Transcript Hilton Maher Selto Chapter 16
McGraw-Hill/Irwin
16
Standard Costing, Variance Analysis and Kaizen Costing
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved.
16-2
Learning Objective 1
16-3
Using Standard-Costing Systems for Control
based on carefully predetermined amounts.
Standard costs are
used for planning labor and material requirements.
the expected level of performance.
benchmarks for measuring performance.
16-4
Using Standard-Costing Systems for Control STANDARD COST a budget for the production of one unit of product or service ACTUAL COST incurred and recorded in the production of the product or service COST VARIANCE the difference between the actual cost and the standard cost
16-5
Using Standard-Costing Systems for Control This variance is unfavorable because the actual cost exceeds the standard cost.
Standard
A standard cost variance is the amount by which an actual cost differs from the standard cost.
16-6
Management by Exception Managers focus on quantities and costs that deviate significantly from standards (a practice known as management by exception) .
Standard
Direct materials Direct labor Type of Product Cost
16-7
Management by Exception
Take the time to investigate only significant cost variances.
What is significant?
Depends on the size of the organization Depends on the type of the organization Depends on the production process
16-8
Variance Analysis Cycle Identify questions Receive explanations Take corrective actions Analyze variances Begin Prepare standard cost performance report Conduct next period’s operations
16-9
Setting Standards Analysis of historical data What DID the product cost?
Task analysis Combined approach Used in a mature production process What SHOULD the product cost?
Analyze the process of manufacturing the product Analyze the process for the step that has changed, but use historical data for the steps that have not changed
16-10
Participation in Setting Standards Accountants, engineers, personnel administrators, and production managers combine efforts to set standards based on experience and expectations.
16-11
Learning Objective 2
16-12
Perfection versus Practical Standards: A Behavioral Issue PERFECTION STANDARDS Can only be attained under near perfect conditions
•
Peak efficiency
•
Lowest possible input prices
•
Best-quality material
•
No disruption in production PRACTICAL OR ATTAINABLE STANDARDS Tight as practical, but still expected to be attained
•
Occasional machine breakdowns
•
Normal amounts of raw material waste
16-13
Perfection versus Practical Standards: A Behavioral Issue Should we use practical standards or perfection standards?
Practical standards should be set at levels that are currently attainable with reasonable and efficient effort.
16-14
Perfection versus Practical Standards: A Behavioral Issue I agree.
Perfection standards are unattainable and therefore discouraging to most employees.
16-15
Setting Standards – Direct Materials Price Standards Quantity Standards Use competitive bids for the quality and quantity desired.
Use product design specifications.
16-16
Setting Standards – Direct Materials The standard materials cost for one unit of product is: Standard price for Standard quantity of material unit of product
16-17
Setting Standards – Direct Labor Rate standards Efficiency standards Use wage surveys and labor contracts.
Use time and motion studies for each labor operation.
16-18
Setting Standards – Direct Labor The standard labor cost for one unit of product is: Standard number for one hour for one unit of product
16-19
Standard Cost in Service Industries
Jobs with repetitive tasks lend themselves to efficiency measures.
Computing non manufacturing efficiency variances requires some assumed relationship between input and output activity.
Examples Examples
16-20
Standard Cost in Service Industries Department Mailing Personnel Food service Input Labor hours Labor hours Labor hours Consulting Nursing Billable hours Labor hours Check processing Computer hours Output Number of pieces mailed Number of personnel changes processed Number of meals served Customer revenues Number of patients and/or procedures Number of checks processed
16-21
Costs and Benefits of Standard-Costing Systems Costs Benefits IMPROVED DECISION MAKING, BUT: Implementing and maintaining cost standards can be time-consuming, labor-intensive, and expensive.
16-22
Cost Variance Analysis Standard cost variances
Price variance
The difference between the actual price and the standard price
Quantity variance
The difference between the actual quantity and the standard quantity
16-23
A General Model for Variance Analysis Actual quantity Actual quantity × × Standard quantity × Actual price Standard price Standard price Price / Rate variance Quantity / Efficiency variance
16-24
A General Model for Variance Analysis Actual quantity Actual quantity × Actual price × Standard quantity × Standard price Standard price Price / Rate variance Quantity / Efficiency variance Standard price is the amount that should have been paid for the resources acquired.
16-25
A General Model for Variance Analysis Actual quantity Actual quantity × × Standard quantity × Actual price Standard price Standard price Price / Rate variance Quantity / Efficiency variance Standard quantity is the quantity allowed for the actual good output.
16-26
A General Model for Variance Analysis A ctual A ctual q uantity × p rice A ctual q uantity × S tandard p rice S tandard × q uantity S tandard p rice Price / Rate variance Quantity / Efficiency variance
Materials price variance Materials quantity variance
AQ(AP - SP) SP(AQ - SQ)
Labor rate variance Labor efficiency variance
AQ = Actual Quantity SP AP = Actual Price SQ = Standard Price = Standard Quantity
16-27
Standard Costs Let’s use the concepts of the general model to calculate standard cost variances, starting with direct materials.
16-28
Learning Objective 3
16-29
Materials Variances Koala Camp Gear Company in Melbourne Australia has the following direct material standard to manufacture one Tree Line tent: 12 square meters per tent at $8.00 per square meter (sq m) Last month Koala purchased 40,000 square meters at $8.15 per square meter and used 36,400 square meters to make 3,000 tents.
16-30
Materials Variances Actual quantity Actual quantity purchased purchased × × Actual price Standard price
We should compute 40,000 sq m 40,000 sq m × × the price variance using the actual $8.15 per sq m $8.00 per sq m quantity purchased.
$326,000 $320,000 Price variance $6,000 Unfavorable
16-31
Materials Variances
SQ = 3,000 tents × 12 sq m per tent SQ = 36,000 sq m We should compute the quantity variance using the actual quantity used.
Actual quantity used × Standard quantity × Standard price Standard price
36,400 sq m 36,000 sq m × × $8.00 per sq m $8.00 per sq m $291,200 $288,000 Quantity variance $3,200 Unfavorable
16-32
Materials Variances We may also calculate materials variances using formulas: MPV = AQp(AP – SP) MPV = 40,000 sq m × ($8.15 – $8.00) MPV = $6,000 Unfavorable MQV = SP(AQu – SQ) MQV = $8.00(36,400 sq m – 36,000 sq m) MQV = $3,200 Unfavorable
16-33
Reporting Materials Variances
I need the variances as soon as possible so that I can better identify problems and control costs.
You accountants just don’t understand the problems we production managers have.
Okay. I’ll compute the price variance when materials are purchased, and the usage variance as soon as material is used.
16-34
Responsibility for Materials Variances
I am not responsible for this unfavorable materials usage variance.
You bought poor quality materials, so my people had to use more of it.
Your poorly trained workers and poorly maintained equipment caused the problems.
Also, your poor scheduling requires rush orders of materials at higher prices, causing unfavorable price variances.
16-35
Standard Costs Now let’s calculate standard cost variances for direct labor .
16-36
Labor Variances Koala has the following direct labor standard to manufacture one Tree Line tent: 2 standard hours per tent at $18.00 per direct labor hour Last month 5,900 direct labor hours were worked at $19.00 per hour to make 3,000 tents.
16-37
Labor Variances
SH = 3,000 tents × 2 hours per tent SH = 6,000 hours
Actual hours Actual hours × × Standard hours × Actual rate Standard rate Standard rate
5,900 hours 5,900 hours 6,000 hours × × × $19.00 per hour $18.00 per hour $18.00 per hour $112,100 $106,200 $108,000 Rate variance $5,900 Unfavorable Efficiency variance $1,800 Favorable
16-38
Labor Variances We may also calculate labor variances using formulas: LRV = AH(AR - SR) LRV = 5,900 hrs($19.00 - $18.00) LRV = $5,900 Unfavorable LEV = SR(AH - SH) LEV = $18.00(5,900 hrs - 6,000 hrs) LEV = $1,800 Favorable
16-39
Labor Rate Variance – A Closer Look
Using highly paid skilled workers to perform unskilled tasks results in an unfavorable price variance.
High skill, high rate Low skill, low rate Production managers who make work assignments are generally responsible for price variances.
16-40
Labor Efficiency Variance – A Closer Look
Poorly trained workers Poor quality materials
Unfavorable Efficiency Variance
Poor supervision of workers Poorly maintained equipment
16-41
Responsibility for Labor Variances
I am not responsible for the unfavorable labor efficiency variance!
You bought poor quality materials, so my people took more time to process them. You used too much time because of poorly trained workers and poor supervision.
16-42
Responsibility for Labor Variances
Maybe I can attribute the labor and materials variances to personnel for hiring the wrong people and training them poorly.
16-43
Allowance for Defects or Spoilage In some manufacturing processes, a certain amount of defective production or spoilage is normal.
Example: 1,000 liters of chemicals are normally required in a chemical process in order to obtain 800 liters of good output. If total good output in February is 5,000 liters, what is the standard allowed quantity of input?
Good output quantity = 80% X Input quantity Good output quantity ÷ 80% = Input quantity allowed 5,000 liters of good output ÷ 80% = 6,250 liters of input allowed
16-44
Learning Objective 4
16-45
Significance of Cost Variances: When to Follow Up How does a manager know when to follow up on a cost variance and when to ignore it?
Absolute amount Size of variance ?
Relative amount
16-46
Significance of Cost Variances What clues help me to determine the variances that I should investigate?
Size of variance Dollar amount Percentage of standard Recurring variances Trends Controllability Favorable variances Costs and benefits of investigation
16-47
Significance of Cost Variances: When to Follow Up How do I know which variances to investigate?
Larger variances, in dollar amount or as a percentage of the standard, are investigated first.
We could use a rule of thumb such as: investigate all variances that are over $10,000 or over 10 percent of the standard cost.
16-48
Significance of Cost Variances: When to Follow Up What about recurring variances?
Month
September October November December
Variance
$6,000 F 6,400 F 3,200 F 6,200 F
Percentage of standard cost
6.0% 6.4% 3.2% 6.2%
None of the variances are greater than $10,000 or 10% for any one month, but they should be investigated because of they have continued for several months.
16-49
Significance of Cost Variances: When to Follow Up What about trends?
Month
September October November December
Variance
$ 250 U 840 U 4,000 U 9,300 U
Percentage of standard cost
0.25% 0.84% 4.0% 9.3%
None of the variances are greater than $10,000 or 10% for any one month, but they should be investigated because of the unfavorable trend.
16-50
Significance of Cost Variances: When to Follow Up Controllability A manager is more likely to investigate a variance that is controllable by someone in the organization than one that is not.
Favorable variances It is as important to investigate significant favorable variances as well as significant unfavorable variances.
Cost and benefits of investigation The decision whether to investigate a variance is a cost benefit decision
16-51
Statistical Analysis Control charts Display variations in a process and help to analyze the variations over time.
Distinguish between random variations and variations that should be investigated.
Provide a warning signal when variations are beyond a specified level.
16-52
Statistical Analysis Favorable limit Unfavorable limit 1
• • •
Warning signals for investigation • •
• • •
2 3 4 5 6 Variance measurements 7 8 9 •
16-53
Learning Objective 5
16-54
Behavioral Effects of Standard Costing Standard costs, budgets and variances are used to evaluate the performance of individuals and departments They can profoundly influence behavior when they are used to determine salary increases, bonuses and promotions
16-55
Which Managers Influence Cost Variances?
Direct-materials price variance Purchasing manager Get the best prices available for purchased goods and services through skillful purchasing practices Direct-materials quantity variance Production supervisor Skillful supervision and motivation of production employees, coupled with the careful use and handling of materials, contribute to minimal waste Direct-labor rate variance Production supervisor Generally results from using a different mix of employees than that anticipated when the standard were set Direct-labor efficiency variance Production supervisor Motivating employees toward production goals and effective work schedules improves efficiency
16-56
Interaction among Variances Interaction among variances often occurs, making it difficult to determine the responsibility for a particular variance.
Variances in one part of the value chain can be due to root causes in another part of the chain.
Value chain Physical resources perspective Human resources Research and develop ment Design Supply Produc tion Marketing Distri bution Customer service
Exh.
16-5
16-57
Learning Objective 6
16-58
Using Standard Costs for Product Costing Work-in-process inventory Direct-materials cost Direct-labor cost Manufacturing overhead Finished-goods inventory Product cost transferred when product is finished Product cost transferred when product is sold Cost of goods sold Income summary Expense closed into Income summary at end of accounting period
Exh.
16-6
16-59
Standard Cost Journal Entries
Inventories are recorded at standard cost.
Variances are recorded as follows:
Favorable variances are credits, representing savings in production costs.
Unfavorable variances are debits, representing excess production costs.
Standard cost variances are usually closed to cost of goods sold.
Favorable variances decrease cost of goods sold.
Unfavorable variances increase cost of goods sold.
16-60
Impact of Information Technology on Standard Costing CAD designers can access the data base for instant design cost estimates.
Labor time and rate are recorded at standard, using bar codes and employee IDs.
Standard cost data base Materials purchases and uses are recorded at standard, using bar codes.
16-61
Learning Objective 7
16-62
Standard Costing: Its Traditional Advantages Sensible cost comparisons Management by exception Performance evaluation Advantages More stable product costs Employee motivation Less expensive than actual- or normal costing systems
16-63
Learning Objective 8
16-64
Criticisms of Standard Costing in Today’s Manufacturing Environment
Variances are often too aggregated. They are not tied to specific product lines, production batches, or to the flexible management system.
Standard costing may not be applicable in flexible manufacturing operations with short life-cycle products.
There is too much focus on cost minimization rather than increasing product quality or customer service.
There is too much focus on the cost and efficiency of direct labor. Automation reduces labor costs and the significance of labor variances. Automated manufacturing processes tend to be more consistent in meeting production specifications.
Variance reports are often provided too late to be useful to managers.
16-65
Adaptation of Standard-Costing Systems Applications of standard costing have adapted to changes in the manufacturing environment and the resulting criticisms leveled at standard costing.
Reduced importance of labor standards.
Automation means more overhead, less labor.
Less use of labor as a cost driver.
More emphasis on material and overhead costs.
16-66
Adaptation of Standard-Costing Systems Applications of standard costing have adapted to changes in the manufacturing environment and the resulting criticisms leveled at standard costing.
Automation Reduces labor efficiency variance Reduces variation in quality and increases quality Reduces material quantity variance
16-67
Adaptation of Standard-Costing Systems Applications of standard costing have adapted to changes in the manufacturing environment and the resulting criticisms leveled at standard costing.
Shorter product life cycles More frequent benchmarking Elimination of non-value added costs Non-financial measures such a delivery times are more important More frequent revisions of standard costs Real-time information systems provide more timely variance reports
16-68
Learning Objective 9
16-69
Comparing Standard Costing and Kaizen Costing
Standard costing – the use of carefully predetermined product costs for budgeting and performance evaluation.
Standard costs are typically used in established production processes.
Kaizen costing – the emphasis is on continuous reduction of production costs.
Rather than standards or targets, the goal is current costs that are less than previous costs.
16-70
Kaizen Costing Current year cost base Kaizen goal: cost reduction rate Kaizen goal: cost reduction amount Actual cost reduction achieved 12/31/x0 Actual cost performance of the current year 12/31/x1 Cost base for next year Time
Exh.
16-7
16-71
Learning Objective 10
16-72
Production Mix and Yield Variances
Nearly all production processes require multiple materials and labor inputs.
A summary quantity variance for materials and labor would hide the individual effects of these inputs.
The quantity variances can be analyzed into two further variances:
Mix (the difference between actual and standard input proportions) Yield (the difference between actual and standard input used) The analysis assumes, of course, that the inputs can be substituted for each other.
16-73
End of Chapter 16