Transcript Document
Presentation to Industry Action Plan for Summer 2004 April 1, 2004 [email protected] 225/219-3434 Overview • • • • • • Current Status of Baton Rouge Area Re-classification to Severe Chapter 22 NOx Rule HRVOC Workgroup HRVOC Survey Action Plan for Summer 2004 2 Current Status of BR Area • 1-Hr Standard No more than 3 exceedances in 3 years at any monitor (10 monitors in BRNA) Exceedance =/>125ppb (truncated) Capitol and LSU were out for 01-03 and already have 4 hits for current 02-04 period See Table 3 1-Hr Ozone Status Monitor 2002 Baker 2003 2004 02-04 03-05 1 1 2 2 Capitol 2 2 4 2 LSU 1 3 4 3 Port Allen 1 2 3 2 B Plaquemine 1 1 2 1 2 2 2 17 12 Pride Carville Grosse Tete Dutchtown F Settlement Total 5 11 1 4 Current Status of BR Area • 8-Hr Standard 4th highest value each year is averaged over a 3 year period Exceedance =/> 85ppb (truncated) LSU monitor was out for 2001-03 See Table 5 8-Hr Ozone Status 2002 (4th Hi) 2003 (4th Hi) 01-03 2004 (4th Hi 2004 (trigger) Baker 83 88 84 60 84 Capitol 79 82 80 54 94 LSU 78 100 86 59 77 Pride 75 80 77 60 100 Port Allen 80 89 84 61 86 B Plaquemine 73 81 77 59 101 Carville 75 89 84 58 91 Grosse Tete 74 81 78 61 100 Dutchtown 75 77 75 58 103 F Settlement 75 82 77 59 98 1 to 3/21 Monitor (ppb) Monitors Out 6 1-Hr Summary • LSU monitor already has 3 hits for 2005 • Capitol, Port Allen, and Carville have 2 Exceedances in 2004 and 2005 (especially at LSU) are crucial or the area will be out of attainment in 2005 – the Clean Air Act attainment year. 7 Re-Classification to Severe • BR was originally classified serious with an attainment date of 1999. • Modeling showed that the area was being affected by ozone transport from Houston. • Under EPA guidance, an extension to 2005 was granted based on transport. • Under pressure EPA pulled the approval and the area was bumped-up to severe with a 2005 attainment date. (June 23, 2003) 8 Consequences of Bump-Up • Definition of major source reduced from 50 tpy to 25 tpy for both NOx and VOC (revise Chapters 21 and 22) • Offset requirements increase to 1.3 with LAER and 1.5 to avoid LAER (Lowest Achievable Emission rate) • Reformulated Gasoline (RFG) • Section 185 fees for failure-to-attain by2005 9 Section 185 Fees (rule in comment period until 4/2) • Fees start in 2007 (for 2006) and continue until the area is in attainment • Exemptions: (EPA opposed, no exemptions) if equipped with minimum 95% control; or if equipped with BACT • Baseline is the average of annual emissions of VOC and NOx from non-exempt sources for the most representative 3 years between 1998 and 2002. (EPA opposed, must be 2005) 10 Section 185 Fees (continued) Fee = [A-(80% x B)] x C A = Total actual VOC and NOX emissions in previous year from non-exempt sources B = Baseline amount (tons) C = $5,000 per ton adjusted by CPI to subject year (approximately $8,000) 11 Chapter 22 NOx Rule • Promulgated March 2002 • Applicable in 9 parishes during ozone season • Establishes emission factors for boilers, heaters, furnaces, turbines and engines • Sources must be in compliance by 5/1/05 • Average point NOx reduction is 30% • Model shows attainment in 2005 Revision for severe classification by June 23 12 HRVOC Workgroup • 1-hour ozone design value has dropped from around 170 ppb in the early 90s to the low 130s ppb today • VOC and NOx have been dropping steadily since the early 90s • See VOC and NOx graphs 13 Point Source VOC Emissions Trend Baton Rouge Nonattainment Area (1990-2002) 45000 40000 TONS PER YEAR 35000 30000 25000 20000 15000 10000 5000 90 93 94 95 96 97 YEAR 98 99 00 01 02 Data Source: DEQ 14 Point Source NOx Emissions Trend Baton Rouge Nonattainment Area (1990-2002) 80000 TONS PER YEAR 70000 60000 50000 40000 30000 20000 10000 0 90 93 94 95 96 97 98 99 00 01 02 YEAR Data Source: DEQ 15 HRVOC Workgroup (continued) • Continuing to have exceedances (11 in 03) • Plot shows rapid ozone formation events (greater than 40ppb/hr rise) - see graph • Similar spikes in Houston, Texas 2000 Air Study implicated HRVOC – 1,3-butadiene, acetaldehyde, butenes, ethylene, propylene, toluene and xylenes 16 Sept 11, 2002 Ozone 180 Capitol 160 LSU B Plaquemine 120 100 P Allen 80 60 40 20 22 20 18 16 14 12 10 8 6 4 2 0 0 O3 ppbv 140 Hour Capitol Baker LSU Port Allen Carville Bayou Plaquemine Pride 17 HRVOC Workgroup (continued) • Workgroup (DEQ, Industry, Environmentalists) formed to evaluate role of HRVOC. • Recommendations: Add NOx at Dutchtown, Met at LSU and Carville Add continuous VOC at LSU, Capitol, Carville Add VOC canister every 6th day at others Record 5 minute data in addition to 1 hour average Develop database for past and future data, perform statistical analyses 18 VOC Site NOx O3 Met 3-hr (daily) 3-hr (3-days) Capitol * Trigger (1 ppm of TNMHC)(3 ) LSU * * * * Bayou Plaquemine Port Allen Pride Dutchtown * * Baker Carville * Grosse Tette French Settlement 24-hr (6-days) * * * Southern South Scotlandville * 19 HRVOC Survey • Purpose was to identify sources of HRVOC (TEDI-toxics, EIS-total VOC, TRI-facility) • Sent to 148 facilities in BR area • 62 met criteria of >1,000 lbs/yr HRVOC emissions and submitted information • Results: See graphs 20 HRVOC Emissions by Chemical xylene 6.4% butenes 6.4% acetaldehyde 2.8% 1,3-butadiene 2.2% ethylene 44.8% propylene 12.5% toluene 24.9% Total = 3,500,000 lbs 21 HRVOC Emissions by Emission Type non-routine 1.26% start-up/shutdown 3.25% accidental 9.33% loading/unloading 0.97% other 0.10% routine 52.45% fugitives 32.63% 22 Breakdown of Routine Category analyzer 6% wastewater 2% Cooling Tower 2% miscellaneous 6% process vents 47% Flare 8% Tank/Silo 29% 23 HRVOC Emissions by Estimation Method educated guess other 2.9% 1.4% calculated 6.2% measured 8.7% modeled 0.6% factors 35.5% engineering estimate 9.5% estimated 13.9% material balance 21.2% 24 Action Plan for Summer 2004 • Review Environmental Management System Are all emissions being accounted for? Can emissions be lowered by reducing at source, recycling, recovery or treatment? Are measured values being used, where available, to estimate the quantity of emissions? Are the latest and best factors and estimation methodologies being used? 25 Action Plan for Summer 2004 (continued) • Fugitives – before Summer - consider remote imaging to survey regulated and non-regulated components where HRVOC could leak, make extraordinary attempts to fix tagged leakers • Flares – always operate within design, delay discretionary flaring to evening • Cooling Towers – check inlets weekly for HRVOC, fix leaks as soon as possible • Wastewater – reduce HRVOC wherever possible 26 Action Plan for Summer 2004 (continued) • Analyzer Vents – route to flare or minimize • Shutdowns – do early or postpone until after ozone season • Maintenance/Equipment Opening – delay until evening, refueling in late evening • Seasonal Activities – delay painting until later in year, do grass cutting in evenings, etc. 27 Summary • Ozone exceedances in downtown BR in 2004/05 will put the area out of attainment. • If this happens, emission fees will kick-in. • Facilities are asked to develop action plans to reduce emissions, especially HRVOC, but also, other VOC and NOx. 28 Fugitive Monitoring • EPA is preparing an alternate to Method 21 that will allow Remote Imaging by end 04. laserimagingsystems.com leaksurveysinc.com patinc.com/Sherlock.htm 29