Transcript Slide 1
Organizational Chart of Electricity Department of UT of D&NH Hon. Administrator Secretary (Power) I/c E.E.(L& V) Shri B.P.Patel I/c E.E.(Dist) Shri H.M.Patel I/c D.E.(Trans) I/c D.E.(V&L) J E 1 No I/c D.E(comm) I/c E.E.(Trans) Shri B.R.Tamboli Ministerial staff H.C Comm.Acct J E 2 No I/c D.E.(NZ-I)/II J E 5 Nos I/c D.E.(SZ/ASW) J E 2 Nos I/c D.E.(Proj) J E 1 No 2 BASIC FACTS 100% electrification of all the villages. 09 Sub-stations of 66/11 KV 02 Sub-stations of 220/66 KV. Industrial Load (HT/LT) - 97%. 3 Consumer’s Profile Sr. No. Particulars 1. Domestic 2. Commercial 3. Agriculture 4. L.T. Industry 5. H.T. Industry 6. Public Lighting 7. LIG (Low Income Group) TOTAL Nos. of Consumers up to March-2012 Percentage (%) 34170 6852 57.39 11.51 1048 2306 830 227 14110 1.76 3.87 1.39 0.38 23.70 59543 100 4 Category Wise Consumption Unit Sold ( 2011-12 ) Percentage (%) Domestic 56.22 1.326 Commercial 27.81 o.656 Ind(LT) 152.19 3.59 Ind(HT) 3990.2 94.17 Agri & Poultry 3.0 0.0708 P.L 5.12 0.12 Temp Supply 2.6 0.061 4237.16 100% 5 Graph of Category wise Consumption(2011-12) 4500 4000 3500 3000 2500 Unit sold Percentage 2000 1500 1000 500 0 om D t es ic om C al ci r e m In LT d( ) In T) H ( d r Ag i& u Po y ltr L P. m Te p p Su y pl 6 T &D LOSSES Transmission & Distribution Losses. Year Units Units Units % Purchased( Sold Lossed Losses MUs) (MUs) (MUs) 2009-10 3594 3329 265 7.37 2010-11 4184 3897 287 6.86 2011-12 4467 4205 262 5.87 7 CTU & GETCO 66kV Bhilad Direction of Power Flow DNH Direction of Power Flow Drawl of 570-620 MW Industrial Load Industrial Load 8 Interconnected Lines of GETCO and DNH after commissioning of 400 KV Vapi (PGCIL) Sub-station. 400kV Sub-station Vapi-Ambheti PGCIL (CTU Point) 66kV S/C Via-IV Phase Vapi-Dadra Line 220kV Sub-station Vapi-GETCO 50 MW 220kV Vapi-Kharadpada CTU Line Kharadpada-Dadra 66 KV Line 127 MW 220kV Sub-station Bhilad-GETCO 66 KV s/s Khanvel 220kV Vapi (PGCIL)Khadoli D/C Line 66kV Sub-station Dadra-DNH 66 KV s/s Khadoli 66KV T/C line 66 KV s/s Rakholi 66KV D/C line 66KV line 220kV Sub-station Khadoli-DNH 127 MW 220kV D/C Line From Ambheti 220kV Sub-station Kharadpada -DNH 66KV D/C line 66kV 66kV Sub-station Masat-DNH Sub-station Athal-DNH 66kV Sub-station Silli-DNH 66kV D/C Bhilad-Silvassa Line 40 MW 40 MW 66kV Sub-station Silvassa-DNH 9 220/66kV Sub-station Vapi, GEB 400/220kV Sub-station PGCIL,Vapi 66/11kV Sub-station Dadra (85 MVA) Proposed LILO Arrangement of 220kV Ambheti-Khadoli line Proposed 66/11kV, 2x15MVA S/s Waghdhara Proposed 66/11kV, 2x15MVA S/s Piparia Proposed 220/66kV, S/s Waghchhipa 66/11kV Sub-station Amli (65 MVA) 66/11kV Sub-station Silli (30 MVA) Proposed 66/11kV, 2x20MVA S/s Athal 220/66kV Sub -station Bhilad 66/11kV Sub-station Masat (50 MVA) 220/66kV Sub -station Kharadpada (350 MVA) 66/11kV Sub-station Rakholi (55 MVA) References 220/66kV S/s 220kV line 66/11kV S/s 66/11kV Sub-station Khadoli (70 MVA) 220/66kV S/s Khadoli 66/11kV Sub-station Khanvel (30 MVA) 66kV Line (Panther) Proposed 220kV line Proposed 66kV line Proposed 220/66kV Proposed 66/11kV, 2x15MVA S/s Kala S/s 400/220kV S/s 66kV proposed S/s 10 10 Transmission Network • 220 KV– 4 circuits from Ambheti (PGCIL) to Kharadpada and Khadoli. • 66 KV – 5 circuits • 2 Circuits from 220/66 KV Bhilad Sub-station (GETCO) to 66/11 KV Amli Sub-station (DNH). • One Circuit from 220/66 KV Bhilad Sub-station (GETCO) to 66/11 KV Masat Sub-station (DNH). • 2 circuit from 66/11 KV Vapi IV-Phase Sub-station (GETCO) to 66/11 KV Dadra Sub-station (DNH). 11 Transmission & Distribution Network Description of Line Length in Circuit (in Kms) 220 KV Line (D/C) 57 66 KV Line 149.60 11 KV Line 636.74 L.T Line 1785.65 Distribution Transformer Center 878 Nos. 12 Details of Existing 220/66 KV Sub-stations + 66 KV incoming lines from Getco. 220/66 KV Sub-Stations Sr.No. Sub-Station Capacity 1 220/66 KV Kharadpada Sub-station 4 x 100 = 400 MVA 2 220/66 KV Khadoli Sub-station 2 x 160 = 320 MVA Total 720 MVA 66 KV Incoming Lines from GETCO. 1 From Bhilad 220/66 KV Sub-station (3 Lines) 130 MVA 2 From Vapi 220/66 KV Sub-station (2 Lines) 50 MVA Total 180 MVA GRAND TOTAL 900 MVA 13 Details of existing 66/11 KV Sub-stations of Electricity Department SR.NO. SUB-STATION CAPACITY 1 66/11KV Amli Sub-Station : 3 x 15 + 1 X 20= 65 MVA 2 66/11KV Masat Sub-Station : 2 x 15 + 2 x 20 + 1x10 = 80 MVA 3 66/11KV Rakholi Sub-Station : 1x15+2x20+1x10= 65 MVA 4 66/11 KV Khadoli Sub-Station : 20+5+4x10+2x15=95 MVA 5 66/11KV Dadra Sub-Station : 4x20+1x10= 90 MVA 6 66/11KV Kharadpada Sub-Station : 2x16+1x15+1x20= 67 MVA 7 66/11 KV Silli Sub-Station : 2x 15 + 1 x 20= 50 MVA 8 66/11KV Khanvel Sub-Station : 1x10 + 1x15 = 25 MVA 9 66/11KV Athal Sub-station :2 x 20MVA=40MVA TOTAL 577 MVA 14 66 KV Bulk Consumers Consumers Contract Demand : 30 Nos. : 410 MVA 15 Distribution Network 66kV Lines Sr. No. Line Name Conductor Capacity (Amp.) Conductor Length of Type Line (km) 1 66kV Amli - Dadra Line 300 Dog 5.635 2 66kV GIDC Vapi - to Dadra Line 525 Panther 4.948 3 66kV Khadoli - Rakholi Line 525 Panther 9.801 4 66kV Khadoli - Khanvel Line 525 Panther 4.657 5 66kV D/C Khadoli - Khanvel Line 525 Panther 0.904 6 66kV Khadoli - Khanvel Line 525 Panther 1.58 7 66kV Kharadpada - Khadoli Line 525 Panther 19.399 8 66kV D/C Bhilad - Amli Line 525 Panther 12.598 9 66kV Kharadpada - Masat Line 525 Panther 7.592 10 66kV Bhilad - Masat Line 525 Panther 13.075 11 66kV Kharadpada - Rakholi Line 1 525 Panther 14.213 12 66kV Kharadpada - Rakholi Line 2 525 Panther 13.51 13 66kV Amli - Silli Line 525 Panther 5.539 14 66kV Kharadpada - Dadra Line 525 Panther 12.134 15 66kV Masat S/s Tapping (Amli S/s) 525 Panther 7.019 16 66kV Masat S/s to EHV Consumer 400 Wolf 4.65716 Present scenario of power availability and Drawl Allocation of central sector power (peak) (Off-peak) Allocation of power from Bhilai Power Plant Unallocated power from Bhilai whenever :- 640 MW :- 542 MW :- 100 MW :- 64 MW available and requisite. Total Connected load :- 1070 MW Peak Demand of power :- 620 MW Average drawl of Power :- 550-620 MW Daily scheduled availability of power :- 550-700 MW from Grid 17 Station wise Allocation of Central Sector Power Name of Station Peak Hours (1800 hrs to 2200 hrs) MW Off-peak Hours(0000 to 1800 hrs & 2200hrs to 2400 hrs) MW KSTPS 82.34 66.66 VSTPS-I 59.06 47.34 VSTPS-II 47.60 38.15 VSTPS-III 50.14 40.57 KGPP 80.99 80.99 GGPP 58.46 58.46 SIPAT-II 48.14 38.57 KAPP 15.17 12.32 TAPP 3&4 55.15 44.71 KSTPS-7 28.83 23.06 SIPAT-I 114.44 91.59 Total 640.30 542.40 However Firm Allocation is only 66.20 MW 18 Station wise Allocation of Power (contd…) Name of Station Firm Allocation (MW) Un allocated (MW) Total (MW) NSPCL ,Bhilai 100 64 164 RGPPL Ratnagiri Dabhol 38 - 38 TATA POWER(Short Term) 70(Up to Sept 2012) - 70 Total 272 Total Allocation (MW) Firm 100(Bhilai)+38(RGPPL)+66.20(NTPC) 204.20 Total Un allocated Peak Hours 708.10 912.30 Off-peak Hours 610.20 814.40 19 Short Term Power Purchase from TATA Power 70 MW Since October 2011 @ ` 3.95 per Unit Effective rate after rebate ` 3.86 per Unit Required to be renewed w.e.f. 15.09.2012 20 Existing and Proposed Infrastructure Sr. No. Sub-Station Total Transformer Installed Capacity Existing Proposed Total 1. 220/66 KV 720 MVA 480 MVA 1200 MVA (1116 MW) 2. 66/11 KV 542 MVA 140 MVA 725 MVA (674 MW) Total 1925 MVA(1790 MW) 21 Future Power Arrangement for Central Sector Power Allocation Sr. No. Name of Power station Willingness Given MW Allocation of Power MW Expected Date of Commissioning Yet not Commissioned Project delayed due to non availability of Gas to NTPC 1. North Karanpura Super Thermal Power station. - 8 2. Kawas & Gandhar Power project - 20 3. BARH Power station of NTPC 100 * Delayed 4. Mauda Power station of NTPC 50 - Delayed 5. Dibang Power Plant 100 - After 9 years 6. Vindhyachal STPP Stage-IV 100 - Willingness given PPA signed 7. Solhapur STPP of NTPC 100 - 8. UMPP, Chhattisgarh 200 50 Willingness given PPA signed MOP has allocated 50 MW 9. Vindhyachal STPP Stage-V 200 Willingness given PPA signed 10 Mauda Power station of NTPC=II 100 Willingness given PPA signed 11 LARA STPP of NTPC 100 Willingness given PPA signed 22 Sr. No. Name of Power station 12 RGPPL Expansion-II of NTPC Demand MW Allocation of Power MW Expected Date of Commissioning 100 Willingness given PPA signed 0 Ministry has allocated 2.2 MW from this plant of NTPC 13. Khorba STPP stage –III of NTPC 14. Kharegon STPP of NTPC 100 Willingness given PPA signed 15. Gadawara STPP of NTPC 100 Willingness given PPA signed 16. Dhuwaran STPP of NTPC 100 Willingness given PPA signed 17. NSPCL Bokaro,Jharkand 125 Willingness given PPA signed 18. NSPCL,Jagdishpur UP 125 Willingness given PPA signed 19. UMPP Orissa 200 - 1900 80.2 Total 2.2 Willingness given Firm Allocation will be as per Gadgil Formula, done by Ministry of Power 23 Future Power Arrangement • The Administration is in a process to procure 200 MW power on Long-Term Basis through bidding. • The Administration is also having membership with Indian Energy Exchange for procurement of power by bidding process in case of emergency i.e. on day ahead bidding basis. 24 Power Drawl (Figures in MUs) Year Actual Drawl Scheduled Over Drawl Drawl 2004-05 1963.47 1691.17 272.30 2005-06 2373.86 1750.99 622.87 2006-07 2717.99 2239.41 478.58 2007-08 3197.61 2528.61 669.00 2008-09 3279.57 2560.96 2009-10 3594.00 3713.58 119.58 2010-11 4183.00 4380.00 57.32 2011-12 4492.80 4554.49 61.69 718.62 25 Allocation and Expenditure during the 11th plan period (` in Crore) Year Allocation % Utilization 2007-08 17.85 100% 2008-09 11.00 100% 2009-10 38.00 100% 2010-11 26.25 100 % 2011-12 42.00 100% 2012-13 52.00 19% up to Aug 2012 26 On going Projects/Future Projects 220/66KV Transmission Division Sr. No Name of the project /work /schemes ( ` in crore) Estimated cost Budget allocation during 2012-13 1 Interconnecting Transmission line of 220KV from proposed 400KVA Kala sub-station to 220KV Khadoli sub-station `13.97 ` 10.00 2 Interconnecting line Transmission line of 220KV from proposed 400KVA Kala sub-station to 220KV Kharadpada sub-station `19.87 ` 10.00 3 Augmentation of 220/66KV Khadoli sub-station from 2 x 160MVA to 3 x 160MVA capacity ` 14.34 ` 5.00 4 Establishment of 2 x 160MVA, 220/66KV sub-station at Vaghchipa _ ` 1.00 27 On going Projects/Future Projects 66/11KV Distribution Division Sr. No. Name of the project /work /schemes ( ` in Crore ) Estimated cost Budget allocation during 2012-13 1 Establishment of 66/11KV, sub-station at village Pipariya ` 15.10 ` 5.0 2 Establishment of 66/11KV, sub-station at village Vaghdhara ` 4.97 ` 0.25 3 Establishment of 66/11KV, sub-station at village Velugam ` 9.69 ` 0.50 4 Establishment of 66/11KV, 2 x 20MVA sub-station at village Kala ` 9.95 ` 4.0 5 Erection of incoming and outgoing bay at 66/11KV sub station at Khanvel ` 0.92 ` 0.75 28 Other type on going works of Distribution division ` in Crore Sr. No. Name of the project /work /schemes Estimated cost Budget allocation during 2012-13 6 Normal Development of HT/LT line,AMR for HT/LT consumers, purchase of meter etc ` 5.75 ` 6.25 7 Construction of New Corporate office building /Office building ` 2.0 ` 2.0 8 Scheme for Integrated Solution for electrical Network ` 19.86 ` 5.0 9 Underground Cabling of Silvassa Town Tender invited for DPR survey work. Token provision of 1.00 crore 29 JERC Commission started its functioning for all Union Territories and Goa State since September,2008 & having its office at Gurgaon, Haryana. The first tariff order of ED-DNH issued by the Commission on 1st November,2010 for the year 2010-11. The second tariff order of ED-DNH issued by the Commission on 13th September,2011 for the year 2011-12 The third tariff order of ED-DNH issued by the Commission on 09.08.2012 for the year 2012-13 along with re-determination of tariff order FY 2011-12 as per the order of Hon’ble APTEL. 30 Tariff Structure Energy Usage 2010-11 2011-12 2012-13 Unit Domestic Category Consumers 0-50 Units 1.00 1.00 1.10 `/kWh 51-200 Units 1.60 1.60 1.70 `/kWh 201-400 Units 2.00 2.00 2.20 `/kWh 401 & above 2.25 2.25 2.50 `/kWh LIG 5.00 5.00 `/Connection 5.00 31 Tariff Structure Energy Usage 2010-11 2011-12 2012-13 Unit Commercial Category Consumers 1-100 Units 2.05 2.05 2.25 `/kWh 101 and above Units 2.70 2.70 3.00 `/kWh Agriculture Category Consumers Load up to 10 HP 0.55 0.55 0.65 `/kWh Load above 10 HP 0.85 0.85 0.85 `/kWh Public lighting 1.20 1.20 1.60 `/kWh 32 Tariff Structure Energy Usage 2010-11 2011-12 2012-13 Unit 2.40 3.00 `/kWh LT Industrial Category Consumers For all Units 2.40 HT industrial Category Consumers Up to 50000Units 2.95 2.95 3.70 `/kWh 50000 to 500000 3.10 Units 3.10 3.80 `/kWh Above 500000 Units 3.15 3.15 3.85 `/kWh Demand Charges 60 60 75 `/KVA 33 Tariff Structure Energy Usage 2010-11 2011-12 2012-13 Unit HT Industrial Category Consumers (Ferro metallurgical/steel rolling mill) First 300 Units/KVA 2.05 2.05 2.70 `/kWh Next 200 Units/KVA 3.05 3.05 3.40 `/kWh Above 500 Units/KVA 3.55 3.55 3.70 `/kWh Demand Charges 450 450 500 `/KVA 34 DNH Power Distribution Corporation Ltd NOC from MHA :29th Sept 2011 NOC from MOP :29th Feb 2012 Incorporation of the company :13th July 2012 1st board meeting :24th Aug 2012 Grant in Aid :` 70 crore Share capital :` 40 crore Chairman :_Hon’ble Administrator Managing Director :- Gyanesh Bharti, Secretary (Power) Director :- Smt.Alaka Divan (MD OIDC) Further Actions Required: • Transfer notification to be finalized and to be implemented by 01.10.2012 • To Prepare logo of the corporation, transfer of assests and employees 35 CGRF As per the JERC regulation in 2009 the CGRF of UT of DNH has started its functioning from 25.08.2011 Chairman:-Shri Lal Singh (Retd) Member:-Shri T.D. Davda (Retd) JERC appointed member: Shri M.C.Gandhi(Retd) Office Address:-Electricity Department, Amli, Silvassa 36 Open Access As per the JERC open access Regulations 2009, the ED-DNH has notified Short term and Long term procedures. At present there is no any open access customer ED-DNH is in a process to formulate open access charges like transmission /wheeling charges, losses charges, cross sub cidy etc Ministry of Power has directed that the consumers of 1 MW and above demand are deemed to be open access customer and are not under the preview of regulatory regime as per the opinion given by the Ministry of Law and Justice. 37 Status of Computerization at present RACE billing software implemented. On line (AMR) reading of bills for 29 bulk 66 KV Consumers. 150 HT Consumers are also installed AMR. Any Time Payment machine (ATP) installed. 8 Post Offices are designated as collection centre. Tender for GIS mapping and Energy Audit for 11 KV feeders is under finalization. 38 Future Programme for Computerization All HT Consumers to be installed with AMR by Oct,2012. LT Consumers to be installed with AMR by March,2013. Website is ready, security audit is going on, to be launched in 2 months. Integrated solutions for electricity networking. After computerization of integrated solutions , SMART GRID can be implemented. 39 Thank You 40