Transcript Slide 1

OPERATIONS MANAGEMENT
MMS I
By
Suresh Dadlani
Email: [email protected]
Mobile:9820293399
October3,2010
PRODUCT
PROCESSES
HR
MATERIALS
OPERATION
MANAGEMENT
FACILITIES
LAYOUT
SCHEDULING
PLANNING
Operations Management
Product Definition Process
Product:
The end result of the manufacturing process to be
offered to the market place to satisfy a need or a
want.
Objectives
• Define product design and its strategic impact on organization
• Describe steps to develop a product design
• Using break-even analysis as a tool in selecting between product
alternatives
• Identity production process differences and their characteristics
• Describe the steps used in process design selection
• Understand how to use a process flow chart
• Understand current technology advancements and how they impact
process design
• Understand issues impacting the design of service operations
October3,2010
Product & Service Design
• Product design must support the business strategy
• Product design defines a product’s characteristics
- Appearance, materials, dimensions, tolerances,
performance standards
• Service industries must define both the service and concept
- Physical elements, aesthetic & psychological benefits
e.g. promptness, friendliness, ambiance
• Product and service design must match the needs and preferences of the
targeted customer group
October3,2010
Product & Service Design Steps
•
Step 1 - Idea Development
- Someone thinks of a need and a product/service design to satisfy it
e.g. customers, marketing, engineering, competitors,
benchmarking, reverse engineering
•
Step 2 - Product Screening
- Every business needs a formal/structured evaluation process
e.g. fit with facility and labor skills, size of market, contribution margin,
break-even analysis, return on sales
•
Step 3 – Preliminary Design and Testing
- Technical specifications are developed, prototypes built, testing starts
•
Step 4 – Final Design
- Final design based on test results, facility, equipment, material, & labor
skills defined, suppliers identified
October3,2010
Designing Services
• Service Characteristics
– Pure services
– Quasi-Manufacturing
– Mixed services
• Service Package
– The physical goods
– The sensual benefits
– The psychological benefits
• Differing designs
– Substitute technology for
people
– Get customer involved
– High customer attention
October3,2010
Design/Process Highlights
• Product and process design must support business and operation strategy
• Product steps include idea generation, product screening, preliminary
design and testing, and final design
• Break-even analysis is a tool used to screen processes
• Process designs range from project to batch to line to continuous
• Product design and process selection decisions are linked
• Process flow charts can be a useful tool in process re-design
• Product and process design can be significantly enhanced by proper
application of new technology
• Designing service processes produce intangible products with more
customer contact
October3,2010
Product design and process selection
• Idea development
– Technology push
– Marketing pull
• Product screening
– Marketing criteria
– Financial criteria
– Operational criteria
• Preliminary design and testing
– Prototyping
– Trial marketing
• Final design
Benchmarking
Reverse
Engineering
Concurrent
Engineering
Value
Engineering
Breakeven
Analysis
Remanufacturing
Break-Even Analysis: Graphical Approach
•
•
•
•
•
•
Compute quantity of goods that
must be sold to break-even
Compute total revenue at an
assumed selling price
Compute fixed cost and variable
cost for several quantities
Plot the total revenue line and the
total cost line
Intersection is break-even
Sensitivity analysis can be done to
examine changes in all of the
assumptions made
October3,2010
Breakeven Analysis
Cost
• Used to determine
volume needed to
cover total costs
• Often first step in
product
development process
• Assumes linear costs
Revenue
Total cost
Variable
cost
Fixed cost
Volume
Fixed cos t
Breakeven 
(unit price)  (unit var iable cos t )
Breakeven Example
A firm is considering marketing a new toothbrush. The
firm expects to sell each toothbrush for Rs.2.10 The per
brush cost of material, labor and overhead equals
Rs.1.45 The required investment in plant and
equipment is Rs.50,000.
How many brushes
50,000
 76,923
must be sold for the
2.10  145
.
firm to breakeven?
65,000(210
. )  50,000  65,000(VC)
VC  1331
.
If only 65,000 brushes
are expected to sell, what
must the variable costs
be in order to allow the
firm to breakeven?
Other Factors Impacting Design
• Need to Design for
Manufacturing – DFM
– Minimize parts
– Design parts for multiply
applications
– Use modular design
– Avoid tools
– Simplify operations
October3,2010
The product life cycle
Sale
s
Profit
Plan Intro Growth
Mat Dec
• Every product and service
follows a life cycle that spans:
– Planning
– Introduction
– Growth
– Maturity
– Decline
• Healthy companies manage
their product and service
offerings to insure a balanced
portfolio
Factor In Product Life Cycle
• Consider product
life cycle stages
–
–
–
–
Introduction
Growth
Maturity
Decline
• Facility & process
investment depends on
life cycle
© 2005 Wiley
Another Design factor-Organization
•
Old “over-the –wall” sequential design
process should not be used
–
Each function did its work and passed it to the
next function
•
Replace with a Concurrent Engineering
process
–
All functions form a design team working
together to develop specifications, involve
customers early, solve potential problems,
reduce costs, & shorten time to market
October3,2010
CE decision-making example
Concurrent Engineering
• Concurrent engineering can be defined as the
simultaneous development of project design functions,
with open and interactive communication existing among
all team members for the purposes of reducing time to
market, decreasing cost, and improving quality and
reliability.
Process Selection
• Process selection is based on five considerations
–
–
–
–
–

Type of process; range from intermittent to continuous
Degree of vertical integration
Flexibility of resources
Mix between capital & human resources
Degree of customer contact
Process types can be:
Project Process
Batch Process
Line Process
Continuous Process
October3,2010
Underlying Process Relationship Between
Volume and Standardization
October3,2010
Differences between Intermittent and
Continuous Operations
Decision
Intermittent Operation
Continuous Operation
Product variety
Great
Small
Degree of standardization
Low
High
Organization of resources
Grouped by Function
Line flow
Path of products
Varied, depends on product
Line flow
Factor driving production
Customer orders
Forecast of demand
Critical resource
Labor
Capital
Type of equipment
General purpose
Specialized
Degree of automation
Low
High
Throughput time
Longer
Shorter
Work-in-process inventory
More
© 2005 Wiley
Less
Volume and Process Choice-Summary
• Low Volume typically means
–
–
–
–
–
–
Project or Batch processes
Less vertical integration
More resource flexibility
Less capital intensity
Higher skilled labor
More customer involvement
– More customized products
– Make or assemble to order
strategy
October3,2010
• High Volume typically means
–
–
–
–
–
–
Line/continuous processes
More vertical integration
Less resource flexibility
More capital intensity
More specialized labor
Little to no customer
involvement
– Standardized products
– Make to stock strategy
Positioning Strategies
and the Product / Process Matrix
Flow Pattern
Process
Focus
Job Shop
Large Batch
Assembly Line
Product
Focus
Product Volume
The process-focused Project Shop
Characteristics
1. Makes a one-of-a-kind product (volume = 1)
2. Uses general purpose equipment
3. Has informal relationships with many vendors
4. Very little vertical integration
5. Flexible layout often with factors of production moving to job
The Job Shop
Characteristics
1. Makes many products in small volume
2. Uses general purpose equipment
3. Has informal relationships with vendors
4. Very little vertical integration
5. Departmentalized layout with chaotic flow
The Large Batch
(Cell, Flow or Hybrid Shop)
Characteristics
1. Makes several families of products in moderate volume
2. Uses general purpose equipment often fixtured
3. Little vertical integration
4. Hybrid layout with flow lines
The Assembly Line
Characteristics
1. Makes few products in large volume
2. Uses specialized high-volume equipment
3. Has formal relationships with vendors
4. May use vertical integration
5. Product-based layout with linear flow
Flow Pattern
Process Decisions
Flexibility More resource flexibility &
More customer
involvement
More vertical
integration & More
capital intensity
Product Volume
Efficiency
Technology and the Product/Process Matrix
Jumbled
Greater
need for
flexibility
Dominant
Technology decisions tend to
be long-term in nature and
greatly influence which
products and services a firm
is capable of providing to its
customers profitably.
Greater
need for
efficiency
Line
Low
Medium
Product Volume
High
Managing the balance between efficiency and
flexibility to optimize customer service
performance: Product and Service Strategy
Make
to
stock
Assem
ble to
order
Make
to
order
Raw
Materials
Raw
Materials
Raw
Materials
Prepare
Ingredients
Prepare
Ingredients
Prepare
Ingredients
Assemble
Menu Items
Work
In
Process
Assemble
Menu Items
Assemble
Menu Items
Finished
Goods
Process Design Tools
•
Process flow analysis is a
tool used to analyze and
document the sequence of
steps within a total process.
Usually first step in Process
Reengineering.
• Process Re-engineering is
a structured approach
used when major business
changes are required as a
result of:
– Major new products
– Quality improvement
needed
– Better competitors
– Inadequate performance
© 2005 Wiley
Facility Layout and Process Choice
© 2005 Wiley
Process Performance Metrics
October3,2010
Linking Design & Process Selection
•
Organizational Decisions appropriate for different types of operations
October3,2010
Intermittent VS. Repetitive Layouts
October3,2010
Product and Service Strategy Options
October3,2010
Process Decisions-Vertical Integration &
Make or Buy
• Vertical integration refers to the degree a firm chooses to do processes itselfraw material to sales
– Backward Integration means moving closer to primary operations
– Forward Integration means moving closer to customers
• A firm’s Make-or-Buy choices should be based on the following
considerations:
•
– Strategic impact
– Available capacity
– Expertise
– Quality considerations
– Speed
– Cost (fixed cost + variable cost)make = Cost (fixed cost + Variable cost)buy
Business are trending toward less backward integration, more outsourcing
October3,2010
Manufacturing Technology Decisions
•
Simplify first then apply appropriate technology
•
Information Technology: ERP etc.
•
Automation
•
Automated Material Handling:
– Automated guided vehicles (AGV)
– Automated storage & retrieval systems (AS/RS)
•
Computer-Aided Design (CAD) software
•
Robotics & Numerically-Controlled (NC) equipment
•
Flexible Manufacturing Systems (FMS)
•
Computer-Integrated Manufacturing (CIM)
October3,2010
Designing for the Customer
Value Analysis/Value Engineering (VA/VE)
Achieve equivalent or better performance at a lower cost while maintaining all
functional requirements defined by the customer.
1. Does the item have any design features that are not necessary?
2. Can two or more parts be combined into one?
3. How can we cut down the weight?
4. Are there nonstandard parts that can be eliminated?
Design for manufacturability: operability guidelines
1.
2.
3.
4.
5.
Design multifunctional and multiuse components and service elements
Design for ease of joining, separating, rejoining
Design for one-way assembly, one-way travel
Avoid special fasteners and connectors and off-line or misfit service elements
Avoid fragile designs requiring extraordinary effort or attentiveness
Manufacturing Systems
• Depend on the type of Plant in which we have to Operate
• Factors determining place of Production Planning & Control in an
Organization are:
> Type of Production
- Quantity of Finished Products
- Regularity of manufacture
> Size of Plant
> Type of Industry
Manufacturing Systems
Types of Production
• Broadly eight types, Grouped under three Heads
> Job Production
> Batch Production
> Continuous Production
Manufacturing Systems
Types of Production
JOB PRODUCTION
•
•
•
•
To meet specific customer requirements
Quantity is small, usually “one off” or “several off”
Special Projects, Models, Prototypes
Large Turbo Generators, Large Engines, Boilers, Ship Building
Manufacturing Systems
Types of Production
JOB PRODUCTION
• Types of Job Production
> Small numbers produced once
> Small numbers produced intermittently when needed
> Small number produced periodically, at known intervals
Manufacturing Systems
Types of Production
JOB PRODUCTION
•
Important Points related to Job Production:
- When produced once only, little scope of improvements in production techniques –
intricate method studies, special tools, Jigs & Fixtures.
- For repeat requirements – Tools, Gauges and other items, considered carefully, as these
affect Production time and hence the costs.
- Repeat orders may not require elaborate repeat planning and hence helps lowering costs
due to;
> Simplified Production Control
> Familiarity for dispatchers & Expediters with Designs
> Can take pre-emptive actions on anticipated difficulties
> Scheduling is simpler, master scheduling for repeat orders at regular intervals
> Possible to balance Production time and Plant Capacity
Manufacturing Systems
Types of Production
JOB PRODUCTION
• Non repetitive Job Productions – most common
Hence:
> Scheduling is based on assessment/estimates of Production times
> Estimates are based on judgment and often on then rule of thumb and hence experience and
skills of estimator plays key role
> Requires frequent reviews to take into account realities affecting deliveries and costs.
> As output depends on plant capacities and estimated times of jobs, it has possibilities of
resulting in queues of jobs for execution and hence could affect deliveries, costs, productivity and quality
due to changing schedules to meet priorities
> Longer the queue , more important is to explore the ways
- To increase plant capacity
- To review Sales Policy
- To judiciously discriminate order execution
Manufacturing Systems
Types of Production
Batch Production
• To manufacture a number of identical items, either to meet a specific
order or to satisfy continuous demand.
• When production of a batch is terminated, the plant and equipment are
available for the production of similar or other products.
• Policies regarding tooling, fixtures and other aids depend on quantities
involved – Batch.
Manufacturing Systems
Types of Production
Batch Production
• Types of Batch Production :
- Batch produced once
- Batch produced repeatedly at regular intervals- need based
- Batch produced periodically at known intervals
Manufacturing Systems
Types of Production
Batch Production
• Highlights/Features:
- Planning & Control depend on quantities – simpler with higher
volumes.
- Size of the batch and Scheduling for production are critical issues.
• Considerations for optimal Batch size:
- Set up costs
- Inventory Controls/Management
- Plant Capacity
- Delivery requirements of batches of different products.
Manufacturing Systems
Types of Production
Batch Production
• Other Considerations for Batch sizes:
- Governed by external orders, batch to suit Customers’ requirements
- Plant act as Vendor in some cases
- If for internal requirements, scheduling and batch size decisions are
relatively simpler.
• Batch sizes:
- Determines lengths of production run
- Affects Production schedule
- Affects batch size consideration of other Products
- Facilities are designed as a mix of Special Purpose and/or flexible
Manufacturing Systems
Types of Production
Continuous Production
• Specialized manufacture of identical articles on which equipment is fully
engaged.
• Associated with large quantities/high demand products
• Whereas in Job & Batch, Rate of Production exceeds Rate of demand,
Continuous production is justified only when its Rate of Production can be
sustained by the market
• Full advantage of repetitive operations comes in;
- Design of production auxiliary aids like special tools, jigs & fixtures,
Feeders, Material handling system, inspection devices, weighing systems
etc.
Manufacturing Systems
Types of Production
Continuous Production
• Types of Continuous Production Systems:
- Mass Production
- Flow Production
Difference being mainly on the kind of Product and its relation to the
Plant.
Manufacturing Systems
Types of Production
Continuous Production
• Mass Production:
- Large number of identical articles
- Though use of advanced mechanization & tooling, the equipment need not be exclusively designed
for the Product.
- Plant & Equipment are flexible to produce other Products involving same/similar production
processes.
- Possibilities of discontinuance of certain Product lines & to change to another article, without
excessive modifications in plant layout, except changes in tooling etc.
• Examples of facilities in Mass Production:
- Mechanised press shop
- Moulding facilities
- Automats
- Finishing shops
Manufacturing Systems
Types of Production
Continuous Production
• Flow Production :
- The plant, equipment, layout are primarily designed to manufacture specific Product.
- Limited flexibility in selection of Products with minor modifications in layouts or designs of models.
- Most efficient in design
- Less prone to human errors
• Examples :
- Automobiles
- Engines
- Household items
- Chemical Plants
Manufacturing Systems
Types of Production
Continuous Production
• Flow Production – Critical/Important features:
- Switch over to different kind of Product requires extensive tooling, changes in layout
and equipment policy
- Production planning & Control is far simpler
- Extensive efforts, use of best skills and experience for detailed planning before start of
production, but once started scheduling and Control is simple
- Output is constrained by:
> Production Capacity
> Production targets ( Sales requirements)
Manufacturing Systems
Types of Production
• Constraints in maintaining particular type of Production System:
- Uneven production rates , mismatch in production rates of different items
- Inventory Controls
- Product life cycle changes
- Machine reliability
- Design changes
- Competition
Manufacturing Systems
Size of Plants
•
•
•
Larger the plant, more complicated are activites
Issues relate to :
- Planning ( Centalised/Decentralised)
- Coordination between departments, high risks of lack of coordination
- Man management
Centralisation helps in :
- Methods planning
- Standardisation & Simplification of Products & Materials
- Purchasing & Storing of materials
- Superior coordination
- Possibilities for better utilisation of facilities and past experience.
- Better inventory management
- Less risks of damages and obsolescence
- No empire building of satellites and hence better effectiveness
Manufacturing Systems
Size of Plants
• Too much of Centralisation may result in:
- Cumbersome planning & control
- Detached from reality
- Slow to react
- inefficiency in the system
Manufacturing Systems
Type of industry
•
•
•
•
•
It is the field in which plant specializes
Classified into several ways:
- Availability of kind of labor in different geographical locations
- Demand of different skills
- Investment policies
- Materials, Processes or end products
Division on the basis of materials used is not common, as usually most industries
use variety of materials
Classification by end Products is logical, as covers materials , methods and skills.
- Complicated due to large number of Products & Plant involved with
multiple Products
Simpler method for classification is by process
- Material Fabrication
- Chemical Process etc.
Manufacturing Systems
Type of industry
• Usually labeled according to the main activities, e.g.,
- Vehicles and accessories
- Leather and leather goods
- Textiles
- Chemicals
- Metal manufacture/processing
- FMCG, Food, drinks etc
- Pharmaceuticals
Manufacturing Systems
To summarize
•
•
•
•
•
•
•
•
•
•
With very few exceptions, no industry is confined to one type of production process.
Batch production at some or the other stages recurs in all the industries and statistically accounts for over
60% of the sample.
Batch production is more complex than Continuous Production for Production Planning & Control.
Continuous Production carries highest risks together with highest efficiencies.
Job production requires highest skills but provides lower efficiencies.
Plant utilization is the highest in Continuous Production followed by the Batch Production with lowest for
Job Production
The best flexibility in operation lies in Batch Production process and lowest with Continuous Process.
Highest skills requirements for Job Process and generally lower in Continuous.
High level of specialised skills required in setting up Continuous process plant, as
- Mistakes costs recurring losses
- Expensive to correct
Capacity Planning and increasing capacity for Batch Process is quicker, including though sub contracting.
Manufacturing Systems
Food for thought
•
Continuing with the Case of Tata Motors in hand, please decide on which MAKE
or BUY decision and in case of MAKE which manufacturing process will you follow
for;
 Assembly line of the vehicles
 Engines
 Gear box
 Dashboard
 Wind screen
 Horn
 Battery
 Music system
 Gear and Accelerator pedals
 Steering lever hand grip
And reasoning for the same.
Manufacturing Systems
Food for thought
•
•
Will you maintain the decision for ever or will you have review based on some
factors/milestones in future.
What major factors will you consider on going against the Buy decisions, for some
of the items, where though Making may be more expensive than Buying.
 Each Group to submit their recommendations in one page today at 1240pm, with
R. Nos written in the sheet
 The Group to present the approach, strategy with logical reasons next week. Each
group will have 10 min to present incl discussion, Q&A and this will mean 10 marks
for the internal out of 40 for the Semester.