Status report of LIT (program Lib.,NICE, LabVIEW, EDH)

Download Report

Transcript Status report of LIT (program Lib.,NICE, LabVIEW, EDH)

JINR Network Security,
Failover Measures,
Network Monitoring
V. Ivanov
Laboratory of Information Technologies
07.07.2015
V.Ivanov
th
5 Workshop on the Scientific Cooperation between German Research Centres and JINR
1
Leaders from JINR:
V. Ivanov
V. Korenkov
Leader from Germany:
H.Frese
Period of realization:
2003-2006
Resources in 2004 (funding from BMBF):
25 k€
Purchase of materials and equipment (k€):
25 k€
07.07.2015
V.Ivanov
th
5 Workshop on the Scientific Cooperation between German Research Centres and JINR
2
JINR Gigabit Ethernet infrastructure creation
2003 - first step
More than 10 kilometers of 16-wire single-mode fiber optic
cable were placed into so-called “cable canalization” in
the form of a ring on LNP site, and as a cable segment to
the LHE-LPP site.
In cooperation with a federal “Naukograd Dubna”
programme 1.5 kilometers of fiber optic cable connected
the JINR network with the Dubna-City network.
07.07.2015
V.Ivanov
th
5 Workshop on the Scientific Cooperation between German Research Centres and JINR
3
07.07.2015
V.Ivanov
th
5 Workshop on the Scientific Cooperation between German Research Centres and JINR
4
Installation of the Gigabit Ethernet equipment: Gigabit Ethernet
Interface card for the main Catalyst 6509 switch and Cisco Catalyst 3550
family switches (8 devices with optical gigabit interfaces) in the
Laboratories and Administration.
07.07.2015
V.Ivanov
th
5 Workshop on the Scientific Cooperation between German Research Centres and JINR
5
N
Item of expenditure
Firm
1.
Equipment for Gigabit Ethernet backbone structure :
Plan, k€
USA
7,95
7,90
completed
Cisco Catalyst 2970G-24TS-E
USA
4,50
4,33
completed
12,23
8xDGS-703 1-port Gigabit Fiber Converter, LX
USA
2,73
2,73
canceled
2xDGS-707 1-port Gigabit Fiber Converter, SX
USA
0,32
0,32
completed
4xDEM-311GT 1-port mini-GBIC SX MM
USA
0,65
0,65
completed
6xDES-3226S Switch 24x10/100Base-TX,19"
USA
2,48
2,48
completed
6xDES-132T Module 2x1000Base-T
USA
0,66
0,66
completed
HDD Maxtor 80 GB 6y080P0 DiamondMax Plus 9
USA
0,06
0,06
completed
Cannon MF 5630
Japan
0,40
0,40
completed
Main Network Centre Structure
Subtotal,(€)
Air Conditioner "Gree"
4.
Realization
stage
Cisco Catalyst 3750G-24TS-E
Subtotal,(€)
2.
Actual, k€
7,30
China
5,25
Other expenses
Total (k€):
25,00
5,25
completed
0,22
completed
25,00
07.07.2015
V.Ivanov
th
5 Workshop on the Scientific Cooperation between German Research Centres and JINR
6
In March 2004 after tests of the lines’ quality, conductivity
tests, etc., the Gigabit Ethernet backbone was put into operation
07.07.2015
V.Ivanov
th
5 Workshop on the Scientific Cooperation between German Research Centres and JINR
7
In the year 2004:
The network of
Laboratory of
Information
Technologies was left
as a part of the JINR
backbone, meanwhile
the rest JINR divisions
(7) were isolated off
backbone with their
Catalyst 3550 switches.
Controlled-access
(Cisco PIX-525 firewall)
at the entrance of the
network.
07.07.2015
V.Ivanov
th
5 Workshop on the Scientific Cooperation between German Research Centres and JINR
8
07.07.2015
V.Ivanov
th
5 Workshop on the Scientific Cooperation between German Research Centres and JINR
9
As a result, we have star-like logical topology of the JINR
Gigabit Ethernet backbone with the Cisco Catalyst 6509 and Cisco
Catalyst 3550 switches in the center of the core, and the Cisco Catalyst
3550 switches in 7 JINR divisions (in 6 Laboratories and in the JINR
Administration), and Cisco Catalyst 3750 switch in LIT.
DLNP
LIT
07.07.2015
V.Ivanov
th
5 Workshop on the Scientific Cooperation between German Research Centres and JINR
10
Characteristics of the network:
•High-speed transport structure(1000 Mbit/sec);
• Security-Controlled access (Cisco PIX-525 firewall) at the entrance of the
network;
•Partially isolated local traffic (6 divisions have their subnetworks with
Cisco Catalyst 3550 as a gateway).
07.07.2015
V.Ivanov
th
5 Workshop on the Scientific Cooperation between German Research Centres and JINR
11
Network Monitoring
Incoming and outgoing traffic distribution
Total year 2004
36.1 Tb Incoming
Total year 2004
43.64 Tb Outgoing
07.07.2015
V.Ivanov
th
5 Workshop on the Scientific Cooperation between German Research Centres and JINR
12
07.07.2015
V.Ivanov
th
5 Workshop on the Scientific Cooperation between German Research Centres and JINR
13
What issues have to be solved next:
Partitioning the entire JINR network, when the JINR network
address space will be subdivided into 8 parts in accordance with
the number of main JINR divisions (7 Laboratories and
Administration), in order to use the JINR network backbone only
for transport purposes, and to increase security level;
Measures to provide fail-over system level with required
redundancy of the backbone components;
Network security issues – network security provision is a
process, which needs new ideas, security state monitoring
and analysis, resources in hardware, in software, and human
resources;
System to monitor and control the network performance.
07.07.2015
V.Ivanov
th
5 Workshop on the Scientific Cooperation between German Research Centres and JINR
14
The solution is to enforce the core of the JINR backbone.
With the goals to raise the level of reliability, availability, and avoid a single
point of failure in the core, we consider the installation of the Cisco
Catalyst 6506 switch with similar set of modules, as the main 6509 switch
has. Both 6509 and 6506 switches will work in parallel in the core of the
backbone. In case of any component failure in either switch, the core of the
backbone will be still alive, and after repositioning of the clients’ fiber
optic pairs from a failed switch the whole network will provide access to its
services giving time to repair the failed equipment.
Table of expenditures within the project in 2005
№
Item of
expenditures
1 Catalyst Switch
6506
Firm
Cisco
Systems
Price,
EUR
Quantity
50000
1
Sum,
EUR
07.07.2015
V.Ivanov
th
5 Workshop on the Scientific Cooperation between German Research Centres and JINR
50000
15