
JAL Kranti Abhiyan- Issues/constraints
 To be launched from 15th May 2015.Guidelines
under submission.
 Development of model command area
Flood Management Programme
• Funds for the approved proposals will be
released on priority
• Release will be proportioned within allocated
BE of Rs 200 crore
• A cushion of Rs 50 crore for flood protection
works on Ganga from Mirzapur to Varanasi
and emergent works on Jhelum will be kept
• Constraints: Insufficient funds
Flood Forecasting
• CWC started flood forecasting in J&K at
Rammunshibagh on Jhelum near Srinagar.
• New flood forecasting web site launched for
timely dissemination of flood data.
• Suitable advisories issued to States during
unprecedented floods and very severe
cyclonic storms (HUDHUD and NILOFER).
• Regional office of GFCC opened at Lucknow
for better coordination.
Polavaram Projects
• Notification of Polavaram Project Authority
issued.
• Rs. 250 crore released for Polavaram Project
• A CEO and other senior officers appointed.
First meeting of the Polavaram River Project
held in March 2015
• Constraints: Investment clearance from NITI
AYOG for revised cost
PANCHESHWAR PROJECT
• Pursuant to Article 10 of Mahakali Treaty, Indo
Nepal Pancheshwar Development Authority
(PDA) for implementation of Pancheshwar
Multipurpose project set up. Two meetings of
its Governing Body have been held
• 3+DPR under preparation by WAPCOS
• Constraints: Finalization of funding pattern &
involvement of Nepalese side in DPR
Siang Middle Projects
• A cumulative basin impact study for Siang subbasin of Brahmaputra basin carried out and
master plan based strategy on hydro
development was developed paving way for
development of 17,800 MW hydropower
• Meeting with Chief Minister of Arunachal
Pradesh held in April 2015
Constraints: No funds for this project in this year
E Governace Iniatives
• Handy pocket books highlighting the achievements of
Ministry launched by Hon’ble Minister on 18.4.2015.
• E Book uploaded on website
• Online portal for grant of NOC for extraction of ground
water started
• E procurement hands on training organized in
association with NIC
• Web based water resources information system on GIS
platform – India-WRIS was maintained. Unclassified
data of CWC and CGWB placed on portal for public
access.