the Oregon Productivity Matrix

Download Report

Transcript the Oregon Productivity Matrix

Oregon Productivity Matrix (OPM) Supplier Briefing

T-Presentation-1 5/1/2020 1

Objectives

At the conclusion of the training, the participant should be able to:

– – – – – –

Understand the definition of Oregon Productivity Matrix Understand the benefits and concept of OPM Analyze and conduct an OPM event Define Supplier Responsibilities Identify the value and goals of OPM Understand Supplier Responsibilities regarding the OPM webportal

T-Presentation-1 5/1/2020 2

Defining OPM

• •

Is a single page view of a supplier’s overall performance – schedule, quality & customer satisfaction Non-recurring effort up front

OPM uses key metrics / statistical data employed by the supplier

Often already existing company metrics

Referred to as Key Performance Indicators (KPIs)

• •

OPM provides trend-data analysis to predict performance Can be summarized by program Supplier’s data is not shared with any competitors

T-Presentation-1 5/1/2020 3

OPM Benefits

Outstanding managerial tool

Promotes awareness at all levels

Publish it in the work areas

Often uncovers problems at sub-tiers

Can be adapted to any supplier or company

Identifies problems early allowing for preventive action response

Summarized data in all categories shows highly visible trends

Sublevel data used to define trend root causes

KPIs weighted based on importance and against a scale of 100% Suppliers are not measured against one another, but against their own previous performance

T-Presentation-1 5/1/2020 4

Process Insight for Predicting Impact to LM Aero

SUPPLIER PROCESS Purchase Order Issued Scrap or RTV Design, Change Review, Planning REJECT INPUT MRB & C/A Fix ACCEPT Supplier Production Process ....to Here REJECT OUTPUT Inspect ACCEPT

OPM provides continuous evaluations of a supplier’s procurement and manufacturing processes. These tools help predict impact to LM and trigger early problem solving.

Final Acceptance To Stock Or Customer Validation From here...

T-Presentation-1 5/1/2020 5

Is OPM a Customer Report Card?

OPM

is

a report card that summarizes and grades Supplier’s Line of Balance Line of Balance: A visual control of how production is aligned with customer demand and can:

• Be used to evaluate work flow • Be a process for collecting and measuring data against a specific plan • Expose process bottlenecks, allowing focus on those points responsible for slippage T-Presentation-1 5/1/2020 6

Line of Balance

Applies to the following key areas:

• • • •

Material Availability

Measurement of receiving parts/service on time from sub-tier suppliers, processors, or any incoming material.

Manufacturing Performance

• •

Measurements of scheduled vs. actual Measurements of productivity Internal Quality

Measurement of internal performance of processes/products meeting customer's requirements Customer Satisfaction

Measurement of customer’s level of satisfaction with the provided product and/or service

T-Presentation-1 5/1/2020 7

1. Understand the Value Stream (current state reality) 2. Identify KPI’s, build OPM (may require extrapolation from data) 3. Develop Future State & Improvement Plan 4. Execute 5. Manage Supplier Sub Tier Control Sub-tier Delivery On-time from Processor Sub-tier Quality Shortages

Material Availability

Supplier Production Control / MRP On time work order release On-time kit release % on-time marry-ups Internal schedule detail Fab Critical Path Cycle Time Inventory Turns Machine Process Capability Sched. Vs, Act Start / Comp.

Hours per Unit Aged work in process (WIP) Efficiency Utilization Lead Time On-time delivery Repair Turn Time

Manufacturing Performance

Scrap Rate COPQ DPMO QARs SQARs Rwk Frequency First Pass Yield First Article

Internal Quality

LM Aero Cust. Complaints Field Returns

Customer Satisfaction

Value Stream (Flow)

8

Material Availability

Lockheed Martin Aeronautics Company

Do you have material available to meet customer demand?

How do you know?

         

Do you use outside special processors?

Do you know whether or not you receive raw material or components?

Do they deliver material to the floor in kits? Is kit release on time measurement? Who puts them together?

Will you release kit short?

Is material availability the trigger to start production?

Do they receive material from LM?

Do you receive components from internal fabrication dept.? IS it from a sister facility?

Do you inspect on receipt?

Do have source inspectors at sub-tier?

Is raw material or hardware receipt a problem?

Manufacturing Performance (Line Of Balance)

Lockheed Martin Aeronautics Company

Are you releasing build to package and material to meet customer demand?

How do you know?

     

Are you measuring Work In Process (WIP)?

Are you measuring Shortages?

Are you measuring complete/on-time Build To Package (Eng, tools, job sequence, bill of material)?

Are you measuring on time release of kits?

Are you measuring on time release of Work Orders?

Do you measure actual start vs. scheduled start?

Manufacturing Performance (Line Of Balance)

Lockheed Martin Aeronautics Company

Are you meeting your planned schedule?

How do you know?

Are you measuring complete/on-time Build To Package (Eng, Are you measuring WIP (aged WIP))?

      

Are you measuring Inventory Turns?

Are you measuring Machine/Process Capability?

Are you measuring Cycle times (planned vs. actual)?

Are you measuring Takt time?

Are you measuring kanban performance?

Are you measuring hours/unit?

Are you measuring productivity/realization/efficiency/utilization/std vs. actual hrs?

Are you measuring sub-assy on-time completion (% on time)?

Quality

Lockheed Martin Aeronautics Company

Are your internal processes capable of meeting internal customer quality requirements?

How do you know?

        

Are you measuring First Pass Yield (FPY)?

What is your Cost of Poor Quality (COPQ)?

What is your Scrap rate?

What is your Repair hours per unit?

What is your Defects Per Million Opportunities (DPMO)?

Do you have SPC data?

How do you measure internal defects?

Do you measure process capability?

Do you measure Rework frequency?

Customer Satisfaction

Lockheed Martin Aeronautics Company

Are your customers satisfied?

How do you know?

    

Do you know your Repair turn around time (TAT)?

Do you measure customer returns?

Are you measuring customer complaints?

Are you measuring response time to customer (CARS, quote)?

Are you measuring Delivery/quality rating for all customers?

Examples of Key Performance Indicators (KPIs)

• • • •

Material Availability Sub-tier QA Rating Sub-tier Delivery Rating Shortages (including raw material) On-time back from Processor

• • •

Hours per Unit % on-time marry-ups Takt Time

• • • • • • • • • •

Manufacturing Performance Actual vs. Planned Production

– –

Start Completion Cycle Time In-house detail Fab schedule Machine/Process Capability Lead Time Inventory Turns On time work order release On-time kit release On-time delivery to internal customer Aged work in process (WIP)

• • • • • • • •

Internal Quality First Article Final Acceptance Yield First Pass Yield Rework Frequency Defects per Million Opportunities Production Scrap Rate SQARs Site Rejections (QARs)

• • •

Customer Satisfaction Customer Complaints / Field Service Return Training Requirements Fulfilled RTV Repair Turnaround Time

T-Presentation-1 5/1/2020 14

How is PQA Going to React to the Data?

It is in PQA’s best interest to not over react!!!

Data and charts are indicators

PQA is interested in supplier acting on trends

Individual product non-conformances will continue to be handled under currently established methods

We will provide help if poor performance causes product level performance issues

We are looking to see that the supplier is using OPM as a preventive tool and reacting to the data appropriately

T-Presentation-1 5/1/2020 15

OPM Event Methodology

Typical Team composition will include

• • • • • •

Supplier QA Supplier Program Management Supplier Manufacturing Supplier Contracts LM SQE(s) LM Procurement Typically a one to two day event at the supplier’s facility

T-Presentation-1 5/1/2020 16

OPM Implementation Event

The following activities occur as a joint PQA and Supplier Team

Map the ‘typical’ manufacturing process if necessary for KPI determination

– – –

Identify metrics already collected Jointly determine KPIs Develop OPM

Review the selected metrics and OPM chart with management for adjustment and weighting

Develop Bar Charts for three months past history if data available

T-Presentation-1 5/1/2020 17

Construction of an OPM

Steps 1. Identify the KPIs and their grouping 2. Establish the Baseline 3. Set Goals 4. Calculate Increments 5. Weight the KPIs

T-Presentation-1 5/1/2020 18

Identify the KPIs

The most important step in the construction of an OPM is the identification and selection of the 5 to 10 KPIs.

Early or predictive measures are emphasized

PQA/Supplier mutually agree on KPIs

Data selection for the KPIs may come from existing supplier data however the data shall provide a complete predictive flow and line of balance

Must be quantitative

Use of statistical data preferred

Initially chosen KPIs not “locked in”

Fewer criteria focuses energy and resources better

T-Presentation-1 5/1/2020 19

Categories and Grouping of KPIs Grouping KPIs

T-Presentation-1 5/1/2020 20

Creating a Baseline at a Score of 3

Average of 3 to 6 months data equals baseline performance

T-Presentation-1 5/1/2020 21

Setting Stretch Goal at a Score of 10

Stretch goal is a long-term goal

2 to 3 years out (Not a goal to be reached within the first quarter or this year)

Stretch goal is to be set at a level which drives continuous improvement

T-Presentation-1 5/1/2020 22

Setting Goals at a Score of 10

Stretch Goals

T-Presentation-1 5/1/2020 23

Establishing the Increments (Hurdles)

Once we’ve determined where we are --- and where we are going (Baseline and Stretch Goal)

We then establish intermediate hurdles or mini-objectives by filling in the rest of matrix from 0 to 10.

Allows for 7 levels of achievement to be measured en-route to stretch goal (focuses on improvements)

Providing several declining increments allows for occasional underperforming periods and helps to show any inverse relationships between metrics

T-Presentation-1 5/1/2020 24

Establishing the Increments (Hurdles)

KPI Hurdles: Even increments for Scores 0 through 10 are established using the Baseline and Stretch Goal inputs. For this KPI, Supplier Quality Index, the increment between hurdles was calculated using the difference between the Stretch Goal (Score of 10) and the Baseline (Score of 3) and dividing by 7 (the number of steps between Score 3 and Score 10). Increment = (100 – 98.54) / 7 = 0.21. Therefore, each successive hurdle for this KPI is 0.21% greater than its predecessor.

T-Presentation-1 5/1/2020 25

Weighting the KPIs

Weighting based on 100% scale

In effect, weighting defines the mission. It establishes the importance of each KPI and has a direct impact on the score and trend.

Methods for determining weights

– –

Emotional Decision matrix

Critical to have upper management buy-in for weights

T-Presentation-1 5/1/2020 26

Weighting the KPIs

Weight

T-Presentation-1 5/1/2020 27

Measure Current Performance

The chart is basically built and can now be used to measure current months performance:

Enter current months data for each KPI

Score the data

Determine the value for each KPI

Determine the overall OPM value

T-Presentation-1 5/1/2020 28

Measure Current Performance

Current Month’s Performance

T-Presentation-1 5/1/2020 29

Score the Data

KPI Score: The current month's performance for this KPI is 98.56%. This clears the KPI hurdle of 98.54% (Score of 3), but does not clear the KPI Hurdle of 98.75% (Score of 4). Therefore, the KPI Score for the Supplier Quality Rating metric is 3 for this reporting period.

T-Presentation-1 5/1/2020 30

Determine the Value for Each KPI

KPI Value: Determined by multiplying the KPI Score by the KPI Weight input.

Calculation: 3 x 3 = 9

T-Presentation-1 5/1/2020 31

Determine the Overall OPM Value

Overall Value: Calculated by summing the individual KPI Values. Calculation: 9 + 21 + 130 + 64 + 0 + 0 + 15 + 52 + 84 + 44 = 419

T-Presentation-1 5/1/2020 32

Trend Analysis for OPM

Bar charts provide quick visual of performance trends

Helps focus resources on areas requiring Root Cause Analysis and Corrective Action

Useful for senior management review

Reveals impact of functionally grouped metrics on overall score, for example:

– –

Material Availability Manufacturing Performance

– –

Internal Quality Customer Satisfaction

Measures individual supplier trends; not a comparison tool

T-Presentation-1 5/1/2020 33

KPI Grouping and Group Actuals

Grouping Metric Group Actual Total Value: This is the actual total value of all KPIs in a metric group during the reporting month. In this example the metric group Material Availability is made up of two KPIs: Supplier Quality Index and Supplier On-time Delivery. The actual total value for these KPIs is the sum of their individual calculated values. Calculation: 9 + 21 = 30

T-Presentation-1 5/1/2020 34

Bar Chart for KPI Group

Metric Group Bar Charts: This bar chart plot actual values for the KPI metric groups. The third bar on the Material Availability chart represents this month's actual value of 30. The y-axis range for this bar chart should be ranged from zero to the metric group stretch goal value (100 for this metric group).

T-Presentation-1 5/1/2020 35

Overall OPM Bar Chart

Overall Value Bar Chart: This bar chart plots overall matrix values. The third bar on this chart represents this month's actual value of 419. The y-axis range for this bar chart should be ranged from zero to the overall stretch goal of 1000. The blue line represents the baseline score of 300.

T-Presentation-1 5/1/2020 36

Internal Quality-Focused OPM

This OPM is to focus specifically Quality Performance Indicators and will roll-up to the high level OPM chart

Example KPIs:

– – – – – – – – – –

First Article Final Acceptance Yield First Pass Yield Rework Frequency Defects per Million Opportunities Production Scrap Rate SQARs Site Rejections (QARs) Sub-tier supplier (X) QA Rating Cost of Poor Quality

T-Presentation-1 5/1/2020 37

Top Level Internal Quality OPM Internal Quality Focused Sub OPM

T-Presentation-1 5/1/2020 38

Does Implementation of OPM Cost Money?

You already use metrics to measure yourselves

Remember, existing supplier metrics are typically used to develop summary matrix

OPM implementation involves a non-recurring up-front effort

Recurring costs offset by decreased LM Aero oversight Tailoring existing supplier metrics to OPM format is virtually cost free

T-Presentation-1 5/1/2020 39

Does OPM Provide Value?

Provides concise trend metrics data which reports performance

OPM can help identify small, insidious problems before they become major cost problems

OPM provides an effective and efficient tool for data collection and decision making

Resulting process improvements can increase competitive edge

OPM can be used at multiple levels

Lower level charts roll up as a Top Management tool Positive or negative performance in OPM metrics impact your bottom line

T-Presentation-1 5/1/2020 40

Why should the Supplier employ OPM?

The evolving aerospace supply chain demands just in time methodology

– –

Flexibility Continuous flow

Today’s competitive environment requires a new way of thinking and managing…OPM can provide this edge

OPM provides quantitative method of validating cost reduction initiatives and can highlight new opportunities for further improvement

Tools learned under contract requirements translate to more competitive bids to your other customers

T-Presentation-1 5/1/2020 41

Supplier’s Commitment

Cross functional team for a one to two day event.

Facilities for the event

Availability to existing data

Management commitment to attend an out brief

Commitment to provide monthly inputs to LM Aero by the 15 th every month. of

Commitment to review the OPM and take appropriate action. Pr ovide comments for negative trends (a 3-month decline in OPM categories, a decrease in 3 or more scores in from the prior month, and KPI below baseline performance). Comments should include, as a minimum, root cause, corrective action and a recovery ECD.

T-Presentation-1 5/1/2020 42

Goals of Implementing OPM

• • •

Reducing Supplier Non-Conformances Increasing Process Stability and Predictability Limiting PQA End-Item Acceptance Activity OPM is a living document that can and should be adjusted based on supplier performance, improvements, declines, process changes, product additions, etc. to assure their complete value to our customer.

T-Presentation-1 5/1/2020 43

T-Presentation-1 5/1/2020 44