NAME OF CONSTRUCTION Author of the slides: XXX

Download Report

Transcript NAME OF CONSTRUCTION Author of the slides: XXX

“RAABSTEG” FELDBACH (AUT)
Institute for Timber Engineering and Wood
Technology, TU Graz / Austria
Case study no. 3
Leonardo da Vinci project
no. CZ/06/B/F/PP-168007
WP6 – Case Studies
PC 3 – A set of case studies
General Information

Type of building:
(Covered) Pedestrian and bicycle bridge

Structural System:
Cable supported single-span girder with
suspended bridge deck

Owner:
City of Feldbach / Austria

Location:
Feldbach / Austria

Erection date:
08 / 1998

Architectural, structural and construction design:
LIGNUM CONSULT, Graz / Austria

Manufacturer of the timber structure:
Stingl GesmbH, Trofaiach / Austria
Longitudinal Section and
Structural System
Longitudinal
Section
(with dimensions)
Structural
System
(with
dimensions)
Cross section
Detail: Deck Construction
Load carrying:
- in longitudinal direction as T-beam
- in longitudinal direction for horizontal
forces
- in cross direction for load distribution
purposes
Main girder 2 x 200 / 450 mm
out of GL36c- (BS 18 c)- twin girder
machine graded
C35m- (MS 13)lamellas
machine graded
C40m- (MS 17)lamellas
CLT - plate
130 mm
(19_l_NF+34_q+24_l+34_q+19_l_NF)
Detail
Detail
Detail: Connection Suspension Bar
on Main Girder
Detail: Support Detail – Connection
on Tie Bar
Detail: Railing System
Assembling / Transport
Assembling in the production hall
of the manufacturer
Transport by means of a truck
with a trailer
Erection
Erection concept
Erection by means of three auto-cranes
Impressions
View from the cycle track
View in londitudinal direction
Impressions
View from Raab River
Thank you for your attention!
http://fast10.vsb.cz/temtis/en/