FOOTHILL MUNICIPAL WATER DISTRICT RECYCLED WATER …

Download Report

Transcript FOOTHILL MUNICIPAL WATER DISTRICT RECYCLED WATER …

FOOTHILL MUNICIPAL WATER DISTRICT
Recycled Water Project
Board Workshop
May 20, 2013
Outline
•
•
•
5/20/2013
Past /Present
– Drivers
– Project Background and Description
– Benefits
Present
– Benefits and Partnerships
– Project Alternatives
– Hydrogeologic Modeling with Percolation Test
– CEQA Plus and Title 22
– Raymond Basin Management Board
Future
– Budget and Funding
– Schedule
– Next Steps
– Design Bid Build or Design Build Operate
– Schedule
2
Driver – Senate Bill SBX7-7
 Water suppliers to increase water use efficiency
 Urban Water Conservation
 Reducing per capita 10% by December 31, 2015
 Reducing per capita 20% by December 31, 2020
 Effective 2016 urban retail water supplies not
meeting water conservation requirements are
not eligible for State water grants and loans
 The recycled water program assists in meeting
this requirement
5/20/2013
3
Driver – Delta Conveyance
 Delta Steward Council – May 16, 2013
 Adopted FINAL Delta Plan
 Certifies Programmatic EIR
 Adopted Regulations to Implement Policies of Delta Plan
 Additional pressure for assurances to reduce
reliance on Delta Conveyance
 Senate President pro Tem Darrell Steinberg
 Sunne McPeak from CA Emerging Technology Fund
 Environmental Groups
 2nd Driest Year in Nor. Cal and Colorado River
 Potential Shortages in 2 to 3 years
5/20/2013
4
Background – 2007-2009
• Master Plan put on hold second interconnection
• Water Resources Plan prioritized developing reliability
Weighting
1
0.9
0.9
Second MWD
Interconnection
3
1
3
1
4
2
3
15.8
Recycled Water
4
5
4
6
3
3
5
27.8
Groundwater
Partnering/Transfers
(Desalination)
6
3
5
5
5
4
2
28.4
1
4
1
5
3
3
3
18.6
San Gabriel Pipeline
4
2
3
1
3
2
1
15.1
Conservation
2
4
2
3
6
6
5
25.8
Interties
4
5
4
1
5
4
4
24.9
Debris Basins
3
4
2
3
3
5
2
20.5
5/20/2013
1
1
0.9
0.8
Supply
Energy Use
Emergency
Rate
Reliability of
Environmental
Other
Shortage
Greenhouse
Priority
Reliability Mitigation Infrastructure
Impacts
Challenges
(Drought)
Gases
5
Background – 2011 and 2012
• Feasibility study approved by SWRCB
• Reviewed 17 Alternatives
• Narrowed down to Alternative A-6, MBR
plant near Oak Grove Drive at 0.25 MGD
recharge at John Muir High School
• Two Firms hired to develop then review
regulations and costs
• Costs dropped based on less purple pipe
5/20/2013
6
Background - 2012
• Cal Poly Pomona began working on
project in August 2012 – Field of Green
• IRWMP process began in September
2012
• November 2012 Board authorizes
proceeding with hydrogeologic evaluation,
CEQA Plus, and Program Management
services and payment of fee for grant
application
5/20/2013
7
Background - 2013
• January 2013 - Board adopted resolution
regarding WaterSMART Grant
• March 2013 - Board authorized consulting
services for conceptual report for Title 22
• March 2013 - Draft groundwater recharge
regulations changed
• April 2013 - Labor Compliance resolution
adopted by Board
• April 2013 - Board approved amendment to
hydrogeologic modeling agreement for two other
modeling runs
5/20/2013
8
Recycled Water Use in Area
• Los Angeles County Sanitation District
– La Cañada Flintridge Country Club
• City of Glendale/LADWP
– Landscape Irrigation
• City of Burbank
– Landscape Irrigation
– Fire Fighting
• Descanso Gardens and City of Pasadena
– Verdugo Hills Golf Course MBR
• Claremont Colleges MBR
5/20/2013
9
Description
 Watershed approach to developing recycled water
 Construction of a 0.25 MGD MBR plant
 Recharge to groundwater basin and receive credits
 Stormwater and urban runoff capture, treatment,
and recharge
 Reduce carbon footprint and lower greenhouse
emissions
 Conservation and education outreach component
5/20/2013
10
Project Alternatives
5/20/2013
11
Recycled Water Flow
7/7/2015
12
Benefits of Recycled Water Project
 Enhance local supply and reduce dependency on
imported water
 Reduction in greenhouse gases and energy
usage
 Demonstrate watershed approach to developing
local supplies and benefitting the community
• Water Education
• Watershed Integrity and Health
• Public Outreach
 Support of stakeholders – city, school, church,
Sanitation Districts, County Public Works
5/20/2013
13
Quantified Benefits
 Recharge Recycled Water: 280 AFY
 Other Recharge: 38 AFY average
• Estimated Stormwater Capture: 15 AFY
• Estimated Urban Runoff Capture: 23 AFY
 Barren Land: Half Acre Improvement
 Energy Savings: 600 Megawatts
• Enough for 85 Southern California homes annually
5/20/2013
14
Project Details - Partnerships
 La Cañada Unified School District and City of La Cañada
Flintridge:
 Athletic fields
 Stormwater and urban runoff capture
 Cal Poly Pomona: Civil Engineering Department, Department of
Landscape Architecture and Department of Urban and Regional
Planning
 Preparation of a 3D model of infiltration galleries
 Development of drought tolerant landscaping for both MBR and
LCHS sites
 Development of a conservation and educational component to the
Project
 Undergraduate Development
5/20/2013
15
Project Support













5/20/2013
Congresswoman Judy Chu
Congressman Adam Schiff
Assemblymember Mike Gatto
Los Angeles County Supervisor Michael D. Antonovich
Metropolitan Water District of Southern California
Los Angeles County Sanitation District
Los Angeles County Department of Public Works
Council for Watershed Health
Arroyo Seco Foundation
La Cañada United Methodist Church
La Cañada Unified School District
City of La Cañada Flintridge
Cal Poly Pomona
16
Hydrogeologic Model
• 3 areas modeled:
– Athletic fields
– Flint Creek Wash
– Behind Devil’s Gate Dam
• Results:
– All 3 alternatives achieve CDPH minimum of
four months retention time from active wells.
– All alternatives do not exceed the RWC of 20%
over a 120-month period.
5/20/2013
17
Hydrogeologic Model Percolation Tests
4 feet per day average percolation
5/20/2013
18
CEQA Plus
• Initial Study to be distributed June via
FMWD website, via email notice to Board
packet distribution list which includes
newspapers and blogs, public agencies,
other entities
• Workshop will be scheduled for 30 days
from release of document
• Recommended action at August Board
meeting
5/20/2013
19
Title 22 – Conceptual Report
• Conceptual Report drafted on May 9, 2013
• Provides:
– Summary key requirements or topics,
– References to Title 22 and FMWD method of
compliance
• All items are achievable - no fatal flaws
with the project
5/20/2013
20
Raymond Basin Management Board
• Originally stormwater and urban runoff to
be captured was to be credited to account
• RBMB has stated no longer able to
provide 100% credit
• RBMB willing to provide some capital
contribution
5/20/2013
21
Estimated Project Budget
Total:
7/7/2015
$2,935,300
22
Per Acre-Foot Cost
•
•
•
•
•
Assume 280 Acre-feet of sales
Receive IRWMP and USBR grants
Principal = $1,185,300
30 year term
3.0% interest rate
Cost per Acre-foot = $810
5/20/2013
23
Per Acre-Foot Cost – Above Scenario
Year 1
Year 30
Recycled Water
$810
$1,616
Groundwater Pumping
$100
$236
$910
$1,852
Year 1
Year 30
MWD Rate
$917
$2,160
Main Plant Pumping
$50
$118
$967
$2,278
Total
Total
Over time, difference increases from $57
per acre-foot to $426 per Acre-foot
5/20/2013
Assume 3% inflation factor
24
Comparison of Recycled Water and Imported Water Costs
$2,500
$2,000
• 280 AF sales
• $1.5 million IRWMP Grant
• $300,000 USBR Grant
Dollars
$1,500
$1,000
$500
First year
savings is
about $57/AF
Year 30
savings is
about
$425/AF
Year 1
Year 2
Year 3
Year 4
Year 5
Year 6
Year 7
Year 8
Year 9
Year 10
Year 11
Year 12
Year 13
Year 14
Year 15
Year 16
Year 17
Year 18
Year 19
Year 20
Year 21
Year 22
Year 23
Year 24
Year 25
Year 26
Year 27
Year 28
Year 29
Year 30
$-
Recycled Water Cost
5/20/2013
Avoided Imported Water Cost
25
IRWMP Grant
•
•
•
•
Initial presentation September 2012
For $1.45M
Ranked #1 in Subregion and #3 in Region
Application submitted to State in March
2013
• 50% of capital costs of approximately $3
million
• Results October 2013
5/20/2013
26
USBR WEEG Grant
•
•
•
•
Submitted grant January 2013
For $300,000
Only infiltration galleries portion
Recycled water plant construction not
allowed under this type of grant
• Results June 2013
5/20/2013
27
Other Potential Funding
 USBR
 Title XVI Program
 CalFed Funding
 MWD LRP - Up to $250/AF of production
 MWD Foundational Action Funding Program - $500k
 SWRCB Low Interest Loans
 iBank Low Interest Loans
 Internal FMWD Funding
• Water Sales
• District Revenues/Reserves
5/20/2013
28
Current Status
•
•
•
•
•
•
•
•
•
•
•
5/20/2013
Feasibility Study Completed – accepted by SWRCB
Percolation Testing – complete
Basin Hydrogeologic Modeling – complete
CEQA – in process
Title 22 Conceptual Report – in progress
WEEG application submittal – complete
IRWMP application submittal – complete
Fields of Green project – complete
Appraisal for easement – complete
Status meetings with various entities – in progress
Contract negotiations – in progress
29
Next Steps
•
•
•
•
Release Initial Study Public Hearing
CEQA Finalization
Finalize agreements for
Late June
Mid July
August Brd. Mtg
– Raymond Basin Management Board
– Los Angles County Sanitation District
– La Cañada United Methodist Church
– La Cañada Unified School District
• Sampling of LACSD Sewer for Preliminary Design
5/20/2013
30
Preliminary Design
• 30% Design
• Scope of Services
–
–
–
–
–
–
–
–
–
–
5/20/2013
Treatment (Primary, Secondary, Tertiary)
Chemical Feed System
Instrumentation and Controls
Hydraulics
Site Layout
Design Standards
Architectural Programming
Discharge Design
Cost Estimate
Project Delivery Recommendation (DBBO or DBO)
31
Implementation Schedule
Project Element
Start Date
End Date
July 2012
September 2013
Environmental
Documentation (CEQA)
December 2012
June 2013
Partnership Agreements
November 2012
November 2013
March 2013
September 2013
Preliminary Design
July 2013
February 2014
Final Design Solicitation
and Completion
April 2014
October 2014
Permitting
February 2014
February 2015
Construction Bidding
October 2014
April 2015
May 2015
June 2016
October 2016
-
Development/Finalize
External Funding
Title 22 Report
Construction and Start
Up
Operation
5/20/2013
32