IEA HPP Annex 28
Test procedure and seasonal performance calculation
of residential heat pump with combined space and
domestic hot water production
IEA HPP Annex 28 N 139
IEA HPP Annex 28
Introduction to the project
Workshop IEA HPP Annex 28
8th International Heat Pump Conference, Las Vegas, 30 May 2005
Carsten Wemhöner, Operating Agent IEA HPP Annex 28
Institute of Energy, University of Applied Sciences Basel
2
Outline of the presentation
Background of the project
Project structure of the IEA HPP Annex 28
Results of the state-of-the-art survey, conclusions
Overview of national contributions
Outline of the workshop
3
Background of IEA HPP Annex 28
Source: KWT
Source: Stiebel Eltron
4
Background of IEA HPP Annex 28
Solution to overcome this problem of missing comparability
Uniform technical data (component testing)
Possibility of comparing different heat pump system layouts
or heating systems (system calculation)
Energy labelling (indication at point of sale)
5
Background of IEA HPP Annex 28
Manufacturers: Provision of uniform technical data
Designers:
(competitiveness)
Technical information for system comparison
Customers:
Product information for purchase decision
(energy costs, environmental impact)
Policy makers: Key values to set targets in directives
(Kyoto protocol)
based on uniform and transparent testing and calculation
6
Objectives IEA HPP Annex 28
Test procedure with a minimum of testing expense
Easy-to-use calculation methods
for combined operating heat pump systems for
space heating and domestic hot water production
as recommendation for standardisation committees
7
Objectives IEA HPP Annex 28
Transparent comparison of different heating systems
Reduction of trade barriers
Consumer confidence
Promotion of HP as environmentally sound technologies
Stimulation of technology improvements
8
Facts IEA HPP Annex 28
Participants:
AT, CA, CH (operating agent), DE, FR, JP, NO, SE, USA
Project time:
Jan 2003 – May 2005
Final report: October 2005
Information:
http://www.annex28.net
9
Structure of IEA HPP Annex 28
Task 1: State-of-the-art survey
Systems on the market and under development
Existing standards for combined operating systems
Task 2: Test procedure with minimum of testing expense
General to cover different system configurations on the market
Enough data to perform the seasonal performance calculation
Task 3: Easy-to-use calculation method
"Hand calculation method" without extensive computation
Transparent method on the basis of publicly available data
10
State-of-the-art survey - markets
Europe:
Mostly alternate operating systems
Some simultaneous operating systems, research activities
North-America
Mostly simultaneous operating systems with desuperheating
Air-to-air heat pumps for combined air-conditioning/DHW
Japan
Little combined operation
Market introduction of system with combined floor heating/DHW
11
State-of-the-art survey - standards
Europe
Testing standards for single operation modes heating and DHW
European calculation method under development, national regulations
North-America
Testing and calculation for single operation modes heating and DHW
Combined operation for Air-to-air heat pumps with desuperheater
Japan
Testing and calculation for single operation modes
Calculation by adaptation of American standard methods
12
Conclusions - Scope
Alternate and simultaneous combined operating systems:
Alternate: switching of the heat pump from space heating to DHW
operation
13
Alternate operating system layout
Source: WPZ Töss
14
Conclusions - Scope
Alternate and simultaneous combined operating systems:
Alternate: switching of the heat pump from space heating to DHW
operation
Simultaneous: space heating and DHW heat production at the same
time, e.g. by
Desuperheating of compressed refrigerant
Subcooling of condensed refrigerant
Cascade system layout
Extraction of heat from the heating system supply line
15
Simultaneous operating system layout
Source: TU Dresden
16
Conclusions - Scope
Alternate and simultaneous combined operating systems:
Alternate: switching of the heat pump from space heating to DHW
operation
Simultaneous: space heating and DHW heat production at the same
time, e.g. by
Desuperheating of compressed refrigerant
Subcooling of condensed refrigerant
Cascade system layout
Extraction of heat from the heating system supply line
Hydronic and air distribution system
17
Conclusions – System boundary
Generator with attached storages (heating buffer, DHW) and back-up
generators (e.g. supplementary electrical resistance heating)
Source:
prEN 14335 general part
18
Conclusions - Testing
Black-box testing
System testing for highly integrated layouts
Based on existing standards for single operation modes
Heat pump
DHW storage/
Instantaneous water
heater
Back-up heater
19
Conclusions - calculation
Based on bin-methodology
Relative energy
requirement in the bin
corresponds to ratio of
bin areas
(weighting factor)
Operation conditions at
operating point valid for
the entire bin
20
National contributions - focus
21
Structure of the Workshop
Part 1: Introduction
Part 2: Calculation method
Part 3: Experiences from systems in the field monitoring
Part 4: break
Test procedure
Coffee
Part 5: Conclusions, Implications and Discussion
Transparencies can be downloaded at Annex 28 website
http://www.annex28.net
22
Thank you for your attention!