Transcript IMC Meeting
PRESENTATION Infrastructure and Privatization Inter-Ministerial Committee Progress Report # 3 Beirut, Lebanon August 24, 2007 0 Today’s objective is to update your Excellencies on progress to-date against Commitment Documents of the respective stakeholders Meeting Objectives Brief on the status of issues raised in the previous IMC and on progress to-date of GR PCO planning and monitoring activities – Following the last IMC, 12 main issues (including 5 that were carried over from the first IMC) were raised regarding the Power, Telecom and Transport Sectors, and the CDR – To-date, 5 issues were resolved, 2 are in progress, and 5 are delayed Highlight progress and status of implementation of short-term programs in each sector (where available): – Monthly Progress Report against programs charted in commitment documents – New and Emerging Issues 1 Table of Contents GR PCO Planning & Monitoring Monthly Progress Reports – Telecom Sector – Power Sector – Transport Sector – CDR Next Steps 2 The Paris III implementation planning process is generally on track, except for the Power Sector which is delayed, and the Transport Sector, which is still at the initiative identification phase Natural Owner Ministry of Telecom Identification Prioritization of Initiatives of Initiatives ✓ ✓ Program Progress Commitment Charters KPI Setting Report Document Development ✓ ✓ ✓ ✓ HCP ✓ ✓ ✓ ✓ ✓ ✓ TRA ✓ ✓ ✓ ✓ ✓ ✓ Ministry of Energy and Water / EDL Ministry of Transport CDR ✓ 50% ✓ ✓ ✓ 50% Not Applicable ✓ ✓ ✓ (Targets missing) ✓ Not Not Applicable Applicable ✓ ✓ ✓ Immediate Next Steps Obtain Prime Minister and Minister approval on commitment document (no financial requirements) Obtain Prime Minister and HCP SG approval on telecom and power commitment documents (no financial requirements) Obtain Prime Minister and TRA Chairman approval on commitment document (no financial requirements) Finalize KPIs Obtain Prime Minister and Minister approval on commitment document (no financial requirements Not Applicable Discuss Airport privatization roadmap and ports strategy development plan with Minister of Transport and HCP SG ✓ Obtain Prime Minister, Minister of Finance, and CDR President approval on commitment document 3 Table of Contents GR PCO Planning & Monitoring Monthly Progress Reports – Telecom Sector – Power Sector – Transport Sector – CDR Next Steps 4 Monthly progress reports will highlight the status of each program – defined in a commitment document – along implementation, budget, and KPI dimensions Program Status and Budget Performance Definitions Status Implementation KPI Completed on Completed on Completed on Time Budget Target On Track Could be Delayed Delayed NS Budget Not Started On Budget Budget Performance Initial Budget Budget endorsed during an IMC Revised Budget Budget adjusted using a Program Change Request Form endorsed during an IMC Actual Spent Amount spent until date of reporting Remaining Budget Requirements Estimate Estimate of the remaining budgetary requirements for the program On Target Potential Over Emerging Budget Issues Over Budget N/A Off Target N/A 5 Table of Contents GR PCO Planning & Monitoring Monthly Progress Reports – Telecom Sector – Power Sector – Transport Sector – CDR Next Steps 6 Program Dashboard Program Title: TEL-001: Establish the Telecom Regulatory Authority Natural Owner: Minister of Telecom Period: July 2007 IMC: Program Overall Status: Infrastructure and Privatization Achievements Since Last Report Key Issues Hiring mechanism submitted to CoM for approval Financial Procedures approved by the Ministry of Telecom New: TRA budget approved but not transferred yet Review and approval of Ministry of Finance for financial procedures still pending Carried Over from Previous IMC: Need to speed-up the process in transferring documentation and information from MoT to TRA KPI Transfer of Regulatory Functions from MoT to TRA Broadband licensing Note: (*) Defined in the legend Baseline (July 2007) 15% 0% Current Value 15% 25% Target Status (Closest Date) 100% (Oct. 2007) Process launched (Dec. 2007) Budget Performance* Initial Budget $13,500,000 Revised Budget N/A Actual Spent $600,000 Remaining Budget Requirements Estimate N/A Status N/A 7 Detailed Workplan Progress -- Jul. 1, 2007 - Sep. 30, 2007 Program/ Initiative/ Workstep End Date 23/07/02 30/11/07 281.8 wks 03/01/05 24/08/07 139.6 wks 1.b.iv Approve and transfer TRA budget 02/07/07 13/07/07 2 wks CoM, MoF Budget approved and transferred 1.b.vi Issue decrees for specific secondary legislation 02/07/07 24/08/07 8 wks CoM Decrees issued 05/03/07 01/10/07 31.6 wks 19/06/07 24/09/07 14.6 wks 19/06/07 24/09/07 14.6 wks 1.c.v Migrate and appoint TRA staff 19/06/07 24/09/07 14.6 wks 1.c.vi Finalize transfer of existing functions 1.c.vii Transfer international representation for Radio Frequency and Standards to TRA 25/09/07 01/10/07 1.2 wks 02/07/07 01/10/07 13.4 wks TRA Board / MoT TRA Board / MoT TRA Board / MoT TRA Board / MoT TRA Board / MoT 05/06/07 30/11/07 26.8 wks TRA 05/06/07 31/10/07 22.4 wks TRA 1. Establish the Telecom Regulatory Authority 1.b Issue decrees to facilitate operations of the TRA 1.c Transfer regulatory responsibility to the TRA 1.c.iii Transfer all necessary documentation from MoT to TRA (e.g., Radio Frequency, Licensing, Authorizations) 1.c.iv Transfer relevant equipment from MoT to TRA (mainly RF management equipment) 1.d Draft telecom policy outlining the liberalization path to be followed 1.d.i Draft telecom policy Completed On Track Could be Delayed Duration Workstep Responsible Start Date Delayed Deliverable/ Milestone Documentation imported Tools & equipment transferred Staff migrated Regulatory functions transferred International representation transferred Policy drafted Status NS NS NS NS NS Not started 8 Program Dashboard Program Title: Tel-002: Corporatize and Privatize Liban Telecom Natural Owner: Minister of Telecom Period: July 2007 IMC: Program Overall Status: Infrastructure and Privatization Achievements Since Last Report Key Issues None New: None Carried Over from Previous IMC: Need to appoint Liban Telecom Board of Directors or alternative governance structure KPI Liban Telecom Board appointment Percentage of employee migration from Ogero to LT Percentage of asset migration from Ogero to LT Percentage of customer migration from Ogero to LT Percentage of vendor migration from Ogero to LT Note: (*) Defined in the legend Baseline (July 2007) Current Value Delayed Delayed 0% 0% 0% 0% 0% 0% 0% 0% Target Status (Closest Date) Completed (Dec. 2007) Completed (Jul. 2008) Completed (Dec. 2008) Completed (Dec. 2008) Completed (Dec. 2008) Budget Performance* Initial Budget N/A Revised Budget N/A Actual Spent N/A Remaining Budget Requirements Estimate N/A Status N/A 9 Detailed Workplan Progress -- Jul. 1, 2007 - Sep. 30, 2007 Program/ Initiative/ Workstep End Date 04/01/05 15/10/09 251.4 wks 2.a Issue decrees to establish LT and appoint governance structure 2.a.ii Appoint LT Board of Directors or equivalent governance structure 04/01/05 01/07/07 131.4 wks 01/05/07 01/07/07 9.4 wks 2.b Setup Program Management Office (PMO) 02/07/07 07/09/07 10 wks 2.b.i Appoint PMO director, task force leaders and teams 02/07/07 27/07/07 4 wks MoT/ LT Board PMO Staff appointed 2.b.ii Develop and approve work program 30/07/07 07/09/07 6 wks LT Board/ HCP Work program approved NS 02/07/07 15/11/07 20 wks 2.c.i Develop LT Organizational Chart 02/07/07 24/08/07 8 wks LT Board Organizational Chart created NS 2.c.ii Appoint CEO and Level 1 Management Team 27/08/07 15/11/07 12 wks LT Board CEO and Level 1 appointed NS 10/09/07 20/03/08 28 wks 10/09/07 24/01/08 20 wks 10/09/07 01/11/07 8 wks 2.e Capitalize LT by transferring budget 2.e.ii Open bank account, define signature attorney, contract execution power 04/01/05 27/07/07 135.4 wks 02/07/07 27/07/07 4 wks 2.j Create LT brand and establish web presence 2.j.i Launch Procurement process and Prepare TOR for TA Consultant to develop a new brand for LT 10/09/07 15/10/09 110 wks 10/09/07 18/10/07 6 wks PMO RFP sent NS 10/09/07 18/10/07 6 wks PMO Website designed NS 2. Corporatize and Privatize Liban Telecom 2.c Create LT organizational structure 2.d Set up provisional opening balance and prepare asset transfer 2.d.i Perform full asset survey and valuation as per a pre-approved RFP 2.d.ii Develop Accounting policies 2.j.vi Design LT website Completed On Track Could be Delayed Duration Workstep Responsible Start Date Delayed MoT / CoM Deliverable/ Milestone LT governance structure appointed LT Board/ PMO/ HCP Asset survey performed Accounting policies LT Board / PMO developed LT Board / MoF Status Execution power contracted NS NS NS NS NS Not started 10 Program Dashboard Program Title: TEL-003: Privatize mobile telecom Natural Owner: Secretary General of HCP and Chairman Period: IMC: Infrastructure and Privatization July 2007 Achievements Since Last Report TRA Program Overall Status: Key Issues 4 mobile regulatory guidelines issued by the TRA (Interconnection Guidelines, SMP Guidelines, Consumer Affairs Guidelines, and Draft Quality of Service and Key Performance Indicators) New: None Contract signed with investment bank to undertake valuation of licenses Contract signed with TRA consultants Carried Over from Previous IMC: None Contracts signed with consultants to undertake financial and legal due diligence DoLLM within MoJ finalized the decision allowing the sale of the mobile assets when issuing new licenses KPI Mobile Regulatory Guidelines Issued by the TRA Mobile licensing process completion Note: (*) Defined in the legend Baseline (July 2007) 4 0% Current Value 4 25% Target Status (Closest Date) 12 (Dec. 2007) 100% (Dec. 2007) Budget Performance* Initial Budget $ 2,950,000 Revised Budget N/A Actual Spent N/A Remaining Budget Requirements Estimate N/A Status N/A 11 Detailed Workplan Progress -- Jul. 1, 2007 - Sep. 30, 2007 Program/ Initiative/ Workstep End Date 13/12/05 14/01/08 111 wks 02/04/07 28/12/07 40 wks 1.a.i Draft mobile telecom regulations 02/04/07 30/11/07 35.8 wks TRA Regulations drafted 1.a.ii Publish draft regulations on TRA website for review 08/06/07 03/12/07 26.2 wks TRA Draft regulations reviewed 1.a.iii Update draft regulations based on review 19/06/07 14/12/07 26.8 wks TRA Draft regulations updated 1.a.iv Issue telecom regulations 03/07/07 28/12/07 26.2 wks TRA Regulations issued 13/12/05 31/08/07 91.4 wks 1.b.iv Negotiate and sign contract with investment bank 14/07/06 06/07/07 52.6 wks Contract signed 1.b.v Perform valuation of licenses 09/07/07 31/08/07 8 wks HCP HCP supported by TRA 13/12/06 12/09/07 40.6 wks 1.c.iv Negotiate and sign contract with consultant 23/04/07 13/07/07 12.6 wks HCP Contract signed 1.c.v Conduct statutory audit of MIC accounts (2005-2006) 02/04/07 31/07/07 18 wks 1.c.vi Reconstruct cash flows (2004-2006) 01/08/07 29/08/07 4.2 wks 2005-2006 audit conducted 2004-2006 cash flows reconstructed 1.c.vii Conduct vendor due dilligence 01/08/07 12/09/07 6.2 wks HCP HCP/ MoT (OSB) HCP/ MoT (OSB) 06/12/06 25/09/07 43.4 wks 1.d.iv Negotiate and sign contract with consultant 1.d.v Present key findings from technical review and site visits and status of KPI analysis 27/02/07 27/07/07 23 wks HCP Contract signed 01/08/07 21/08/07 3 wks HCP Key findings presented 1.d.v Draft technical section for Information Memorandum 01/08/07 04/09/07 5 wks HCP IM technical section drafted 1.d.vi Undertake KPI analysis 01/08/07 04/09/07 5 wks HCP KPIs determined 1.d.vii Verify networks' asset register 01/08/07 25/09/07 8 wks HCP Asset register verified 1.d.viii Forecast CapEx over 12 month 01/08/07 25/09/07 8 wks HCP CapEx forecasted 1.d.ix Perform network asset replacement valuation 01/08/07 25/09/07 8 wks HCP Valuation performed 1. Privatize mobile telecom 1.a Draft and issue regulations (e.g., Interconnection, Competition, Consumer Guidelines, Universal Services, National Roaming) 1.b Perform valuation of licenses 1.c Perform financial due diligence 1.d Perform technical due diligence Completed On Track Could be Delayed Duration Workstep Responsible Start Date Delayed Deliverable/ Milestone Status Valuation report completed Vendor report submitted NS Not started 12 Program/ Initiative/ Workstep Workstep Responsible Start Date End Date 1.e Perform legal due diligence 01/12/06 07/09/07 41.6 wks 1.e.iv Review compiled contracts 1.f Define and finalize the legal basis for the transfer of ownership of mobile assets 26/03/07 07/09/07 25 wks 14/05/07 07/08/07 13 wks 1.f.ii Submit to Minister of Telecom for review 23/06/07 03/07/07 2 wks 1.f.iii Get legal advise from MoJ 04/07/07 31/07/07 4 wks Minister of Telecom Minister of Telecom 1.f.iv Submit to Council of Ministers for approval 01/08/07 07/08/07 1 wk TRA; HCP; CoM Documents approved 02/07/07 07/09/07 10 wks 1.g.i Draft auction guidelines 02/07/07 03/08/07 5 wks TRA; HCP 1.g.ii Draft rules and procedures related to assets lease/ sale 06/08/07 17/08/07 2 wks HCP 1.g.iii Draft rules and procedures related to license sale 06/08/07 17/08/07 2 wks TRA 1.g.iv Approve auction rules and procedures 20/08/07 24/08/07 1 wk CoM Auction guidelines drafted Assets rules and procedures drafted License rules and procedures drafted Auction rules and procedures approved 27/08/07 07/09/07 2 wks TRA; HCP Auction document finalized 31/08/07 02/11/07 9.6 wks 31/08/07 13/09/07 2 wks TRA; HCP 14/09/07 14/10/07 4.6 wks TRA; HCP Criteria adopted Technical proposals received 01/08/07 11/12/07 19.4 wks 1.i.i Draft IM 01/08/07 14/09/07 6.6 wks HCP; TRA IM drafted 1.i.ii Adopt IM 17/09/07 28/09/07 2 wks HCP; TRA IM adopted 26/09/07 19/10/07 4 wks HCP; MoT Documents compiled 10/09/07 03/12/07 12.6 wks 1.j.i Draft transaction documents 10/09/07 28/09/07 3 wks HCP; TRA 1.j.ii Provide comments on transaction documents 30/09/07 11/10/07 2 wks HCP; TRA 1.g Finalize auction rules and procedures 1.g.v Merge document and finalize it 1.h Publish Request for Applications (RFA), including pre-qualification/ qualification criteria, and review EoIs 1.h.i Adopt pre-qualification / qualification criteria 1.h.ii Publish RFA and receive technical bids 1.i Draft and distribute Information Memorandum (IM), and provide dataroom access and site visits 1.i.iv Compile data room's documents 1.j Review transaction documents based on bidders’ comments, and distribute revised documents Completed On Track Could be Delayed Duration HCP Delayed Deliverable/ Milestone Status Contracts reviewed Documents revised Legal advise received Transaction documents drafted Transaction documents revised NS Not started NS NS NS NS NS NS 13 Sector / Natural Owner Issues Register Issue ID Issue Level Issue Description Raised by Date Assigned to Actions Needed Deadline Status 17/07/2007 Delayed MoT/ TRA MoT and TRA to develop a detailed 27/07/2007 schedule for the transfer of documentation, information, and employees Minister of Telecom Minister of Telecom to approve schedule 03/08/2007 Delayed MoT/ TRA MoT and OGERO to transfer selected staff 20/08/2007 to TRA, after issuing an internal memorandum Delayed MoT/ TRA MoT to transfer frequency data to TRA TEL-001 H Need to speed-up the process in transferring documentation, information, and employees (e.g., TRA Radio Frequency, Licensing Chairman Authorizations, Studies) from MoT to TRA 05/07/2007 MoT/ TRA Transfer to be completed by October 1st, 2007 TEL-002 TEL-003 H H Need to appoint Liban Telecom Board of Directors or alternative governance structure Minister of Telecom / HCP SG / BAH TRA Need to finalize the decision on Chairman / whether to sell or lease the mobile HCP SG / assets when issuing new licenses BAH Delayed 15/05/2007 Minister of Telecom 01/10/2007 Not started MoT to assign PMO Members, who will report to the Steering Committee 18/05/2007 Delayed Appoint Liban Telecom Board 30/06/2007 Delayed Dept. of Minister of Telecom to transfer the file to 16/07/2007 Completed Legal & the Department of Legal and Legislation Legislation Matters (DoLLM) at the Ministry of Justice Matters (MoJ) DoLLM to decide if the assets can be sold 31/07/2007 Completed 15/05/2007 under the current Privatization Law (Assets can be sold) HCP SG HCP/TRA to proceed and accelerate development of tender documents in On-going On-going coordination with Citigroup/JP Morgan 14 Table of Contents GR PCO Planning & Monitoring Monthly Progress Reports – Telecom Sector – Power Sector – Transport Sector – CDR Next Steps 15 Program Dashboard Program Title: POW-001: Strengthen Sector PolicyNatural Owner: Minister of Energy and Water Making Capacity Period: July 2007 IMC: Program Overall Status: Infrastructure and Privatization Achievements Since Last Report Key Issues EDF hired to undertake the Power Sector Master Plan (July 3, 2007 – The program is financed by the AFD) New: None Carried Over from Previous IMC: None KPI National Control Center implementation Master Plan for generation and transmission development Note: (*) Defined in the legend Baseline (July 2007) In Progress Not Started Current Value In Progress Not Started Target Status (Closest Date) Completed (Oct. 2008) Completed (Jul. 2008) N/A Budget Performance* Initial Budget N/A Revised Budget N/A Actual Spent N/A Remaining Budget Requirements Estimate N/A Status N/A 16 Detailed Workplan Progress -- Jul. 1, 2007 - Sep. 30, 2007 Program/ Initiative/ Workstep End Date 03/07/06 30/06/09 159.2 wks 01/01/07 30/08/07 36 wks 1.b.vi Undertake negotiations with selected applicants 12/06/07 19/07/07 6 wks CDR and MoEW Negotiations undertaken 1.b.vii Award contract 20/07/07 23/08/07 5 wks CDR Contract awarded 1.b.viii Undertake formal signature 24/08/07 30/08/07 1 wk CDR Contract signed 01/03/07 28/12/07 45 wks 03/07/06 13/10/08 121.8 wks 11/12/06 23/07/07 33.6 wks EDL 1.d.viii Collect data and produce FAT database & displays 1.d.x Install and integrate the system, and get FAT submittal and approval 15/12/06 27/09/07 42.4 wks EDL HS/SW configuration defined FAT database and displays produced 05/03/07 24/10/07 35 wks EDL FAT installed and approved 1.e Hire consultants to develop a Master Plan for the Power Sector 03/07/07 26/06/08 52.8 wks 1.e.i Hire EDF to undertake Master Plan 03/07/07 03/07/07 0 wks 1.e.ii Develop Power Sector Master Plan 03/09/07 26/06/08 44 wks 1. Strengthen sector policy-making capacity 1.b Appoint qualified advisors at the Ministry of Energy and Water to support on strategic planning and evaluation of electricity policy reforms 1.c Complete Sector Expenditure Review with World Bank support 1.d Establish a National Control Center to properly dispatch EDL’s generation and transmission system 1.d.vii Define the HW/SW configuration and prepare Purchase Request and Procurement Completed On Track Could be Delayed Duration Workstep Responsible Start Date Delayed Deliverable/ Milestone EDF hired Power Sector Master Plan developed Status NS NS Not started 17 Program Dashboard Program Title: POW-002: Improve EDL Operational Efficiency Natural Owner: Minister of Energy and Water Period: July 2007 IMC: Program Overall Status: Infrastructure and Privatization Achievements Since Last Report Key Issues KEPCO agreed to perform Zouk power plant survey for free Grant Thornton started compilation of EDL’s 2005-2006 accounts, while working on 2002-2004 accounts towards defining an opening balance for 2005 New: None Carried Over from Previous IMC: Need to formalize KEPCO contract EDL to follow up with consultants on the preparation of a technical report on the viability of Jiyyeh power plant Advisors hired for MoEW, EDL and HCP might have different orientations, which could create conflicts or inconsistencies among their recommendations Baseline (July 2007) Current Value Non-Technical losses N/A N/A N/A N/A Bill collection rate N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A KPI Average number of electricity hours per day (Country-wide) Percent distortion in electricity distribution between regions Note: (*) Defined in the legend Target Status (Closest Date) Budget Performance* Initial Budget N/A Revised Budget N/A N/A N/A Actual Spent Remaining Budget Requirements Estimate N/A Status N/A N/A 18 Detailed Workplan Progress -- Jul. 1, 2007 - Sep. 30, 2007 Program/ Initiative/ Workstep End Date 01/02/06 31/12/09 207.2 wks 01/01/07 30/08/07 36 wks 2.a.vi Undertake negotiations with selected applicants 12/06/07 19/07/07 6 wks CDR and MoEW Negotiations undertaken 2.a.vii Award contract 20/07/07 23/08/07 5 wks CDR Contract awarded 2.a.viii Undertake formal signature 24/08/07 30/08/07 1 wk CDR Contract signed 01/02/06 07/09/07 85 wks 01/03/06 31/08/07 80 wks MoEW/EDL, MoF and BDL Conflict settled 2.b.iii Sign contract with KEPCO 2.c Award contracts for the supervision of the KEPCO O&M activities for Beddawi and Zahrani plants 03/09/07 07/09/07 1 wk MoEW/EDL Contract signed 03/09/07 08/04/08 32 wks 2.c.i Develop TOR for the supervision of the KEPCO O&M activities 2.d Decide on the viability of the Zouk and Jiyyeh plants, and rehabilitate viable existing power plants 03/09/07 12/02/08 24 wks MoEW/EDL TOR for the supervision of KEPCO 01/06/06 18/12/07 82.6 wks 2.d.ii Develop short-list of interested companies 2.d.iii Open discussions with KEPCO on undertaking the study for free 2.d.iv Undertake survey on the viability of Zouk and Jiyyeh power plants 2.d.v Draft and submit report on viability of Zouk and Jiyyeh power plants 2.e Complete the expansion and rehabilitation of the 220KV transmission network 2.f Complete the auditing of EDL financial statements from 2002 to 2006 01/01/07 18/12/07 52 wks 02/07/07 01/08/07 4.6 wks 03/09/07 07/09/07 1 wk 10/09/07 21/09/07 2 wks 09/01/07 30/06/08 79.4 wks 01/02/07 02/03/09 111.2 wks 2.f.vi Prepare preliminary Audit Reports 2003 2.j Improve procurement process of fuel and gas oil, to ensure better quality and reduce high premiums 02/07/07 28/09/07 65 days 01/08/07 19/12/08 74 wks 01/08/07 22/10/07 12 wks 01/01/07 31/03/08 66.4 wks 2. Improve EDL operational efficiency 2.a Appoint consultancy team at EDL to perform operational, financial, accounting, legal and contract management activities, including coordinating and assisting the HCP and its advisory team in the corporatization and privatization of EDL 2.b Formalize KEPCO contract 2.b.ii Settle conflict over the contract with KEPCO 2.j.i Organize stakholders' meeting to identify potential issues 2.m Complete the infrastructure needed for the Ksara station (including 400 KV network) to allow Lebanon’s integration into the regional electrical network known as the “Seventh Joint” Completed On Track Could be Delayed Duration Workstep Responsible Start Date Deliverable/ Milestone Short-list of interested MoEW/EDL companies MoEW/EDL and HCP Survey on the viability of MoEW/EDL Zouk and Jiyyeh conducted Report on the viability of MoEW/EDL Zouk and Jiyyeh submitted MoEW/EDL 2003 audit report prepared MoEW Stakholders' meeting Delayed NS Not started Status NS NS NS 19 Program Dashboard Program Title: POW-003: Corporatize and Privatize Natural Owner: Secretary General of the HCP EDL Period: July 2007 IMC: Program Overall Status: Infrastructure and Privatization Achievements Since Last Report Key Issues Consensus on approach regarding CRA issue (1.2 million meters vs. 16,800 pilot meters) reached New: None RFPs for technical and accounting advisory services for the IPP project issued Negotiations with winning bidder to assist HCP with the corporatization of EDL completed Carried Over from Previous IMC: Contract consultants to undertake EDL asset registration and valuation Baseline (July 2007) Current Value Asset registry Not Started Not Started Legal due diligence Not Started Not Started New EDL launch plans Not Started Not Started KPI EDL Corporatization 5% 5% Establishment of additional production capacity through IPPs 10% 15% Collection Management and Metering 15% 15% Note: (*) Defined in the legend Target Status (Closest Date) Completed N/A (Dec. 2008) Completed N/A (Apr. 2008) Completed N/A (Mar. 2008) Completed (Dec. 2008) Completed (Dec. 2009) Completed (Jun. 2008) Budget Performance* Initial Budget N/A Revised Budget N/A Actual Spent N/A Remaining Budget Requirements Estimate N/A Status N/A 20 Detailed Workplan Progress -- Jul. 1, 2007 - Sep. 30, 2007 Program/ Initiative/ Workstep End Date 02/09/02 31/12/10 438 wks 01/01/07 30/08/07 36 wks 3.a.vi Undertake negotiations with selected applicants 12/06/07 19/07/07 6 wks CDR and MoEW Negotiations undertaken 3.a.vii Award contract 20/07/07 23/08/07 5 wks CDR Contract awarded 24/08/07 30/08/07 1 wk CDR Contract signed 02/09/02 24/03/08 292.4 wks 15/05/07 27/09/07 20 wks 28/09/07 03/10/07 01/08/07 3. Corporatize and Privatize EDL 3.a Retain consultants to assist the HCP with the corporatization and restructuring of EDL 3.a.viii Undertake formal signature 3.b Establish the Electricity Regulatory Authority and define its financial and organizational structures 3.b.iii Undertake interviews with candidates Duration Workstep Responsible Start Date Deliverable/ Milestone Status NS 1 wk MoEWMinister of Interviews with candidates CoM, Energy and Water ERA Board appointed NS 19/11/07 16 wks CoM Decrees Issued NS 02/10/06 11/04/08 82 wks 03/04/07 17/10/07 29.2 wks MoEW, HCP 03/04/07 07/07/07 14.4 wks MoEW, HCP 3.c.viii Present interested bidders list to PM and Minister of EW 3.c.ix Develop and issue the tender document to prequalified bidders, and launch open data room 09/07/07 30/07/07 3.2 wks MoEW, HCP CMM website developed Pre-qualification documents received Interested bidders list presented 09/04/07 16/08/07 19.2 wks MoEW, HCP 3.c.x Manage bidding process 17/08/07 29/09/07 6.2 wks MoEW, HCP 02/10/06 24/01/08 70.6 wks 03/04/07 17/10/07 29.2 wks MoEW, HCP 03/04/07 07/07/07 14.4 wks MoEW, HCP 09/07/07 30/07/07 3.2 wks MoEW, HCP 09/04/07 16/08/07 19.2 wks MoEW, HCP 17/08/07 29/09/07 6.2 wks MoEW, HCP Tender documents issued Bidding documents submitted 13/04/07 12/12/08 89 wks 04/07/07 08/10/07 14 wks HCP Contracts signed 3.b.iv Appoint ERA Board 3.b.v Issue decrees to define ERA organizational and financial structure, and compensation/ benefits 3.c Launch and award tender for the installation and operation of remote meters 3.c.v Develop and update CMM website for FAQ and source of all documentation 3.c.vii Develop, issue and receive prequalification documents to interested bidders 3.d Launch and award tender for service contracts for distribution 3.d.v Develop and update CMM website for FAQ and source of all documentation 3.d.vii Develop, issue and receive prequalification documents to interested bidders 3.d.viii Present interested bidders list to PM and Minister of EW 3.d.ix Develop and issue the tender document to prequalified bidders, and launch open data room 3.d.x Manage bidding process 3.e Develop additional generation capacity through IPP: Install additional capacity in Deir Ammar with private sector participation 3.e.ii Retain specialized consultants to provide technical and accounting advisory services Completed On Track Could be Delayed Delayed Tender documents issued Bidding documents submitted CMM website developed Pre-qualification documents received Interested bidders list presented NS Not started 21 Sector / Natural Owner Issues Register Issue ID Issue Level Issue Description Raised by Date Assigned to Actions Needed Stakeholders to agree on a solution to provide credit line to KEPCO POW-001 H Need to formalize KEPCO contract EDL Lack of consensus on approach regarding CRA issue (1.2 million meters vs. 16,800 pilot meters) POW-002 H POW-003 M A technical report on the viability of Zouk and Jiyyeh plants should be IMC developed POW-004 M No stakeholder assigned to undertake EDL asset registry POW-005 M Need to shift focus of auditors to EDL’s 2005-2006 accounts (or have them work in parallel on 2002-2004 and 2005-2006 accounts) BAH EDL Status 24/07/2007 Delayed 05/07/2007 MoF/ BDL Agree on clear assignment of roles and 24/07/2007 Completed responsibilities pertaining to the CRA 16,800 by Minister of contract, including the number of meters to MoEW and Energy be installed in both the short and long 1.2M by 05/07/2007 and Water terms HCP (incl. / EDL / funding) with HCP support from MoEW EDL to follow up with consultants on the 31/07/2007 Completed preparation of a technical report on the viability of Zouk 05/07/2007 EDL EDL to follow up with consultants on the 31/07/2007 Delayed preparation of a technical report on the viability of Jiyyeh Contract consultants to undertake EDL 01/10/2007 In progress asset registration and valuation 05/07/2007 HCP EDL/MoF HCP Deadline 05/07/2007 EDL Need to quickly secure funding for Grant Thornton 31/07/2007 Completed Grant Thornton to start compilation of 20/08/2007 Completed EDL’s 2005-2006 accounts, while working on 2002-2004 accounts towards defining an opening balance for 2005 22 Sector / Natural Owner Issues Register Issue ID POW-006 POW-007 Issue Level Issue Description Raised by H MoEW could consider the LNG option as an alternative to Natural Gas Minister of Energy and Water and CDR President H Advisors hired for MoEW, EDL and HCP might have different Minister of orientations, which could create Finance conflicts or inconsistencies among their recommendations Date 05/07/2007 Assigned to HCP and CDR Actions Needed HCP and CDR to request from their consultants to include the assessment of the supply of LNG to the Beddawi plant within their scope of work Deadline Status 20/08/2007 Completed Current Infrastructure & Privatization IMC 31/08/2007 In progress Sub-Committee (PM, MoEW, EDL, HCP, MoF) to steer the work of all advisors: The Minister of scope of work of EDL advisors should be Energy channeled toward preparing for the set 05/07/2007 and Water form corporatization, once sector strategy / EDL / is agreed HCP Reinforce the Sub-Committee with some Technical Assistance 23 Table of Contents GR PCO Planning & Monitoring Monthly Progress Reports – Telecom Sector – Power Sector – Transport Sector – CDR Next Steps 24 Airport privatization roadmap and ports privatization approach were developed by the GR PCO consultant, and need to be discussed with the Minister of Transport and HCP Secretary General Transport Sector Progress Following the request of the Prime Minister and the Minister of Transport during the last IMC, the GR PCO consultant developed the following: – Air Transport: Detailed roadmap for the privatization of the Beirut Rafic Hariri International Airport (BRHIA) – Maritime Transport: Approach to privatizing the different ports, including quick-wins These proposals need to be discussed and finalized with the Minister of Transport and HCP Secretary General 25 Sector / Natural Owner Issues Register Issue ID Issue Level Issue Description Raised by Date Assigned to GR PCO TRA-001 H Minister of Strategy relating to privatization of Transport / other public entities (e.g., airport, Minister of ports) still under development Finance Actions Needed Develop transport sector privatization roadmap, within scope of current legislation Deadline Status 31/07/2007 Completed 15/05/2007 Minister of Align transport sector stakeholders on Transport/ privatization roadmap HCP SG 10/08/2007 Delayed 26 Table of Contents GR PCO Planning & Monitoring Monthly Progress Reports – Telecom Sector – Power Sector – Transport Sector – CDR Next Steps 27 Program Dashboard Program Title: CDR-001: Restructure CDR’s capacity to undertake investments Natural Owner: President of CDR Period: July 2007 IMC: Program Overall Status: Infrastructure and Privatization Achievements Since Last Report Key Issues None New: None Carried Over from Previous IMC: None KPI Percentage of vacant key positions filled Note: (*) Defined in the legend Baseline (July 2007) Current Value 0% 0% Target Status (Closest Date) 100% (Dec. 2007) Budget Performance* Initial Budget $ 2,000,000 Revised Budget N/A Actual Spent N/A Remaining Budget Requirements Estimate N/A Status N/A 28 Detailed Workplan Progress -- Jul. 1, 2007 - Sep. 30, 2007 Program / Initiative/ Workstep 1. Restructure CDR’s capacity to undertake reconstruction & development investments 1.a Strengthen the capacity of CDR’s procurement, financial and project management, planning, and legal functions 1.a.i Prepare first list of job vacancies and profiles 1.a.ii Announce the available job vacancies 1.b Streamline related internal procedures from bidding and terms of reference preparations to contracts management and 1.b.i Draft law s on new procurement procedures Completed Start Date End Date 15/07/07 31/07/08 55.8 w ks 15/07/07 31/12/07 25.2 w ks Workstep Responsible Deliverable/ Milestone 15/07/07 15/08/07 4.8 w ks CDR, OMSAR Job vacancies list prepared 03/09/07 01/10/07 4.6 w ks CDR, OMSAR Job vacancies published 15/09/07 31/07/08 46.4 w ks CDR New procurement law s drafted 15/09/07 On Track Duration 15/10/07 Could be Delayed 4.6 w ks Delayed Status NS NS NS Not started 29 Program Dashboard Program Title: CDR-002: Develop Public Investment Plan for 2009-2012 Natural Owner: President of CDR Period: July 2007 IMC: Program Overall Status: Infrastructure and Privatization Achievements Since Last Report Key Issues Public Investment Plan guidelines prepared New: None Carried Over from Previous IMC: None KPI Note: (*) Defined in the legend Baseline (July 2007) Current Value Target Status (Closest Date) Budget Performance* Initial Budget N/A Revised Budget N/A Actual Spent N/A Remaining Budget Requirements Estimate N/A Status N/A 30 Detailed Workplan Progress -- Jul. 1, 2007 - Sep. 30, 2007 Program/ Initiative/ Workstep 2. Develop Public Investment Plan for 2009-2012 2.a Develop a Public Investment Plan (PIP) for 2009-2012 Completed On Track Start Date End Date 05/07/07 05/09/07 9.4 wks 05/07/07 05/09/07 9.4 wks Could be Delayed Duration Delayed Workstep Responsible CDR Deliverable/ Milestone Status PIP developed NS Not started 31 Sector / Natural Owner Issues Register Issue ID Issue Level Issue Description Raised by Date Assigned to Actions Needed Deadline Status A Task Force including the CDR, MoF and 23/07/2007 Completed the Office of PCM to be created in order to oversee the development of the Public Investment Plan CDR-001 H CDR needs to develop a Public Investment Plan aligned with Paris CDR III requirements CDR President, CDR and Ministry of Finance to coordinate 20/08/2007 Completed Minister of the preparation of a preliminary Public 05/07/2007 Finance, Investment Plan to be ready for the next and Office IMC of PCM CDR and Ministry of Finance to coordinate 09/09/2007 In progress the development of a draft Public Investment Plan for 2009-2012 32 Table of Contents GR PCO Planning & Monitoring Monthly Progress Reports – Telecom Sector – Power Sector – Transport Sector – CDR Next Steps 33 Next Steps Actions Required Telecom Sector: – Appoint Liban Telecom Board in order to proceed with the corporatization process – Transfer relevant documentation and information from the Ministry of Telecom to TRA – Transfer TRA budget Power Sector: – Formalize KEPCO contract – Follow up with consultants on the preparation of a technical report on the viability of Jiyyeh – Channel the scope of work of EDL advisors toward preparing for the set form corporatization, once sector strategy is agreed Transport Sector: – Align key stakeholders on a roadmap for implementing priority programs – Develop Commitment Document CDR: – Coordinate with MoF the development of a draft Public Investment Plan for 2009-2012 Sign Commitment Documents for all Infrastructure & Privatization IMC 34