UPCOMING PROJECTS
Kangean Energy Indonesia Ltd.
Nov. 19, 2014
1
Agenda
•
•
•
•
Kangean Block
Upcoming Projects
TSB Phase-2 Development Project
South Saubi Exploration Project
2
Kangean Block
3
Upcoming Projects
TSB Phase-2 Development
South Saubi Exploration
4
TSB Phase-2 Projects
(Exploitation)
5
TSB Development
Phase-1
Phase-2
TSB Phase-2 Development
Water Depth : 90 – 250m
Note
: Green colour – pipeline system (Phase 2)
Blue colour – SCS (Phase 2)
Drill 4 wells (Sirasun, Batur)
Lay Flowline and install Subsea Structure
Lay Umbilical
Install Subsea Control System
Flowline tie-in to Existing Terang Manifold
Umbilical tie-in to Existing UTA
Major Contracts
in TSB Phase-2 Project
1. Subsea X’mas Tree & Subsea Control System
(Q2 2015 - Q1 2017)
2. Subsea EPCI
(Q1 2016 – Q1 2018)
3. Drilling Rig
(Q1 2017 - Q3 2017)
4. Drilling Materials and Services
8
SOW and Requirement
 Subsea X’mas Tree
o Supplied Equipment
 4ea x Nom. 7” -10K Subsea Xmas tree
 5ea x Subsea Wellhead (18-3/4” x 10K)
 5ea x Tubing Hanger
o Installation Service
o QA/QC Service
9
SOW and Requirement
 Subsea Control System
 Equipment Supply (SCS infield & SCS Topside)
• One (1) set SCS infield components including UTA, Cobraheads, SDU’s with
related accessories, HFL/EFL, spare parts and consumables for CONTRACTOR
furnished items, to be fit with SS Installation Contractor’s manufactured
umbilical, pile bases, structural members/ protection frames etc.
• One (1) set of SCS topside components including MCS, EPU and ROS for
installation on the existing FPU.
• One (1) set Tree Instrumentation for respective SSXT: APT, UPTT, DPTT, SAM
and SECM.
 Support Services
• project management, design eng, QA/QC, FAT, SIT, EFAT, SRT, transportation,
shipment assistance, pre- installation test, pre-submergence check etc.
Installation Services
10
SOW and Requirement
 Subsea EPCI
o
o
Flowlines (incl. Tie-in)
•
10” Infield Flexible Flowline from SIO-1 to Sirasun Manifold, approx. 7.9km
•
12” Infield Flexible Flowline from SIO-2 and SIO-3 to Sirasun Manifold,
approx. 1.8km and 1.6km
•
10” Infield Flexible Flowline from BTO-1 to Batur Tee, approx. 1.2km
•
26” OD, API X65, WT 20.6mm Production Flowline from Sirasun Manifold to
Existing Terang Manifold, approx. 23.3km
Subsea Structures (incl. Foundation)
•
Sirasun Manifold - pile foundation
•
Batur In-line Tee - mudmat
•
Pipeline End Termination (PLET) - pile foundation
•
Sirasun Subsea Distrubution Unit (SDU) - pile foundation
•
Batur Subsea Distribution Unit (SDU) – mudmat
11
SOW and Requirement
 Subsea EPCI
o
Installation - Water Depths (app. 90m – 250m)
<Main vessels>
• Derrick Lay Barge (DLB), S-Lay
– To install all flowlines, SCS, Umbilical and subsea structures
• Diving Support Vessel (DSV)
– To perform pre-lay survey, span correction and tie-in (flowlines to
subsea structures)
– To install pile foundations for subsea structures
– To perform Pre-commissioning
12
SOW and Requirement
 Rig Services
– Floater Drilling Unit (Semi-Sub or Drill ship)
– 4 wells (Subsea Completion wells)
– Water Depth: 350ft – 750ft
– Drilling Depth: 4700ft – 6500ft
• 3horizontal wells and 1 deviated well
– Requirement
• SSXT Handling Capacity
– Able to handle SSXT(5m x 5m, 65ton) from supply boat to moon pool
(5.5m x 5.5m)
13
Required Materials and Services
(Drilling)
Item
Remarks
Casing
30”, 20”, 13-3/8” & 9-5/8”
Cementing Accessories
Float Shoe, Float Collar, Centralizer
Liner Hanger
9-5/8” x 13-3/8”
SSXT & SS-Wellhead
7” nom. Bore - 5K SSXT
18-3/4” – 10K SS-wellhead
Gravel Pack
Shunt tube system
Tubing & Accessories
7” or 5-1/2” Tubing, 7” TRSCSSV
Bit
26”, 17-1/2”, 12-1/4”, 8-1/2”
36” HOP
Rental Equipment
Drillling Jar, Fishing Tool, Stabilizer(36”, 26”),
Riser brush, Casing scraper
14
Required Services
(Drilling & Completion)
Item
Remarks
Mud & Completion Fluid
High Performance WBM, NaCl(/NaBr) Brine
Filtering system, Centrifuge rental, LMP at Supply Base
Cementing Service
30”, 20”, 13-3/8” 9-5/8” Liner, other pumping,
Bulk Plant at Supply Base
Mud Logging
System w/Data Engineer, Mud logger, Sample Catcher
ROV
Working Class
SSXT & Wellhead Installation
Running Tool Rental & Installation Service
Directional Drilling
PDM, RST, MWD, LWD
Casing Installation
30”, 20”, 13-3/8”, 9-5/8” Liner, 7”(5-1/2” Tubing)
Torque turn monitoring for tubing
Liner Hanger Setting
9-5/8” x 13-3/8” Liner Hanger
Open Hole Gravel Pack
8-1/2” horizontal section
Well Cleaning Flow
7-3/8” Subsea Landing String, Surface equipment
Coiled Tubing
N2 lifting, Open/Close FIV, Retrieve BPV
Wireline Tractor
Open/Close FIV, Retrieve BPV
Slickline
Pressure/Temperature data acquisition
15
Required Services
(Drilling Support)
Item
Remarks
Site Survey
in 2016 as required
Rig Positioning
For 4 wells (4times)
Anchor Handling Tug Supply Vessel 2 AHTS vessels + 1 supply vessel
Helicopter
Denpasar to/from Rig
Weather forecast
For TSB field
VSAT
For Floater Drilling Unit
16
South Saubi Projects
(Exploration)
17
Major Contracts
in South Saubi Project
1. 3D Seismic Survey
(Q2 2015)
2. Drilling Rig
(Q1 2016)
3. Drilling Materials and Services
(Q4 2015 – Q1 2016)
18
SOW and Requirements
(3D Seismic Survey)
• 3D Marine Seismic Acquisition
– Deep marine (WD~3,000ft)
– Full fold area: 215 sq. km
– Maximum offset: 6 km
• 3D Seismic Data Processing
– Onboard processing through PoSTM
– Main processing through PrSTM
• Onboard QC’s
– Acquisition / Navigation / Processing
– 30 ~ 40 days
19
SOW and Requirements
(Drilling Rig)
• Rig
– Floater Drilling Unit (Semi-Sub or Drill ship)
– 1 well (DST if any positive indication, P&A)
– Water Depth: 3060ft
– Drilling Depth: 13950ft (DST case)
• Vertical well
– Requirement
• Managed Pressure Drilling System to drill safely
reservoir (carbonate)
– To mitigate risk in relation with mud loss and kick
20
Drilling Materials and Services
Item
Remarks
Casing
36”, 20”, 16”, 13-5/8”, 9-5/8” and 7”
Cementing Accessories
Float Shoe, Float Collar, Centralizer
Liner Hanger
16” x 20”, 11-3/4” x13-5/8” and 9-5/8” x 13-5/8”
SS-Wellhead
18-3/4” – 10K SS-wellhead
Bit
42”, 26”, 17”, 14-1/2”, 12-1/4”, 10-5/8” and 8-1/2”
Rental Equipment
Drilling Jar, Fishing Tool, Stabilizer, Casing scraper
Site Survey
in 2015
Rig Positioning
For 1 well
Anchor Handling Tug Supply Vessel
2 AHTS vessels
Helicopter
Denpasar to/from Rig
Weather forecast
For South Saubi field
VSAT
For Floater Drilling Unit
21
Required Services
(Drilling & Completion)
Item
Remarks
Wellhead Installation
Running Tool Rental & Installation Service
Mud & Completion Fluid
High Performance WBM or SBM
Cementing Service
20”, 16”, 13-5/8”, 9-5/8”, 7” Liner or Casing, other
pumping, Bulk Plant at Supply Base
Mud Logging
System w/Data Engineer, Mud logger, Sample Catcher
Casing Installation
20”, 16”, 13-5/8”, 9-5/8”, 7”
Liner Hanger Setting
11-3/4” x 13-5/8” and 9-5/8” x 13-5/8” Liner Hanger
ROV
Working Class
Logging while Drilling
PDM, MWD, LWD
Hole Enlargement Tool
16” x 20”, 14-1/2” x 17-1/2”, 12-1/4” x 14-1/2”, 10-5/8” x
12-1/4”
Managed Pressure Drilling System
For carbonate reservoir drilling
H2S Service
H2S Detector, Breathing apparatus, Blower
Wireline Logging
Formation evaluation for reservoir, Cement bond log, Set
bridge plug, contingency back-off
DST
For carbonate reservoir testing
22
Thank you
23