Transcript Document

Role of the Operator
What we were and what are we
asked to be
Walkerton Happened and our World
Changed
• At the start, if chlorine was added we were
asked to take Water Treatment Certification
• Now it is classed as Water Distribution
• What did the operator do and how has it
changed?
• From Jack of all trades to a guy who is held
accountable to the government and council
Back to School
• Some of us old fossils, 30 years had passed
and had lost our lunch boxes
• Council said, we are spending money on you,
you had better pass
• Since you have passed, your our in house
expert…….where do we go from here
Instant Expert
• We, the operator, have changed from this is
what we are doing----to what do you advise us
to do?
• This is a good thing for us.
• We get to shape our world.
• Think user friendly.
• Look at the plant, ask to bring someone in and
get it assessed
Direction
• Boat needs the rudder and a point of destination
• 10 years-20years-30years what do we want to
achieve
• Public Utility Board demands we are self
sustainable as a utility
• Look at what you have , put a life expectancy to it
• Remember spending, do it once, do it right
• Council still will want to buy a Pinto and expect
the Cadi, so google, call other operators,
investigate
Road Trip
• We have gone to Dryden and used their SCADA
• We have gone to Steinbeck and used their
concept for our main sewage pumping station
• We have gone to Canmore Alberta and used their
grit screen ideas
• We went to Xenia Ohio to look at the UV. (side
note, I believe we were the first to bring this
concept to Canada, but Saskatoon and Dryden
have come to see it and use it.
The Plan
• We have budgeted the money
• Options RFP(request for proposal)
• Design Build-one party takes it on-usually a
contractor-there is a risk and the price reflects itthey hire the engineer
• Design Bid Build-engineer designs-put out to
tender-contractor takes it and follows it-if design
is a question, there is extra cost to fix-you now
have two parties if there is a problem-a lot of
finger pointing and poor resolution
Who is accountable
• The more cooks the more problems in the kitchen…
• Lets look at the Bid Process-if it is engineered to specs,
they better be right-bid usually means the cheapest
wins-price driven
• Design Build Lease Back is when the engineer builds it
and has to run it- and it is turned back over to the
municipality
• Direct Assigned-if you have had a excellent contractorproven track record-stands by their work-they are
handed the project to build the best they can build.
What Has Uncle Dale Learned
• First and foremost-not written down-never
happened-CYA (cover your ass sets)
• When you hire an engineer-they had better
set time up to ask what do the operators want
again look at first comment again-not written,
never happened
• If possible-buy local-local reps-local parts-have
input in the design requesting this
Continue to Learn
• Remember this is YOUR building YOU have a
say
• If it is a Process Plant the lead engineer had
better be Process man
• If you have chosen an engineering company
because of one engineer, request their hours,
and that even if they leave the company they
finish the project
There Is More
• Look at number of hours of the major
engineer that it is not all on the tail end to fix
the screw-ups
• Collect every document, don’t sign off till it
works
• Have a filing system to record what and when
and by who
• If there is a verbal conversation, it is emailed
and recorded
Am I Ranting?
• Write in contract-user friendly-less time and
effort to run
• All major changes to be brought to your
attention and highlighted after project begins
• Hold involved people accountable, document,
document, document
• Be aware of safety concerns
No Brainers
• If you take your car to a mechanic and he
forget to put the oil in-don’t do it twice
• Tell anyone who will listen-cheapest is not the
best-I’m going to have heart surgery and
found him on Kijiji
• All basins need a drain pit
• Did I happen to mention-If it is not written
down…….never happened
Remember
• At the end of the project have a meeting and
make recommendation for the future
tender/projects for your municipality
• Grade yourself and the project
• If something failed-what-why-correction made
• We all make mistake, the trick is to get some
parties to admit to it, step up and fix it
• For me, I believe in people, ask if he or she has a
dog, go and watch, if the dog doesn’t come when
called walk away, if even the dog doesn’t believe
them maybe you shouldn’t either.
The End
• Learn form your victories as well as your
defeats
• Leave the ego at the door-share what you
have learned
• Martin Luther King said, our lives begin to end
the day we become silent about things that
matter.
• Leave the world, your place of employment
better than you found it.