De nieuwe ISO 17025
Download
Report
Transcript De nieuwe ISO 17025
The new ISO/IEC 17025
11 May 1999, Beltest
Peter Vermaercke
07/07/2015
Beltest ISO 17025
1
Goals of the new standard based on
lessons from the past
•
•
•
•
•
A document for laboratories (not accredited also) written in lab
language, but it can be used for assessments
A document applicable to both testing and calibration laboratories, that
if applied OK generates technically valid results
Adjust the standard to new ideas, new experiences on the field and new
demands (e.g. professional judgement, developments of new methods,
sampling)
Assure the conformity with ISO 9001 stating that ISO 9001 doesn’t
guarantee competence
A full alignment between ISO and CEN through parallel voting
07/07/2015
Beltest ISO 17025
2
A long way before getting there
•
•
•
•
•
•
'82: first ISO guide 25
'89: draft used to make up EN 45001 under EC pressure
'90: ISO/IEC guide 25
'94: ISO/CASCO WG 10 where both accreditors and
laboratories participate
'97: Committee Draft for public comments and from guide to
International Standard
’98: Further drafts and checking against ISO 9001/2
07/07/2015
Beltest ISO 17025
3
The current status is that the end is
near
• Voting ended beginning ‘98
• Formally accepted as standard, but 7 countries (USA, Japan,
Australia, some Europeans) voted against
• New comments in new draft April 20, 1999 (expectation: only a
few votes against now)
• Then: publication of ISO/IEC 17025 with two month voting, no
comments
• End ‘99: formal publication
• EN 45001: Problem: parallel voting required parallel enquiries!
Since this was forgotten: another delay
07/07/2015
Beltest ISO 17025
4
The text has changed a lot, not the
essence
• Two parts : 4. Management and 5. Technical requirements
• Technical: broader scope and, more emphasis on measurement
uncertainty, traceability separated for calibration and testing labs and
opinions and recommendations allowed
• QS: Relationship with customer, evaluation suppliers, cause
analysis, effectiveness and preventive actions, opinions
• Also ‘guidance notes’ (cfr L1/Beltest)
• Annex A: Relationship with ISO 9000
• Annex B: specific requirements for competence stating that every lab
is different and needs a different approach according to size, type of
activities, … (lab has to show)
07/07/2015
Beltest ISO 17025
5
Full compliance with ISO
9001/2:1994 is guaranteed!
• Compliance with ISO 17025 guarantees that the lab operates in accordance
with ISO 9001:1994 or ISO 9002:1994, not the other way around
note: compliance of QS for ISO 9001 engages in design/development of new methods or
combining standard/non-standard test methods
note: ISO 9002 for standard methods
• But ISO 17025 is not a sector specific approach of ISO 9000 (as others),
ISO 9000 is foreseen to be revised in ‘2000 (no solution):
•
Note: but, the demand of the labs cause mainly new adjustments in the QS for an alignment
towards ISO 9000, no rewriting in full! ILAC asks that the lab gives clear indication where the
existing documentation addresses the new requirements and identify additions
07/07/2015
Beltest ISO 17025
6
How to implement it in assessments
is not clear yet
• ILAC wants a harmonised approach: Workgroup on
text on ‘bridging’ document between EN 45001 and ISO 17025
and ISO guide 25 (also flexible scope?);
text on transition period (min. 1 year, max. 2 years!);
• Beltest wants to implement ASAP since we are already close to
ISO 17025
auditing in normal way + special remarks on typical new items
for one year
no NBN required to start! No new L1 required
training of assessors
07/07/2015
Beltest ISO 17025
7
Future changes are foreseen but not
for now
• Revision of the whole EN 45000 structure
difference between 45001/EN45004/EN45011?;
new structure on ‘functions’;
alignment of all ISO guides, EN standards to ISO standards
(as done for ISO 17025);
now started: alignment of EN 45003, ISO guide 58, …(concerning auditing
and accreditation of bodies) to ISO standard
don’t worry: several years ….
07/07/2015
Beltest ISO 17025
8
Legend
• New element to be verified by assessor
no big change in QS and in most cases already there
since it was already mentioned in L1
• New element to be Verified by assessor
either big change in QS or in most cases not yet there
• Tips for dealing with this for lab
• Tips for assessor to be realistic
07/07/2015
Beltest ISO 17025
9
4.1 Organisation
• Legal identity
• Satisfy needs of the client, regulatory authorities and authorities
providing recognition
• Protection of clients info, property rights, protection of electronic
storage and transmission of data
• Impartiality, independence, integrity
• Responsibilities of key personnel of the large organisation that
influence testing activities (QM, Tech M, Support M)
• Organisational links, responsibilities
• Technical manager, supervision
07/07/2015
Beltest ISO 17025
10
4.1 Continued
Replacement defined
QM responsible for QS that has direct access to direction
Organisation chart of departments and organisation chart of
functions in manual
General function descriptions in manual
Detailed function descriptions and organisation chart with
names and replacements in separate documents
Only for people influencing quality
07/07/2015
Beltest ISO 17025
11
4.2 Quality System
• QM: policy, system, programmes, procedures, instructions
communicated, understood, available, implemented
• Quality Policy, issued by ‘chief executive’ and contents defined
• Objectives
• QM that makes reference to supporting procedures (also
technical) and define the structure of the QS
• Make a manual a more static document e.g.
policy ( years …) in manual, objectives (yearly) in separate
documents or in mgt review
07/07/2015
Beltest ISO 17025
12
4.3 Document Control
• Control of QS documents:
internal data: manual, procedures, instructions, test methods,
calibration methods, …
external data: regulations, standards, drawings, software, specs,
….
written, digital, photo’s, …
• Document approval
all documents issued to staff shall be reviewed and approved
master list (or equivalent) with revision status and distribution
07/07/2015
Beltest ISO 17025
13
4.3 Document Control
Authorised editions are available at the location needed
(right document at the right place)
Invalid or obsolete documents removed or assured against
unintented use
Obsolete retained documents are marked
Periodic review and revision of procedures
Changes should be reviewed and identified
Amendments by hand defined
Description of computerised system also for changes
easily assessable: don’t do any nit picking
07/07/2015
Beltest ISO 17025
14
4.4 Review of requests, tenders and
contracts
• Procedures for review of requests, tenders and contracts
requirements including the methods to be used are defined and
documented
capacity and resources to meet the requirements
appropriate test method is selected meeting the clients’
requirements
difference between request/tender resolved
• Records of reviews of request, tender, contracts
• Client and affected personnel is informed about any
requirement/deviation
07/07/2015
Beltest ISO 17025
15
4.4 Contract review: ctd
• For internal clients more simplified
• Capacity, skills and experience mainly reviewed for new things
• Review of non repetitive routine tasks: date and initials of Lab
responsible
• Review of repetitive routine tasks: only review of initial enquiry
• Also oral contracts allowed? Yes, but review to be made and
client to be informed on the choice of the method
07/07/2015
Beltest ISO 17025
16
4.5 Subcontracting
• For unforeseen reasons or on a continuing basis to a competent
(ISO 17025) subcontractor
• Client is advised
• Lab is responsible (except when client or authority specifies
subcontractor)
• Register
07/07/2015
Beltest ISO 17025
17
4.6 Purchasing
• Procedure for selection and purchasing of services and products
that affect the quality
data on services and supplies
reviewed and approved technical content
procedure for evaluation of suppliers records of evaluations and
list of approved
• Procedure for reception and storage of consumables
• Procedure for incoming inspection and verification to specs
• Make a simple system
• Don’t ask an evaluation or a list for every bottle, glas, ...
07/07/2015
Beltest ISO 17025
18
4.7 Service to the client
• Co-operation to clarify requests and the performance in relation
to the work performed
• In QM general clauses on
reasonable access for witnessing
preparation of items needed for verification purposes
how to give advice (is stimulated in this standard)
information of deviations
• Obtain feedback from client by surveys and discuss in mgt.
review
07/07/2015
Beltest ISO 17025
19
4.8 Complaints
•
•
•
•
Procedure for resolution of complaints
Investigation of corrective actions see 4.10
Requires more paper: simple form or informatics
Don’t be satisfied with one complaint or a narrow definition of
complaint
07/07/2015
Beltest ISO 17025
20
4.9 Control of non conforming work
• Procedure what to do if an aspect of your test does not conform
with the procedure
evaluation of the significance and remedial actions
if necessary, client informed and work recalled
• If this non conforming work could reoccur: corrective action
procedure (see 4.10) (feedback to the system)
• Examples: QC, Calibrations, Consumables checks, staff
observations or supervision, checking of test reports, interlab
results, …
• Simple system, no separate form needed for everything!
•07/07/2015
Verify this for QC, interlab
Beltest ISO 17025
21
4.10 Corrective actions
•
•
•
•
•
•
Procedure for CA (corrective actions = feedback to QS)
Cause analysis: determine root cause
Corrective action: to prevent recurrence!
Monitor results of CA’s: are they effective?
Additional audits
Make on your form or database of CA’s clear: What is problem,
What is cause, Who will do what CA by When = action plan
When has it been done? Has it been implemented effectively?
• Use e.g. internal audit for check of effectiveness
• Check of the effectiveness is difficult, but do it
07/07/2015
Beltest ISO 17025
22
4.11 Preventive actions
• PA’s = opportunities for needed improvement and to reduce the
likelihood of occurrence of potential sources of non
compliances
• Action plan
• Control for effectiveness
• Use a macroscopic view on data: several IQC, several EQC,
overview of complaints and overview of internal and external
audits to look for similar problems occurring in other fields,
analysis of objectives, … e.g. in a management review
• Don’t be satisfied with one PA
07/07/2015
Beltest ISO 17025
23
4.12 Control of records
•
•
•
•
•
•
Technical and QA-records
Retrievable and traceable, period
Storage, security
Electronic data
Traceable to the job, the person, the date
Mistakes (crossed out, correct value aside, person, …)
• easily assessable: don’t do any nit picking
07/07/2015
Beltest ISO 17025
24
4.13 Internal audits
•
•
•
•
•
•
•
•
•
•
Planning under responsibility of QM (1 year)
All elements, including testing
Trained, qualified and independent personnel
CA’s defined
Records of audited activities, findings, CA’s
Verification of effectiveness
Use same principle as CA
Don’t be satisfied with one CA
At least two auditors are needed,
Reward a detailed audit
07/07/2015
Beltest ISO 17025
25
4.14 Management reviews
• Periodic review for effectiveness of QS (1 year)
• Complete content defined:
Suitability of policy and procedures
Reports of managerial personnel and outcome of audits
(internal and external)
CA’s and PA’s
EQC, IQC, Client feedback (survey?), complaints
Changes in volume / type of work
Resources and training
Objectives of current year and next year
07/07/2015
Beltest ISO 17025
26
4.14 Management review
• Record of review and actions with action plan
• Make a fixed agenda of these meetings (if points are not relevant
just say it) and make minutes of the meeting with an action plan
• Don’t be satisfied with one action on an action plan, but reward
a detailed review
07/07/2015
Beltest ISO 17025
27
5.1 General
• The extend to which the factors human, accommodation, validation
of methods, equipment, measurement traceability, sampling, test
items contribute to the total uncertainty of measurement differs from
test to another. These factors shall be taken into account in
developing methods, procedures, training and qualification of
personnel, selection and calibration of equipment, …
• Full measurement uncertainty budget or, if impossible, estimation
of important factors
• Talk to your colleagues
• Auditing is sampling, so audit at least those elements for every test
for sure
07/07/2015
Beltest ISO 17025
28
5.2 Personnel
• Ensure competence and authorise (including date) operation of
equipment, performing tests, evaluation of results, signing reports
• Under training: supervision
• Qualified upon education, training, experience, skills and records
special personnel certification can be mandatory
note: see special EAL/EA/ILAC guides
statistical qualification: link it to your uncertainty budget
• Goals for education, training and skills: training needs
• Personnel under employment or under contract (QS and supervision)
07/07/2015
Beltest ISO 17025
29
5.2 Personnel
• Job descriptions (responsibilities, required expertise and
experience, qualifications and training programs)
• Special authorisation for sampling, tests/calibrations, issuing
test reports/certificates, giving opinions, operating equipment
• When scope of accreditation includes opinions and
interpretations: verification of this, but the accreditation does
not cover the opinion itself
• Verify qualification, if relevant, and whether they know their
limits, this is what they are allowed to do and not allowed
• Only for people relevant to the scope of accreditation
07/07/2015
Beltest ISO 17025
30
5.3 Accommodation
• Everything for a correct performance including environmental
conditions
• Control of the environmental conditions
control of this dependent upon the importance in the UM
stopped when it might jeopardise the results
• Cross contamination
• Access based on particular circumstances
• Good housekeeping
only refer to safety and health procedures when relevant for the QS
• No ‘Fort Knox’, we are not S&H auditors
07/07/2015
Beltest ISO 17025
31
5.4 Test methods and validation
• Instructions, where the absence could jeopardise the results readily
available (e.g. standards are there)
•
including sampling, handling, transport, storage, preparation of samples, analysis, statistical
techniques, Id, scope, equipment, RM, env. Conditions, checks, data, uncertainty
maintained current and readily available
deviations should be documented, justified, authorised, accepted (by customer?)
Methods that meet requirements, last version
if no requirements set, you choose published methods
otherwise, validation for its intended use, agreement with customer (?)
• Design plans for laboratory developed methods
• Non standard tests and new methods shall be validated before use
07/07/2015
Beltest ISO 17025
32
5.4 Methods and validation
• Validation parameters according to intended use
go from solid proof to common knowledge: using RM,
comparison with other methods, interlaboratory comparisons,
systematic assessment, scientific understanding
choose parameters matched to the needs
• Records of the results, procedure for validation, report of fitness for
use
• Take into account risks, cost, needs and technical possibilities
linking it to the UM
• Here a dialogue and agreement between technical assessor and lab
is needed, no audit
07/07/2015
Beltest ISO 17025
33
5.4 Measurement uncertainty
• Procedure for estimating uncertainty for calibrations
note: calibration = measurements made to establish the traceability chain
• And for test labs (if not statistically, solid estimation)
uncertainty budget according to GUM-guide
note: requires a lab to attempt a reasonable estimation e.g. by using professional judgement
• Degree of rigor dependent upon method, client, …
• Where well-recognised test methods specifies limits measurement
uncertainty: to be respected
• All components which are of importance shall be taken into account
note: if contribution is < 1/5 or 1/10 of the largest contribution then this one can be ignored
note: predicted long term behaviour not: unless it influences CRM value e.g radiological
07/07/2015
Beltest ISO 17025
34
• Here a dialogue between technical assessor and lab is needed, no audit
5.4 Control of data
• Calculations and data transfer to be controlled also back up,
restore, confidentiality
• Computers, automated equipment:
user developed software: documented and validated
commercial off the shell (word processing, database,
statistics) are validated
protection of data
maintenance and good operation conditions
• Still remains vague how far we can go
07/07/2015
Beltest ISO 17025
35
5.5 Equipment
• All equipment available with unique ID
• Calibration for key quantities before use and planned
• Operated by authorised personnel and user instructions
available
• Records: inventory and logbook of checks, calibrations,
maintenance, repairs, …
• Procedures for safe handling, transport, maintenance
• Maintenance plan and repairs: out of use, effect of defect
• Marking or ID of calibrations
• Intermediate checks and adjustments
07/07/2015
Beltest ISO 17025
36
5.6 Measurement Traceability
• Calibration labs:
traceable to SI: primary standards, secondary standards
(calibrated by metrology institute), external calibration by
labs having ISO 17025
If not available: CRM, interlabs, …
• Testing labs:
If calibration is dominant factor in uncertainty apply same
as for others, if not, more relaxed
• Reference standards and Reference materials:
Calibration of RS, RM: CRM or traceable to SI, intermediate
checks, transport and storage
07/07/2015
Beltest ISO 17025
37
5.7 Sampling
• Sampling plan and procedures available on site, statistical base
• Client deviations from sampling plan: recorded, included in all
documents and communicated
• Records of all relevant data
07/07/2015
Beltest ISO 17025
38
5.8 Test items
• Procedure for transport, receipt, handling, protection, storage
(environmental conditions, security), retention, disposal
• ID so that they can not be confused
• Receipt: NC
07/07/2015
Beltest ISO 17025
39
5.9 QC
• Procedures for QC:
trends are detectable
statistical techniques
planned and reviewed monitoring
CRM or secondary RM
interlabs
note: participation to proficiency testing may be a requirement for accreditation
replicate tests
retesting
Type and volume of the work
07/07/2015
Beltest ISO 17025
40
5.10 Reports
• Reports with all info as requested by the customer
note: client is the person placing the order or authorising the contract
• Which may be a simplified way (e.g. internal, written
agreement), all relevant info available
note: in the case where a legal requirement exists no written agreement is needed
• Content and layout
statement on compliance/non-compliance with requirements
uncertainty: where applicable, when relevant to the validity
or application of the result, client instructions, uncertainty
affects compliance
07/07/2015
Beltest ISO 17025
41
5.10 Test reports, ctd.
opinions and interpretations
where appropriate and needed
clearly marked
conformity, fulfilment of contractual requirements, recommendations
of how to use results, guidance for improvements
compliance against defined, objective criteria: no opinion or
interpretation
sampling data
• Subcontractors
• Format: electronic, standardised
• Amendments, supplements: standard sentence
07/07/2015
Beltest ISO 17025
42
5.10 Calibration Certificates
• Layout
see test reports
environment, uncertainty, traceability
compliance (which clauses)
• Results before and after adjustments
• Nothing on calibration interval
07/07/2015
Beltest ISO 17025
43
Conclusion
• QS more aligned with ISO 9000
better PR
requires more documentation for labs
more explicit text reduces the desire and limits the freedom
to adapt QS to new idea’s
• Technical requirements were implicitly already there
• Validation in Belgium already at a high level, but assessor has
bigger power to ask for it
• The Beltest assessments were already at the level of ISO 17025
(for technical certainly, for QS some adjustments)
• Better text for calibration labs, same conclusion for BKO
07/07/2015
Beltest ISO 17025
44
References
• Measurement uncertainty:
http://www.vtt.fi/ket/eurachem/publications.htm
07/07/2015
Beltest ISO 17025
45