PSerc - Power Systems Engineering Research Center

Download Report

Transcript PSerc - Power Systems Engineering Research Center

T&D Technology
Research Stem
PSERC
Highlights of T&D Stem Activity
(2000-2005)
Mladen Kezunovic
Former Stem Leader
IAB Meeting
Madison, June 1, 2006
1
Outline
•
•
•
•
•
•
PSERC
History
Research Areas
Projects
Survey
Initiatives
Future interest
2
History
PSERC
• First meeting: Conference call on May 25, 2001
• Meetings and presentations:
- 30 stem meetings (583 in attendance)
- 10 IAB presentations
• Membership:
- 20 in 2000
- 35 in 2005
• Participation:
- Conference calls, from 8 (L) to 19 (H)
- IAB meetings, from 16 (L) to 42 (H)
- Retreats/Workshops, from 28 (L) to 52 (H)
3
Outline
•
•
•
•
•
•
PSERC
History
Research Areas
Projects
Survey
Initiatives
Future interest
4
PSERC RESEARCH STEMS
PSERC
Markets
T&D
Systems
5
T&D Research Areas
PSERC
I. Substation Data Integration and
Enhanced Functions
II. Managing an Aging Infrastructure
III. Distribution and Transmission
Automation
IV. New Devices and Related Control
Concepts
V. New Monitoring, Control and Protection
Paradigms
6
Outline
•
•
•
•
•
•
PSERC
History
Research Areas
Projects
Survey
Initiatives
Future interest
7
Projects
PSERC
T-1
Corona Discharge Deterioration of ADSS Cable
Karady
May 2002
T-2
Differential GPS Measurement of Overhead Conductor Sag
Heydt (ASU)
Sep. 2002
T-3
On-Line Peak Loading of Substation Distribution Transformers
Through Accurate Temperature Prediction
Tylavsky (ASU)
Apr. 2002
T-4
Electrical Transmission Line Insulator Flashover Predictor
Karady (ASU)
May 2002
T-5
Intelligent Substation
Shoureshi (CSM)
Aug. 2004
T-6
Condition Monitoring for In-Service Non-ceramic Insulators and
Underground Cables
Gorur (ASU)
May 2002
T-7
Redesign and New Interpretation of Power Acceptability Curves for
Three Phase Loads
Heydt (ASU)
Feb. 2001
T-8
Investigation of Fuel Cell Operation and Interaction within the
Surrounding Network
Karady (ASU)
May 2002
T-9
State Estimation via Substation Monitoring
Abur (TAMU)
Feb. 2003
T-10
Accurate Fault Location in T&D Networks
Kezunovic (TAMU)
Feb. 2003
T-11
Monitoring Using Wireless Communications
Kezunovic (TAMU)
Apr. 2003
T-13
Grounding and Safety with OPGW
Olsen (WSU)
Oct. 2002
T-14
NCI Evaluation: Seals and Interfaces
Gorur (ASU)
Aug. 2004
T-15
GPS Measurement of Overhead Conductor Sag
Heydt (ASU)
April 2002
T-20
Smart Sensor Development for T&D
Shoureshi (CSM)
Aug. 2004
T-21
Distributed Electric Energy Storage and Generation
Jewell (WState)
July 2004
8
Projects
PSERC
Number
Title
Lead Researcher
Status
T-16
Voltage Dip Effects
Karady (ASU)
T-17
Algorithms and IEDs for On-Line Monitoring
Kezunovic (TAMU)
January 2006
T-18
MicroGrid Protection and Control
Lasseter (Wisconsin)
January 2006
T-19
Optimized Maintenance Scheduler
McCalley (Iowa State)
February 2006
T-22
Advanced Digital Measurement and Protection
Systems
Karady (ASU)
Draft
T-23
Prioritizing Maintenance of Underground Cables
Gorur (ASU)
Work in progress
T-24
Distribution System Reliability Enhancement
Jewell (Wichita State)
T-25
Liquid Filled Power Transformers
P. K. Sen (CSM)
October 05
Draft
Work in progress
9
Projects
Number
T-26G
Title
Tool for Insulator Condition Assessment
PSERC
Lead Researcher
Status
Gorur (ASU)
Work In progress
T-27
Reliability Based Vegetation Management
Russell (TAMU)
Work in progress
T-28
Satellite Imagery for the Identification of
Interference
Karady (ASU)
Works in progress
T-29
Evaluation of Digital Protection System
Kezunovic (TAMU)
Work in progress
T-30
Transient Testing of Protective Relays
Kezunovic (TAMU)
Work in progress
T-31
Massively Deployed Sensors
Heydt (ASU)
New Project
T-32
Integration of Substation IED Information
Kezunovic (TAMU)
New Project
10
Project statistics
•
•
•
•
•
•
•
•
PSERC
Arizona state: 14
Texas A&M university: 8
Colorado school of Mines: 3
Wichita State: 2
GaTech: 1
Iowa State: 1
Washington State: 1
Wisconsin: 1
11
Areas Covered
PSERC
• Distribution:
- Distributed energy storage and generation
- Microgrid protection and control
- Performance of fuel cells
- Diagnostics of cables and NCI
- Power quality assessment
- Transformer loading and diagnostics
- System reliability enhancement
- Vegetation interference with feeders
12
Areas Covered
PSERC
• Transmission:
- Substation automation
- Integration of IED data
- Automated analysis of faults
- Optical transformers
- All-digital substation
- Inclusion of IED data in EMS
- Monitoring of conductor sags
13
Areas Covered
PSERC
• T&D:
- Risk-based optimized maintenance
- Wireless communications
- Smart sensors
- State estimation
- Fault location
- IED testing and evaluation
- Grounding and safety
14
Outline
•
•
•
•
•
•
PSERC
History
Research Areas
Projects
Survey
Initiatives
Future interest
15
Survey
PSERC
•
•
•
•
•
Lead investigators responded
22 completed projects
19 response
11 questions
Purpose: explore opportunities for
continuation of funding
• Samples of some answers
16
Survey
PSERC
• Research characterization:
- fundamental, 0
- applied, 14
- combination, 5
• Deliverables (besides final report):
- software, 7
- hardware, 1
- analytical tools, 10
- other, 2
17
Survey
PSERC
• Additional funding to get practical solution:
- $50k-$100k, 4
- $100k-$250k, 10
- $250k-500k, 2
- over $500k, 1
• Source of funding:
- PSerc, 5
- NSF, 2
- EPRI, 10
- DOE, 8
- Vendors, 3
- Other, 3
18
Survey
PSERC
• Time required to create practical solution:
- six months, 1 - two years, 10
- one year, 4
- three (or more) years, 2
• What are verification requirements:
- testing with simulated data, 4
- testing with field data, 11
- In service installation, 9
19
Outline
•
•
•
•
•
•
PSERC
History
Research Areas
Projects
Survey
Initiatives
Future interest
20
Activities of interest
PSERC
• Reviewing project progress in separate meetings (using
distance conferencing or net facilities/services) that will
take place in-between the IAB meetings (42)
• Making sure the final reports for completed PSerc
projects are properly reviewed and advertised (37)
• Producing a list of research areas of interest for the
solicitation of new proposals (37)
• Conducting the review process and ranking of the
proposals (32)
• Initiating review of the Statement of Work (SOW)
documents for the projects in similar research areas
making sure the coordination of the research activities is
optimized (18)
21
Crosscutting issues
•
•
•
•
•
PSERC
State Estimation
Special Protection Systems
Distributed Processing
Phasor Measurements
Improved SCADA
22
Outline
•
•
•
•
•
•
PSERC
History
Research Areas
Projects
Survey
Initiatives
Future interest
23
Project classification
PSERC
• Proposed classification:
- Exploratory projects (40% of funds, 1-2
years, $70k-$100k, fundamental research)
- Demonstration projects (40% of funds, 2-3
years, $100k-$500k, field or simulation cases)
- Initiation projects (20% of funds, 1 year,
$30k-$45k, eligible for renewal as exploratory
or demonstration projects)
24
New Efforts
PSERC
• Engaging experts from industry members
• Establishing field data repository for
evaluation of new concepts
• Creating field demonstration site for PSerc
“show-case”
• Providing financial means for moving from
concepts to practice
• Branding and marketing PSerc T&D
contributions
25