Corporate
Profile
28th June 2011
‘About us’
GOAL
28th June 2011
• To provide High Quality, Energy Efficient
products with a cost effective ventilation
solution”
About us
Since 2007, Airovient is
a 360° ductless car park
ventilation solutions
provider delivering its
customers with tailor
made innovative
cutting edge
ventilation solutions
that are cost & energy
efficient.
28th June 2011
Our all projects are ecofriendly & energy efficient.
Use of high quality gas
detectors, frequency
drives & PLC helps keeping
a constant balance and
effective energy use by
maintaining sufficient and
necessary air exchange
We abide by the local
legislation and also bring
in international standards
that results in effective
use of ventilation systems
during operations. We also
extend our services by
further enhancing by
implementing DCV
systems to completely
automize and maximize
energy savings
Philosophy
Airovient team to always stay
focused on reducing the initial
cost of the product / systems
with an aim to operate at a bare
minimum operational cost
28th June 2011
Vision
Establishing ‘Airovient’ as the
Leadership brand in the
ventilation industry and be
recognized as a complete solution
provider by delivering the
highest quality of products &
services to its esteemed
customers
28th June 2011
Mission
Deliver high quality energy
efficient products and services at
a reasonable price to Real Estate
Developers & HVAC organizations.
Translating our services as value
for our customers
28th June 2011
Our Commitments
Our CPV Systems compared at par with fire
fighting systems
To protect the developer’s investment
To deliver efficient Products / Systems
To adhere to Green Building Standards to
reduce carbon foot prints
To continuously develop DCV solutions
To assign a reliable system to our customers for
their Ventilation needs
Structured After sales service
28th June 2011
The Founder
Dilip Kumar Nemani
CMD
Founder of Airovient offering 30 years of experience in fan industry. Excel in
steering operations emphasizing on attaining overall organizational goals &
objectives with an aim to service their customer with innovative cost
effective solutions.
28th June 2011
Quality Policy
At Airovient, we ensure
International Standard quality
processes are followed across our
business process to deliver quality
products and services which
ensures high efficiency and
committed results for our customer
requirements.
28th June 2011
‘Key services’
28th June 2011
Ventilation Systems Design
•
•
•
Airovient designs the most efficient and cost effective car
parking ventilation systems.
Airovient aims in delivering an optimum usage of air
exchange rate on one hand while reducing the cost of
implementation & operations on the other.
It is an absolute measured deliverable by Airovient
Designed to Perform
28th June 2011
Ventilation Systems Engineering
•
•
•
•
•
Assessing the load requirement
Selecting right mix of air moving devices that has low
noise and energy efficient
Defining logic of operation at varying pollution levels
Analyzing and validating the design engineering through
CFD (Computational Fluid Dynamics)
Controls system is designed for automatic operation.
These are with digital variable speed setup to reduce the
operational cost.
Engineered To Optimize
28th June 2011
Project Implementation
We seamlessly combine world-class technology with our
engineering.
 Our Project Implementation follows standards which are
best of practices
 From Project Initiation to Go-live scenario we follow
work- breakdown-structure model to ensure every
delivery milestones are implemented to our customers
100% satisfaction and meet our corporate philosophy

Implemented to Perfection
28th June 2011
Compliance Certification


Post implementation of projects, we conduct cold smoke test
to demonstrate post fire smoke clearance, sight length and
total time taken to completely clear the smoke.
This test is the only practical tool to validate the system
effectiveness.
Secured to Safety
28th June 2011
‘Landmark projects’
28th June 2011
Statistics says
Case 1
• Installed load for a Project has reduced by 917 KW.
Case 2
• By using the ducted systems 2240 KW load have been reduced thru value
engineering
Case 3
• 20% cost was reduced in spite of the system being automatic.
Case 4
• With a pilot project success, the Client have now given clear instructions to all
concerned that only our CPV system shall be used by them on all their project.
28th June 2011
Rajarhat, Kolkata
KOLKATA PROJECT OF BENGAL AMBUJA
City Centre
New Town
28th June 2011
– Backdrop –
This project, when planned, was
supposed to get power supply from State Electricity
Board after considerable delay as a reasons entire
building was operable through its own power
generation.
– Client wish - Client preferred the system which could
be run consuming bare minimum load.
– Airovient solutions - We designed and executed this
project in 2007 where we operated all the jet
Induction units & smoke spill fans through VFD’s to
regulate the speed depending upon the CO Level.
– Result - The system on an average consumed only 11
KW load of the total installed load of 170 KW. Smoke
clearance test was conducted and the design was
validated.
Bhopal
PROJECT OF DAINIK BHASKAR GROUP
D B Mall
28th June 2011
– Airovient Solution - System installed is
based on 12 & 30 ACH during normal
pollution & Fire Mode but the operational
logic was designed to achieve between 2
ACH and 6 ACH maximum step-lessly
depending upon the CO level.
– Result - The system draws only 22 KW on
an average against installed load of 352
KW.
Hyderabad
TSI WAVEROCK – Hi-tech City
A PROJECT OF TISHMAN SPEYER &
ICICI VENTURE
SEZ GREEN
BUILDING
28th June 2011
– Backdrop – Wave-Rock has a world class office
campus serving over 20,000 professionals,
providing 2.45 million sq.ft. of Class A office
space in a Special Economic Zone. The project is
LEED certified green building
– Client wish - Reduce carbon foot-prints
– Airovient Solution - Two level basement having
parking area of 46821 sq m where we
engineered and provided ventilation using only
363 KW load as against tender load of 874 KW
– Result – A net saving of 511 KW giving client
huge saving in both capital cost and operating
cost
Parel – Mumbai
India Bulls – Finance Centre
• Airovient Solution - We helped the client convert
the system from using 2 speed exhaust fans to
single speed fans with correct estimation on load
and from manual to fully automatic system with
DCV feature
• Result - 20% cost was reduced in spite of the
system being automatic following DCV philosophy
• Current Status - Tower 2 & 3 is also under
execution
Tower 1
28th June 2011
BKC – Mumbai
A PROJECT OF TATA GROUP
• Airovient Solution - Fully automated system
with demand control philosophy using
combination of Jet Induction & Impulse fans
Tata
and smoke spill fans.
Communications • Results - Consumes only 14% of the installed
load in 6 & 12 ACH system.
28th June 2011
Project Realizations
Reduction in Initial & Operating cost
• Since 2007, we have been successfully driving our all projects in saving overall cost of
systems
Reduction of Load
• Resolve to reduce the load by re-assessing the system design
Deliver Automatic Systems
• Conversion of the system from semi-automatic to fully automatic DCV system with
operational logic limited to 6 ACH in peak pollution mode without affecting any change
on the installed capacity to achieve higher rate of ACH as per local authority’s
requirement.
Enriched Knowledgebase
• In the process we had the privilege of meeting leading brains in the field and getting rich
with their vital design and engineering inputs.
28th June 2011
Our Trusts
28th June 2011
•
•
•
•
•
•
•
•
•
•
Bengal Ambuja Housing Development Ltd, Kolkata
Dainik Bhaskar Group, Bhopal
Eta Star Properties Ltd, Chennai
Indiabulls Real Estate Company Pvt. Ltd., Mumbai
Tata Housing Development Co. Ltd., Mumbai
Nagarjuna Construction Company Ltd., Hyderabad
Brigade Group, Bangalore
Magarpatta Retail Pvt Ltd, Pune
Market City Group (Phoenix Mills), Mumbai
Lodha Group, Mumbai
‘Connect us’
28th June 2011
Geo-spread
KOLKATA
• 86, Tollygunge Circular Road, Kolkata - 700 053
Ph: +91 33 32923946 Fax : +91 33 24988126
M : + 91 9831106114 Email :
[email protected]
MUMBAI
• 209, BhavaniIndl. Estate, Jain Mandir Road, Opp. IIT
Main Gate, Powai
Mumbai – 400076 M : + 91 9833634691 Email :
[email protected]
DELHI
• L-47, Gali No. 7, Mahipalpur Extn. Hall No.203, 2nd
Floor, Delhi - 110037
Telefax : + 91 11 30622651 M : +91 8800434400
Email : [email protected]